Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-164-82 Engineering Evaluation Of Radon Daughter Removal TechniquesBy Donald B. Lindsay
This report presents the findings of an investigation into the characteristics of a number of techniques for cleaning ambient air with special emphasis on their applicability to the removal of the sho
Jan 1, 1978
-
OFR-164-83 Evaluation Of Bulkheads For Radon ControlBy Clifford H. Summers
This report describes an experimental program which we conducted on behalf of the U. S. Bureau of Mines, to select from currently available materials two novel systems of construction for air-restrain
Jan 1, 1982
-
OFR-165-77 Evaluation Of Experimental And Developmental Communication Systems Used In Underground Coal Mines - Performance Of Trapped-Miner Communication SystemBy P. L. Michael
Several evaluations were made by Modified Rhyme Test (MRT) word lists transmitted through various simulations of the Trapped-Miner Communication System being developed by the U.S. Bureau of Mines. The
Jan 1, 1977
-
OFR-165-83 Development Of A Nondestructive Test Device For Friction Rock SupportsBy R. Lusignea
A device has been developed for nondestructive testing the holding power of split tube friction rock supports. It operates by measuring the amount of decrease in internal volume when the support is fo
Jan 1, 1983
-
OFR-166(1)-82 Selective Placement Of Strip Mine Overburden In The United States - I Contract ReportThe selective placement of coal strip mine overburden is examined. Physical end chemical properties of spoil detrimental to revegetation and groundwater are detailed. The United States is divided into
Jan 1, 1981
-
OFR-167-82 Selective Placement Of Strip Mine Overburden In Montana - V Summary ReportBy D. J. Dollhopf
The objective of this five year study was to investigate the means of establishing non-polluted ground-water and root zone systems in areas where surface mining intercepts physiochemically unsuitable
Jan 1, 1981
-
OFR-168-83 Recommended Acceptance Criteria For Potting Materials Used In Explosion Proof Enclosures In Coal MinesBy W. R. Herrera
A research effort was conducted to present or develop methodology for evaluating candidate potting materials intended for use in explosion-proof enclosures. The primary purpose was to develop acceptan
Jan 1, 1982
-
OFR-169-82 Guideline Manual For Front-End Loader Load -And-Carry ApplicationsBy James W. Martin
This user's manual analyzes the application, selection and performance of front-end loaders in mining operations which can effectively utilize their load-and-carry capability. All aspects of the
Jan 1, 1981
-
OFR-169-83 Low Glare Luminaire For Thin Seam MiningBy John R. Parker
Work places of an underground coal mine are required (30 CFR 1719) to be illuminated while self-propelled equipment is used. Permissible machine mounted systems have been developed and applied satisfa
Jan 1, 1982
-
OFR-17(1)-77 Conceptual Design Of An Automated Longwall Mining System Phase I - Survey Of Operating Longwalls ? 1. Introduction ? 1.1 Authorization For This Work And Its PurposeThis report is in partial fulfillment of Contract S0241051 awarded to COMINEC on June 27, 1974. 'Me purpose of the work under this contract is to develop a conceptual design for an automated long
Jan 1, 1975
-
OFR-17(2)-74 Develop, Assemble And Install A Permissible Surveillance And Communication System In The Bureau Of Mines Mining And Safety Research Center Coal Mine At Bruceton. Pennsylvania - Volume II - Circuits And Installation - 1. IntroductionThe mine surveillance and communication system hereafter described provides continuous local and remote monitoring of several parameters critical to normal mine operation at each of ten underground si
Jan 1, 1973
-
OFR-17(2)-77 Conceptual Design Of An Automated Longwall Mining System - Phase II - State Of The Art SurveyTo develop a conceptual design for an automated longwall mining system, one should know what has been done, what is being done today and what is being planned for tomorrow. The bibliography referenced
Jan 1, 1975
-
OFR-17(3)-77 Conceptual Design Of An Automated Longwall Mining System - Volume I - Final Report ? Executive SummaryThis report provides concepts for two automated longwall mining systems; one for operation in a 42 to 57-inch thick section of the Lower Kittanning coal seam, the other in a 57 to 72-inch thick sectio
Jan 1, 1976
-
OFR-17-82 Field Survey Of Float Dust In Coal Mining OperationsBy J. A. Kost
The objectives of this contract were to determine the amount, size, and deposition of float coal dust (74 x 10 microns) generated during the mining and transporting of coal in underground U.S. mining
Jan 1, 1981
-
OFR-171-82 Boulder Handling And Blasting For Greater Safety And Efficiency In CrushersBy Michael F. Dunn
Since crushing of rock to a smaller size is an integral part of almost any mining and quarrying operation, a study was carried out to identify and develop improved techniques for alleviating a major c
Jan 1, 1981
-
OFR-172-82 Sealant Tests To Control Radon Emanation In A Uranium MineBy Donlad B. Lindsay
This report describes a field-test program to determine the effectiveness of a polymeric wall sealant to reduce the excape of naturally occurring radio-active gas radon from the walls of an undergroun
Jan 1, 1981
-
OFR-173-82 Development Of Improved Topsoil Handling TechniquesBy Michael Mancuso
This report summarizes the problems of topsail handling as related to present requirements of law and current equipment availability. The most prevalent topsoiling systems are reviewed along with a li
Jan 1, 1981
-
OFR-174-82 Impact Of Surface Mining On Soil Compaction In The Midwestern U.S.A.By Steve C. Albrecht
The objective of this study is "to assess the impact of surface mining on soil compaction in the Midwest". The study revolves around a unique field sampling program targeted at four mine sites utilizi
Jan 1, 1982
-
OFR-176-82 Development Of A DC Current Limiting Interrupting System For MinesBy Howard B. Hamilton
A switching system for high fault current 300 and 600 volt DC trolley and haulage systems, as used in the mining industry is presented. The system consists of paralleled main and auxiliary contactor c
Jan 1, 1982
-
OFR-177(3)-83 Electrical-Shock Prevention - Volume III - Fault Protection For Motion-Drive EquipmentBy L. A. Morley
Volume III of the final report examines the indication versus interruption procedures used on motion-drive power equipment, with emphasis on surface excavators. The report begins with a review of the
Jan 1, 1982