Search Documents

Sort by

  • SME
    Optimal pitwall shapes to increase financial return and decrease carbon footprint of openpit mines

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL

    The steepness of an openpit mine’s slopes has a substantial influence on the mine’s financial return. This paper proposes a novel design methodology where overall steeper pitwalls are employed without

  • SAIMM
    Optimal planning of extracting works at the quarries of non-ferrous metallurgy of Kazakstan

    By I. V. Lunkin, E. B. Muhamedzhanov, A. B. Begalinov, B. R. Rakishev

    Almost all the ore deposits of ferrous, non-ferrous and rare metals of Kazakstan, are exploiting by the open-cast method, are the complex-structural, multi-component ones. Their rational working requi

    Jan 1, 2003

  • IMPC
    Optimal Selection Of Grinding Medium For A Drum Mill

    By M. Vulkov

    The paper is focused on the optimal selection of grinding medium for a drum mill. The decision-making is based on the fuzzy multiple attribute approach. One way to optimize the grinding process in a t

    Sep 1, 2012

  • SME
    Optimal Synthesis Of An Industrial Fluorspar Beneficiation Plant Using A Jumping Gene Adaptation Of Genetic Algorithm

    By C. Guria

    A modeling, simulation and optimization study of a complex industrial fluorspar beneficiation plant (Kadipani, Gujarat, India) with fourteen/ten flotation banks is carried out to find an optimum/near-

    Jan 1, 2009

  • SAIMM
    Optimal Valuation And Kriging - 9.1 Definitions: Kriging Estimator And Kriging Error

    [Consider a square block W in an ore body S2, to be valued from one centre sample w, and one corner sample w2 (Fig. 9.1). The sample set is ws = Iw,;w21. We can estimate the block average µw by the a

    Jan 1, 1978

  • IIMP
    OptimalSlope: a software determining optimal pitwall shapes of maximum Overall Slope Angles leading to increased financial returns and reduced mining carbon footprint

    By Stefano Utili, Robert Pell, Nelson Morales, Cristobal Valderrama, Andrea Agosti, Guillermo Albornoz

    The overall slope angle (OSA) of pit walls plays a crucial role in the financial return of open pit mines. The work showcases a novel design methodology where non-planar geotechnically optimal pit wal

    Sep 30, 2022

  • SAIMM
    Optimisation and Prediction of Co3+-Enhanced Dissolution in Sulfuric Acid

    By B. Mbuya, A. F. Mulaba-Bafubianda, J. M. Mvita

    The paper explains the main effects of input leaching parameters, such as addition of a reducing agent, acidity, agitation, temperature, and leaching system potential, in relation to observed and pred

    Jan 1, 2023

  • IMPC
    Optimisation Aspects of Compressive Crushing

    Compressive crushing is applied in crushing plants used in mineral, mining, and aggregate in-dustry for fragmentation of rock materials. From a global perspective, the total volume of crushed rock is

    Jan 1, 2014

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited

    By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD

    This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the

    Jan 1, 1985

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • AUSIMM
    Optimisation of Rotary Drilling

    Optimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad

    Jan 1, 1995

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010