Search Documents

Sort by

  • IMPC
    Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive Sensor

    The ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att

    Sep 1, 2012

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • SAIMM
    Optimising blend ratios, grinds, and reagent schemes to recover platinum group metals from lower group reef spiral tailings

    By J. Sehata, J. Tshilongo, I. Govender, S. Pikinini, T. L. Moodley, M. Raedani

    In the face of dwindling Merensky ore reserves in the early 1990s, Mintek developed the MF2 flotation circuit to economically recover platinum group metals from the shallow upper group-2 chromitite re

    Mar 6, 2026

  • AUSIMM
    Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon Scout

    By T D. H McGrath, O Baker, W P. Staunton, C Ypelaan

    "The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir

    Oct 10, 2016

  • AUSIMM
    Optimising carbon reactivation kiln operation

    By R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin

    Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno

    Sep 11, 2017

  • IMPC
    Optimising Flotation Innovations and the Role of Plant Testwork

    Optimising flotation designs and innovations is a complex process involving many parameters, one of which is ensuring sufficient testwork is carried out at plant level before these innovations are lau

    Jan 1, 2014

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Optimising Project Value and Robustness

    By W Stange, N Hanson

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • AUSIMM
    Optimising the Drilling Budget with Geophysical Logging

    By Fullagar P. K

    In resource definition and mine development, major capital expenditures are committed on the basis of sparse information and even in production surprises such as bad ground are not uncommon. Drill h

    Jan 1, 1997

  • AUSIMM
    Optimising the Long Term Profit base for Consolidated Rutile Limited

    Consolidated Rutile Limited (CRL) was one of the best performing mining stocks of the turbulent 1980s, having a very high payout of franked dividends. In contrast to some other mining groups, it was

    Jan 1, 1991

  • SAIMM
    Optimising the ramp design in an open pit mine APCOM 2021

    By I. Kaabachi, F. Meunier, N. Morales

    In open pit mining, ore and waste are hauled outside of the excavation area by trucks that move along a system of ramps. The design of these ramps must be carefully addressed because they have to comp

    Sep 1, 2021

  • AUSIMM
    Optimising Underground Mining Strategies

    By A M. Ebbels

    "Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi

    Mar 8, 2016

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • IIMP
    Optimización de la logística del concreto en operaciones subterráneas

    By Gerson León Cervantes

    El presente texto evalúa la mejor opción técnico-económico para el transporte de concreto lanzado (shotcrete) a interior mina. Para ello, se evalúan tres alternativas logísticas excluyentes: el prime

    Feb 1, 2013