Search Documents

Sort by

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    An integrated and balanced approach to developing pre-concentration technologies across the mining value chain

    By G J. Wilkie, P A. Revell

    The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with

    Nov 10, 2020

  • CIM
    An Integrated Approach for Heavy Metal Remediation Using Sorbents Synthesized from Waste Residues

    By K. Ghyselbrecht, R. Swennen, Y. W. Chiang, V. Cappuyns, R. M. Santos, T. Van Gerven, B. Meesschaert

    Heavy metal contamination from mining and metallurgical activities of aquatic systems poses significant risk to the environment and human populations. The investigation of the distribution and immobil

    Jan 1, 2011

  • SAIMM
    An integrated approach of apatite-nepheline beneficiation plant revamp for yield increase: case study of beneficiation plants ANOF-2 and ANOF-3, А. Klemyatov, N. Rozhdestvenskiy, А. Kalugin, S. Zbinets, U. Gordeeva, and T. Vologdina

    By А. Klemyatov, T. Vologdina, U. Gordeeva, S. Zbinets, А. Kalugin, N. Rozhdestvenskiy

    The plants integrated in the PhosAgro group of companies perform processes from scientific research to the project, from ore mining to shipment of fertilisers and feed additives to consumers. An exten

    Jan 1, 2020

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    An Integrated Approach Towards the Optimisation of Ventilation, Air Cooling and Pumping Requirements for Hot Mines

    This paper contends that optimisation of energy resources through active control and predictive simulation modelling is possible, and that such monitoring leads to large savings in the electricity cos

    Jan 1, 2005

  • TMS
    An Integrated Bioremediation Route For Heavy Metal, Contaminated Land Based On The Sulfur Cycle

    By H. Eccles

    BNFL, an internationally acclaimed company noted for its nuclear fuel cycle services and waste management technologies, collaborated with Viridian BioProcessing Ltd, a small company acknowledged for d

    Jan 1, 1996

  • CIM
    An Integrated Liberation-Leach Model (ILLM) to Evaluate Gold Liberation and its Impacts on Gravity Recovery and Leaching

    By Curtin University Western Australian School Mines

    "Curtin University’s Gold Technology Group has developed an online CIP/CIL simulation model called SIMCIL which has been used since 1999 to model and simulate industrial leach-adsorption circuits. Rec

    Jan 1, 2016

  • SME
    An Integrated Method to Classify Ground-Fall Accidents and to Estimate Ground-Fall Trends in U.S. Mines Using Machine Learning Algorithms - SME Annual Meeting 2024

    By Yuting Xue, Gamal Rashed, Zoheir Khademian, Connor Brown, Khaled Mohamed

    Ground falls in U.S. underground coal mines can lead to significant consequences, including loss of life, injuries, damaged equipment, and production stoppage. Improving the safety of the workplace is

    Feb 1, 2024

  • SME
    An Integrated Mine Plan - Connecting Long, Medium and Short Term Planning Strategies at Goldcorp Peñasquito

    By R. E. Vivas

    Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world-class, poly-metallic deposit that sta

    Feb 23, 2014

  • SME
    An Integrated Mine Plan: Connecting Long-, Medium- And Short-Term Planning`

    By Vivas

    Goldcorp is one of the largest gold producers in the world with projects in South, Central and North America. Goldcorp?s flagship operation is Peñasquito, a world class, polymetallic deposit that star

  • TMS
    An Integrated Model for Microwave Thermal Processing

    By J. Tang, B. Q. Li, R. Akarapu

    "An integrated model is developed to represent the three-dimensional electromagnetic wave propagation and thermal phenomena during microwave heating of ceramics and dielectric/biological materials. Th

    Jan 1, 2004

  • SME
    An Integrated Multi Objective Multi Stage Mining Fleet Management System Linking Dynamic Operation to Short-Term Plan

    By S. Upadhyay, A. M. Afrapoli

    "Fluctuation in market price of mineral products has enforced mining companies to cut down their operating costs. One useful way of reducing operating costs in mining operations is to make optimal ope

    Jan 1, 2018

  • AUSIMM
    An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part A - Crushing and Grinding

    By M Korte, J McMaster, C Brent

    The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and has increased production from the original 119 t/h design capacity to a milling throughput of 265 t/h in

    Jan 1, 2009

  • AUSIMM
    An Integrated Optimisation Study of the Barrick Osborne Concentrator: Part B - Flotation

    By T Gibbons, M Korte, C Brent, K Runge

    The Barrick Osborne concentrator has gone through a number of upgrades since commissioning and steadily increased production from the original 119 t/h design capacity to 265 t/h milling throughput in

    Jan 1, 2009

  • AUSIMM
    An Integrated Procedural Approach that Increases Value to Underground Mine Planning

    The value derived by good mine planning is often underestimated as many mines steer their attention to the more immediate and more easily recognised successes made by the day-to-day operational æbush

    Jan 1, 2009

  • SME
    An Integrated Process For Recovery Of Coal Fines From Waste Streams Using The Packed Flotation Column

    By D. C. Yang

    A practical and economical flowsheet has been developed and demonstrated by integrating the packed column flotation with the GranuFlow process for fine coal recovery. Orimulsion, which was used as an

    Jan 1, 1998

  • TMS
    An Integrated Steel Plant for the Year 2000

    By Ian F. Hughes

    "Concepts of an integrated steel plant for sheet products to be built and operating in the year 2000 will be described. The design and operating methodology of this market driven facility will integra

    Jan 1, 1988

  • TMS
    An Integrated Strategy for Whole Ecological Utilization of Typical Industrial Solid Wastes in China

    By Yong Li, Tao Jiang, Xiangxin Xue, He Yang

    "In this paper, we describe the current status and research progress on the utilization of typical industrial solid wastes in China. We propose a creative method called “eco-utilizing wastes” with an

    Jan 1, 2012