  • SME
    Optimizing The Siting And Grading Of Leach Pads

    By S. J. Taylor

    The siting, grading and fill usage for leach pads are important aspects of leach pad design. A method is presented that optimizes the cut and fill quantities (i.e. minimizes the cost) required to grad

    Jan 1, 1996

  • SME
    Optimizing The Value Of A Sample

    By Gustavo G. Pilger, Jair C. Koppe, João Felipe C. L. Costa

    Information for mine planning requires to be close spaced, if compared to the grid used for exploration and resource assessment. The additional samples collected during quasi-mining are frequently loc

    Jan 1, 2002

  • SME
    Optimizing Truck and Haul Road Economics

    By M. David Monroe

    Getting the best match between truck and haul road requires examining the cost effects of many factors. Most mines use a bottom line measure based on cost per ton of material moved. This measure focus

    Jan 1, 1992

  • SME
    Optimizing Truck And Haul Road Economics (5fcf97a8-f2f5-450a-adfd-a1ffc956870d)

    By M. D. Monroe

    Getting the best match between truck and haul road requires examination of many factors and their effect on the bottom line. Most mines use a bottom line measure based in some way on cost per ton of m

    Jan 1, 1992

  • SME
    Optimizing Truck-Loader Matching

    By W. Morgan, D. Gove

    In truck and shovel operations, productivity and cost per ton are influenced by the system matching choice, Optimization involves a balance of the size and number of trucks, the size and type of loadi

    Jan 1, 1995

  • SME
    Optimizing Truck-Loader Matching Using Fleet Production And Cost To Optimize Truck-Loader Match

    By D. Gove

    All mining operations using trucks have a common need to properly match the number and size of hauling units (trucks. wagons. scrapers. etc.) to a loading unit (wheel loader. hydraulic shovel/excavato

    Jan 1, 1994

  • SME
    Optimum auxiliary fan location to control air recirculation

    By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal

    This paper presents the results of a study on the optimum auxiliary fan location to control air recirculation in dead-end workings where diesel-powered vehicles operate. Investigations were conducted

    Jul 1, 2023

  • SME
    Optimum Auxiliary Fan Location to Control Air Recirculation (Mining, Metallurgy & Exploration)

    By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal

    This paper presents the optimum auxiliary fan(s) location to control air recirculation in dead-end workings where dieselpowered vehicles operate. Investigations were conducted with various secondary f

    Oct 18, 2022

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam LongwallWorkings in India Mining, Metallurgy and Exploration

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SAIMM
    Optimum Coal Mine: Striving Towards A 'Zero Effluent' Mine - Synopsis

    By V. E. Cogho

    Optimum Coal Mine comprises numerous defunct, active, and future mining sections. The mine is primarily a large opencast coal mine; however, underground mining activities will be increasing steadily o

    Jan 1, 2012

  • SAIMM
    Optimum Design of an Open Pit

    By D. A. Phillips

    A procedure for designing an optimum pit to yield maximum profit is described. The volume in which a possible pit is considered is divided into discrete blocks, each of which is assigned an economic v

    Jan 1, 2014

  • SME
    Optimum Design Of Mining Structures

    By S. J. Jung

    The stability of underground openings for deep mines is critical, since incorrect orientation or geometry of shaft, stope, and accessways often results in the failure of openings due to high stress co

    Jan 1, 1994

  • CIM
    Optimum Design of Open-Pit Mines

    By Helmut Lerchs

    An open-pit mining operation can be viewed as a process by which the open surface of a mine is continuously deformed. The planning of a mining program involves the design of the final shape of this op

    Jan 1, 1965

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • SME
    Optimum Drilling And Blasting Procedures

    In some 35 years in the explosive and construction industries, we have probably seen the extremes in drilling and blasting practices. All of you know that it is difficult if not impossible, to separat

    Jan 1, 1986

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • TMS
    Optimum Feed Preparation for Sulfide Smelting

    By Jyri Talja, Shaolong Chen, Hannu Mansikkaviita

    "For optimum smelting results, proper treatment of the feed is needed to ensure favourable conditions for ignition characteristics, heat balance, mass balance with tolerable impurity levels, and overa

    Jan 1, 2012

  • SME
    Optimum Open-Pit Mine Scheduling Considering Multivariate Grade Uncertainty Using Deep Q-Learning

    By Sebastian Avalos, Julian M. Ortiz

    The long-term mine scheduling is the optimal decision on how to extract and process the mining reserves. The resulting plan is mainly driven by economic, metallurgical, and geological factors. Account

    Jun 25, 2023

  • TMS
    Optimum Operating Conditions and Characterisation of Lignin Extracted from Palm Fruit Bunch

    By M. A. Usman, E. I. Akpan, S. O. Adeosun

    Preliminary studies on the extraction and characterisation of biodegradable lignin from palm oil fruitbunch (POFB) for carbon fibre production has been conducted. Centra lComposite Design was used to

    Mar 1, 2017

  • CIM
    Optimum Planning for Multi-Project Earthmoving Operations

    By S. Abu-Samra

    By virtue of its complex nature, the construction industry comprises a wide spectrum of interrelated variables and factors. This multifaceted character of the construction industry puts the use of eng

    Aug 1, 2013