  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Pile Inspector's Guide To Hammers ? Introduction

    The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding

    Jan 1, 1995

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • DFI
    Pile-Supported Raft Foundation System

    By Emre Biringen

    Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve

  • DFI
    Pile-Supported Raft Foundation System (fd70e68a-eb6f-470f-9fd8-5fc4c0cc8d20)

    By Mohab Sabry, Emre Biringen

    "Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howev

    Jan 1, 2017

  • DFI
    Piled Rafts: Are We Modelling Them Correctly?

    By Jonathan J. Dewsbury

    It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e

    Jan 1, 2010

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
  • DFI
  • DFI
  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • AIME
    Pillar Deformation in a Bituminous Coal Mine

    By Charles Holland

    MINERS have observed for many years that as pillars are removed in mining operations the pillar adjacent to those mined out frequently shoes evidence of being compressed. Although this has been known

    Jan 1, 1937

  • SAIMM
    Pillar design and the associated mining engineering constraints in hard rock bord-and-pillar mines

    By D. F. Malan, W. J. Theron

    Practical mining aspects should be considered when conducting pillar designs for bord-and-pillar layouts. The current methodology for pillar design will result in increasing pillar sizes with depth. T

    Nov 27, 2024

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • CIM
    Pillar Design in Underground Mining

    Pillars are used in various forms in underground mining. For several decades pillar design has been an issue in both soft and hard rock underground mining. The major use of pillars is in room-and-pill

    Aug 1, 2013

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • CIM
    Pillar Drawing in the Sydney Coal Field

    By J. L. Jobe

    In planning the operation of a new mine or new sections of an operating mine, due provision must be made for the ultimate recovery of as much of the seam as is consistent with safety and economic prin

    Jan 1, 1947

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)

    By Yanske TR, Lane WL

    The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini

    Jan 1, 1998

  • CIM
    Pillar Extraction at the Sullivan Mine

    By P. T. Bloomer

    Introduction Mining of the orebody of the Sullivan mine, which is owned and operated by the Consolidated Mining & Smelting Company of Canada, Limited, has reached a point where pillar extraction is

    Jan 1, 1948