Search Documents

  • SME
    Erosive Wear In Taconite Grinding

    By I. Iwasaki

    The effects of percent solids, mill loading and grinding time on product size distribution and ball wear were studied in a laboratory ball mill for a taconite ore. Mild steel balls and HCLA steel ball

    Jan 1, 1984

  • CIM
    ERP Systems in the Brazilian Mining Industry: A Case Study

    By Paulo F. T. Sachs

    ERP systems have been widely implemented nowadays in several industries. However, ERP was originally designed to fit former MRP and MRP II users, and most of the ERP research has been focused on discr

    May 1, 2004

  • AIME
    Errata

    Jan 1, 1951

  • AIME
  • SME
    Errata (404675de-044f-46a1-a378-4f06623fc2de)

    The following errors were inadvertently included in "How millisecond delay periods may enhance or reduce blast vibration effects" by R.M. Wheeler in the September issue of Mining Engineering.

    Jan 1, 1987

  • AIME
    Errata (69a39e48-2d5a-4db2-a3f0-55e5583a6960)

    The following list of corrections has been compiled from the thirty-five volumes, with some additions: VOLUME I. Page 160. The first two sentences of the second paragraph should read as follows

    Jan 1, 1907

  • AIME
  • AIME
  • AIME
  • AIME
  • AIME
    Errata (c57724e0-c183-44e8-8978-bd8c0fc5d1de)

    [VOL. XXXVI. Page. Line. 155 29 For "Joachimstahl," read "Joachimsthal." 215 Foot-note 2. For " May, 1892," read " May, 1902." 216 21 For " ack-screw," read " jack-screw." VOL. XXXVII. 31 3 For "

    Jan 1, 1918

  • AIME
  • AIME
  • AIME
  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • AIME
    Errata in Vol xxx

    Jan 1, 1902

  • AIME
    Errata Sheet - A Decade Of Digital Computing In The Mineral Industry

    The following figures (Nos. 1-4) and tables (Nos. 1 and 2) were inadvertently omitted from the chapter entitled "Optimum Open-Pit Mine Production Scheduling" by Thys B. Johnson, Section 4, pages 539-5

    Jan 1, 1969

  • SME
    Erratic Highs -- A Perennial Problem In Resource Estimation

    Most statistical and geostatistical methods of re-source and reserve estimation work extremely well for Normal (Gaussian) well-behaved information. However, most interesting mineral deposits exhibit f

    Jan 1, 2000

  • AIME
    Erratum – Tech. Pub. 876

    The curve of Fig. 3 for pyrite requires modification. There 11% a range of pH values from 6.2 to 7.8 for which no cyanide is required to prevent contact. From 7.8 to 11.3 a small amount of cyanide is

    Jan 1, 1938

  • AIME
    Erratum.

    By EDWARD B. DURHAH

    The illustration Fig. 12, of the paper of Edward B. Durham, "Electrolytic Refining at the U. S. Mint, San Francisco, Cal.," printed in Bulletin No. 58, October, 1911, p. 830, contained an error. The c

    Nov 1, 1911