Search Documents

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • CIM
    Maximising Return On Your Improvement Efforts

    By Gareth Barnes

    Traditional approach to improvement is driven by good ideas from good people, but whilst the business case may sound good, when the project is complete, we often have not delivered on expectations.  W

    May 4, 2025

  • AUSIMM
    Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper Operations

    By G W. Croft, L E. Krause

    The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro

    Jan 1, 2005

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • AUSIMM
    Maximising the Output of a Surface Bulk Air Cooling Installation on a South African Mine

    By T Baard, A Pieters

    This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin

    Jan 1, 2005

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • IMPC
    Maximising The Value of a Wealth of Information

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data - especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Maximising the Value of æA Wealth of InformationÆ

    By A Scott

    Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data û especially with semi-automated data acquisit

    Jan 1, 2002

  • IMPC
    Maximising the Value of ‘A Wealth of Information’ (1e5cd2ab-37d3-481c-b69f-500fafd475e7)

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data – especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising Value Add from Collaborative Research

    The mining industry continues to faces significant challenges due to increasing resource constraints (quality of ore bodies, water, energy, human resources) and increasing license to operate requireme

    Sep 13, 2010

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • IIMP
    Maximización en la recuperación de pilares con sistema Wassara y su beneficio en la perforación de Tajos Primarios en Sociedad Minera El Brocal

    By Edgard Atencia, Manuel Vega

    Sociedad Minera El Brocal se dedica a la exploración, desarrollo, explotación y tratamiento de minerales polimetálicos. Con el objetivo de incrementar la producción, se buscó maximizar la recuperación

    Sep 30, 2022

  • SME
    Maximization of Productivity Of Autonomous Equipment in Underground Mines

    By J. Paraszczak

    Underground metal mining involves many challenges. Economic slowdown, tough international competition and sometimes volatile metal prices put constant pressure on mine operators to increase productivi

  • SME
    Maximization of Productivity of Autonomous Trackless Loading and Haulage Equipment in Underground Metal Mines ? A Challenging Task

    By J. Paraszczak

    Application of teleoperated and automated (or ?autonomous?) mobile equipment in underground metal mines is a promising avenue for overcoming some of the challenges facing mine operators. These include

    Feb 23, 2014

  • ABM
    Maximização Do Desaguamento Dos Resíduos Minerais Gerados Pela Concentração Do Minério De Ferro

    By Gil Ribeiro Vilela Neto

    Na busca por se tornar cada vez mais sustentável, a indústria mineral vem recorrendo às soluções tecnológicas que minimizem o impacto ambiental gerado pela disposição dos rejeitos resultantes dos proc

    Aug 16, 2017