Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mill DesignBy Norman Weiss
The design of an ore-processing plant requires a high degree of cooperation among the geological, mining and metallurgical engineers. The purposes of this section are to provide mill design informatio
Jan 1, 1973
-
Mill Design Changes To Incorporate New Flotation EquipmentBy Tom Plouf, Deepak Malhotra
INTRODUCTION The U. S. mining industry experienced a severe recession in the early 1980's. This resulted in the realization that the domestic mining industry had to compete on a global basis a
Jan 1, 1989
-
Mill Design For Labor EconomyBy Norman Weiss
THE need for more efficient utilization of labor in the metal-mining industry has been the subject of several recent editorials in the mining press, and one attractive possibility for such improvement
Jan 1, 1946
-
Mill Design for the SeventiesBy Robert S. Shoemaker
The development of a metallurgical project is a business venture rather than a technical exercise, and its real objective is to obtain the maximum return on investment consistent with the limitations
Jan 1, 1971
-
Mill Design for the Seventies (118e9ac5-f676-4aa8-b511-4ad25fe20ad5)By Allan D. Taylor, Robert S. Shoemaker
Adopting as a principle the phrase "the mill of yesterday should not be built with the high cost money of today," the authors have designed a hypothetical concentrator which could be built for a typic
Jan 1, 1973
-
Mill Design Symposium - From Ore Testing to Cost EstimationPRACTICAL PROBLEMS AND BASIC PRINCIPLES ranging from ore testing to cost estimation get a working over from top men in the minerals beneficiation field. The Minerals Beneficiation Division developed t
Jan 9, 1953
-
Mill Design Undergoing A MetamorphosisBy O. W. Walvoord
Mill design of the past will not necessarily dictate mill design of the future. There have been many advances and changes in the last few decades, many of which have been extensive and remarkable. Alm
Jan 1, 1971
-
Mill Designers Zero In On Environmental ControlBy T. O. Breitling
Two significant problems In mill design are environmental control and cost reduction. Environmental control is predicted to be 5-10% of total plant costs in some parts of the U.S. Operating and desi
Jan 1, 1970
-
Mill Drive Selection For Sag MillsBy Dan B. Kivari
One of the key operations in any milling circuit is grinding. Over the last two decades, large diameter Semi-Autogenous Grinding (SAG) mills have become the preferred primary grinding mills. The drive
Jan 1, 1991
-
Mill Drive Selection For Semiautogenous Grinding MillsBy Dan B. Kivari
A key operation of any milling circuit is grinding. Over the last two decades, large diameter semiautogenous grinding (SAG) mills have become the preferred primary grinding mills. The drive systems be
Jan 1, 1992
-
Mill Drive Selection For Variable Speed Gear Driven MillsBy Craig M. Sams
Matching mill? drives to mill power draws is a relatively new practice with the introduction of variable speed drive arrangements. Semi-autogenous grinding (SAG) mills are the focus of this paper as b
Jan 1, 1991
-
Mill Drives In The Third MillenniumBy G. A. Grandy, P. F. Thomas, C. D. Danecki
When considering the mill drive system for a grinding application, a large number of questions must be answered. Depending on the mill size and type, the mill can be driven by several configurations
Jan 1, 2001
-
Mill Evaluation at Peko Mines N.L.The flotation circuit handling Peko ore at Peko Mines N.L. was examined in July 1970 with a view to determining simple changes in circuitry or reagents which could improve the grade and recovery o
Jan 1, 1972
-
Mill Expansion at Cariboo Gold QuartzBy Russell Spry
THE cyanide plant of the Cariboo Gold Quartz Mining Company, Limited, at Wells, B.C:, in the Barkerville section of the Cariboo mining division, was erected during the latter part of 1932 and placed i
Jan 1, 1936
-
Mill Expansion at Heath SteeleBy E. Busse
"Heath Steele Mines Ltd. operates a lead-zinc-copper mining and milling complex in New Brunswick.• During the past seven years, as ore reserves increased, the mill capacity was first expanded to 1,600
Jan 1, 1972
-
Mill Expansion at Les Mines SelbaieBy K. Wood, L. Duval
"The paper discusses the approach used to add a new, separate 5000 t/d copper-zinc treatment circuit to an existing, 1650 t/d copper circuit, essentially within the existing mill building. Temporary i
Jan 1, 1987
-
Mill Expansions At P.T. Freeport IndonesiaBy R. L. Russell
Production at Freeport Indonesia's Ertsberg open pit copper/gold mine started in 1972 at a rate of 7500 t/d. Mill throughput remained at that rate for a number of years until the discovery of the
Jan 1, 1994
-
Mill Expansions at PT Freeport IndonesiaBy Robert L. Russell
Production at Freeport Indonesia's Ertsberg open pit copper-gold mine started in 1972 at a rate of 7.5 kt/d (8270 stpd). Mill throughput remained at that rate for several years until the discover
Jan 1, 1994
-
Mill Feed: By 8 m Ore Block Assay, Or By 8 cm Rock Sensing? Sorting Technology Can Fill The Gap Between Mine And Mill.By G. Van Weert
Mining project feasibility is projected from a geological model and a mining plan. Ore grade is assumed to be continuous, based on drill hole assays as much as 80 m apart. Eighty meter is 80,000,000 m
Jan 1, 2008
-
Mill Gearing For TomorrowBy David Kress
Grinding mills, both autogenous and ball can be powered by several basic means. The three methods used today are girth gear drives, gearless drives and trunnion coupled reducers. This paper will focus
Jan 1, 1991