Search Documents

Search Again

Search Again

Sort by

  • CIM
    Cardinal River Coals Ltd. - Clean Coal Preparation Plant

    By B. Caldwell

    "The CompanyCardinal River Coals is jointly owned by Luscar Ltd. and the Consolidated Coal Company of Canada (Consol). The Luscar mine is operated by Luscar Ltd. and is located 40 km south of Hinton n

    Jan 1, 2000

  • AIME
    Careful Attention Given to Custom Shippers

    By F. X. Meyer

    THE United States Smelting Refining and Mining Company maintains an ore-purchasing department for procurement of custom tonnages of milling and smelting ores and concentrates for treatment at its Midv

    Jan 1, 1948

  • CIM
    Carl Auer and the Beginning of the Rare Earths Industry

    By F. Habashi

    "The rare earths industry started in Austria in 1887 by Carl Auer von Welsbach (1858-1929) Professor of Chemistry at the University of Vienna. The process was based on monazite sand transported from B

    Jan 1, 2012

  • CIM
    Carol pellet quality - a decade in review

    By D. Pearcey, S. T. Vessey, V. Hegde, J. Staples

    "Pellet quality has taken on a new dimension during the last ten years. Quality in the seventies was generally defined as adherence to certain physical and chemical specifications. Today, the talk is

    Jan 1, 1991

  • SME
    Carontec's Coal Drying Demonstration Plant Uses Chemical Drying

    By John J. Simmons

    Federal and state regulations, in an effort to reduce acid rain, are becoming increasing more stringent regarding sulfur content of fossil fuels. Whereas coal from Illinois and Ohio contains between 1

    Jan 1, 1989

  • SME
    Carrying Coal To The 21st Century: The ICG/Hoosier Energy Contract

    By Robert J. Neubauer

    I was asked here today to discuss the first long-term freight rate contract ever signed by a U.S. railroad and shipper. That was ICG's contract with the hoosier energy company to haul coal from s

    Jan 1, 1981

  • AIME
    Cartels-Their Significance for American Business

    By AIME AIME

    FREE competition, long the controlling ideal of domestic trade within the United States, has had the fundamental geographical advantage of functioning in the world's largest area of unrestricted

    Jan 1, 1944

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • SME
    Case History of a Mixed Ground Microtunnel

    By D. Craig Camp

    conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT

    Jan 1, 2001

  • SME
    Case history on the reduction of chlorides from mine water

    By Kathleen Lagnese, Srikanth Muddasani, Kashi Banerjee, Carla Robinson

    "Mine water generated from underground coal mining operations contains both dissolved and particulate solids. Dissolved solids primarily consist of sodium, calcium, magnesium, potassium, chlorides and

    Jan 1, 2014

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • AUSIMM
    Case Studies of International Copper Development Projects

    By Pollack B

    Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th

    Jan 1, 1983

  • SME
    Case Study - Benefits Of Building An Efficient Mine Planning Process

    By Jr. Wilkinson

    Mine planners are under pressure to evaluate the impact of changing economic times and newly acquired data on the mine plan. Incorporating change, such as commodity prices, customer sales, changing c

    Jan 1, 2010

  • ISEE
    Case Study Using 3-D Blast Modeling to Develop Design for Blasting in Close Proximity to Pit Pump

    By Stuart Brashear, Steven Bell, Donald Smith

    This Limestone site required the removal of a bench containing high quality rock located in close proximity to sump and pit pump. The sump and associated electrical box were below the bench that neede

    Jan 21, 2025

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019

  • SME
    Case Study – PVC Ventilation Duct Road Map from Product Development to Ventilating Underground Mining Operation

    By A. Rai

    "This paper provides an overview of the current use of auxiliary ventilation product and the challenges with limited air quantity in dead-end entry or working face. The PVC low frictional factor, low

    Jan 1, 2015

  • SME
    Case Study – PVC Ventilation Duct Ventilating Underground Mining Operation

    By T. Weatherwax, A. Rai, J. Poor

    "This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,

    Jan 1, 2016

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017