Search Documents

  • SME
    Increased Efficiency In The Steel Industry With Weighing Technology

    ShouSteel Mining Ltd., a subsidiary of ShouSteel (Group) Co., was founded in 1959 and is located in QianAn City in Hebei Province, China. ShouSteel?s pelletizing plant uses iron ore as a raw material

    Jan 1, 2012

  • AUSIMM
    Increased Flexibility Using Waterjet Assisted Blasthole Drilling

    By P J. A Lever

    This paper presents details of CRC MiningÆs work with waterjet assisted blasthole drilling. The objective of this work was to investigate techniques that reduce the cost and increase the productivity

    Jan 1, 2004

  • AUSIMM
    Increased Gold Recovery at PT Freeport Indonesia Using Aero« 7249 Promoter

    By Gorken A, Mular M, Stewart A

    PT Freeport Indonesia operates one of the largest copper and gold concentrator complexes in the world. Flotation is used to produce a single copper-gold concentrate. In 1995, PT Freeport Indonesia a

    Jan 1, 1997

  • SAIMM
    Increased liberation and flotation performance of bulk copper flotation concentrate following its regrinding in a stirred media mill, A. Stefanov, K. Grossman, V. Stoilov, A. Angelov, U. Peuker, and S. Gaydardzhiev

    By A. Angelov, U. Peukerd, S. Gaydardzhieve, A. Stefanov, K. Grossman, V. Stoilov

    Flotation concentrate originating from the Asarel-Medet porphyry copper mining and processing complex in Bulgaria has been subjected to regrinding using a Ro-Star mill; the effects of which on the dow

    Jan 1, 2020

  • IMPC
    Increased Metal Recovery Using Targeted Process Water Treatment

    By Janne Kauppi, Kaj Jansson, Piia Suvio, Saara Hagnäs

    "Historically the focus at the mineral processing sites has been to improve the production operations, while little focus has been set on how factors, such as the quality of water used in the process

    Jan 1, 2018

  • SME
    Increased Ore Grindability And Plant Through-Put With Controlled Blasting

    By G. Chi, M. C. Fuerstenau, R. C. Bradt, A. Ghosh

    With increased emphasis on controlled blasting, which is the first and least-costly stage of comminution, ore grindability and plant throughput can be increased by 5% to 10%, and energy savings of up

    Jan 1, 1998

  • SME
    Increased Ore Grindability And Plant Throughput With Controlled Blasting

    By M. C. Fuerstenau

    With increased emphasis on controlled blasting, which is the first and least-costly stage of comminution, ore grindability and plant throughput can be increased by 5% to 10%, and energy savings of up

    Jan 1, 1997

  • AUSIMM
    Increased Performance Through Flash Flotation and Cyclone Optimization

    By Rais SA

    In June, 1986, Freeport Indonesia, Inc., in conjunction with Out- okumpu USA, laboratory tested the Flash flotation concept on Primary ball mill underflow. These laboratory results indicated a possib

    Jan 1, 1988

  • SME
    Increased Prodcution Planned at Anshan Iron and Steel

    The Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon

    Jan 3, 1980

  • SME
    Increased Production And Cost Savings Using Delvo Stabilizer In The Cemented Rockfill Program At Williams Mine (Marathon)

    By Scott Jones, Tony R. A. Durkac, David W. Stephens

    Williams Mine was considering spending a large amount of capital to install a pumping system underground to rid the mine of slimes; with the introduction of Delvo Stabilizer this challenge would be me

    Jan 1, 2001

  • CIM
    Increased Production Through Improved Spare Parts Availability

    By Robert Lamarre

    In today?s environment, the availability of production equipment is a must to increase throughput and profits. For a number of mining organizations around the world, spare parts availability is key to

    Aug 1, 2013

  • AUSIMM
    Increased Productivity At The C. S. A. Mine, Cobar

    Due to collapsing copper prices during 1974/75, a rapid changeover was made at the C.S.A. mine from mechanised cut and fill stoping with incline access to the more economic long hole open stoping

    Jan 1, 1977

  • CIM
    Increased Productivity by Condition-Based Maintenance Using Wireless Strain Measurement System

    By Chris V. Sellathamby

    Condition-based maintenance is replacing preventive maintenance in many industrial operations as a result of gains in productivity. Preventive maintenance is strictly time-based which means that as lo

    Oct 1, 2010

  • TMS
    Increased Productivity from Kidd Creek Copper Operations

    By C. J. Newman

    Production levels at the Kidd Creek copper operation increased during the 1980's by expansion of both the smelter and refinery and by major modifications to equipment which was causing bottleneck

    Jan 1, 1993

  • SAIMM
    Increased Productivity Of Zinc Roasters And SO2 -Quality

    By Pekka Taskinen

    Advanced optimizing control of the fluidised bed zinc roaster has been in use for an extended period at Boliden Kokkola and the implications are seen as extended bed stability, increased throughput an

    Jan 1, 2008

  • ISEE
    Increased Productivity through Frost Blasting

    By Terry Graf, Bill Thompson, John Guenther

    SYNCRUDE CANADA LTD.. operates the largest synthetic crude oil production facility in the world. Over 60,000,000 Bank Cubic Metres of oil sand is mined each year from their open pit located in Fort Mc

    Jan 1, 1993

  • SME
    Increased Productivity Through Modern Material Handling

    By Edward C. Mabbs

    U.S. industry must increase its productivity or lose its competitive position in the rapidly expanding and inter-dependent world markets. Recent improvements in material handling techniques and equipm

    Jan 1, 1973

  • AUSIMM
    Increased Productivity through Short-Term Scheduling and Management Operating Systems at the Hilton Mine

    By A Clark

    When production targets are not being reached it is essential to determine what the operating problems are so that remedial action can be taken. It is also imperative that all persons who are part of

    Jan 1, 1998

  • SME
    Increased Productivity Through Use Of High Density Ammonium Nitrate Blasting Agent

    By J. C. Adams

    Although explosives constitute only a small portion of a mine's total cost, the relative success of each blast has a tremendous effect on subsequent activities such as excavation, crushing, and e

    Jan 1, 1996

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021