Search Documents

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • SME
    Managing Plant Productivity With A Web Server Technology

    By S. Culp, P. Metcalfe

    Web technologies and the Internet have revolutionized the computer industry. The Web browser technologies have also moved to portable devices such as Personal Digital Assistants (PDAs) and mobile phon

    Jan 1, 2002

  • AUSIMM
    Managing Process Water Quality in Base Metal Sulfide Flotation

    By R Dunne, S Hart, G Levay

    While water represents a major proportion of the mineral pulp processed in flotation circuits, relatively little research effort has been committed to understanding and controlling the influence of wa

    Jan 1, 2003

  • ISEE
    Managing Production Blasting Vibrations: A Machine Learning Based Prediction of PPV in Chilean Copper Mines

    By J. Rafael Otaíza, Francisco Mardones

    This work has addressed the problem of creating a predictive model of the maximum particle velocities in the rock mass (PPV). The model designed specifically can model the subsequent vibrations of bla

    Jan 21, 2025

  • CIM
    Managing Project Development Challenges for Improved Business Outcomes

    By J. R. Donald

    "Project development has been increasingly formalized in the past decade, with most organizations having extensive and descriptive deliverables documents and processes to govern the stage gate progres

    Jan 1, 2015

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Managing Risk at Rapu Rapu, the Philippines

    Lafayette Mining Limited, a listed Australian company, is developing a polymetallic Project on the island of Rapu Rapu, located to the east of southern Luzon in the Philippines. The Rapu Rapu Project

    Jan 1, 2003

  • AUSIMM
    Managing Risk in Mining and Other Resources Projects ù Different Stakeholder Perspectives and Management Options

    Managing project exposure and risk has numerous viewpoints, including those of engineers, owners, bankers and insurers. Fewer stakeholders are involved in early stages, though with wider risk manageme

    Jan 1, 2003

  • SME
    Managing Risk In The Minerals Industry: The BHP Copper Experience "Sandwiches, Society, And The Sands Of Time"

    By D. J. Wood

    BHP Copper has grown, in just over six years, from a minor participant to the world's largest privately owned copper producer. BHP Copper's major asset is the world's largest copper m

    Jan 1, 1998

  • ISEE
    Managing Risk – Evaluating Existing and New Tools Used in Industry

    By Kristen R. Bingham

    "Today, more than ever, drilling and blasting contractors are challenged to manage the ever-changing risks associated with blasting operations. New neighborhoods are encroaching upon mine sites and bl

    Jan 1, 2017

  • AUSIMM
    Managing Risks in New South Wales Coal Mining

    In the past five years, there has been an evolution in the assessment and control of mining risks in the New South Wales coal mining industry. This change has involved the development and use of str

    Jan 1, 1994

  • AUSIMM
    Managing Safety at Mount Isa Mines Limited

    The published safety policy of Mount Isa Mines Limited, together with details of the organisation and control techniques adopted by management to pursue an active safety programme within the compan

    Jan 1, 1975

  • SME
    Managing Safety In The Mining Industry

    By F. Nelson

    RJB Mining is the largest coal producer in the UK. In January 1995 the Company acquired the Central North and Central South Regions of British Coal consisting of: ? 15 operating collieries -includin

    Jan 1, 1998

  • AUSIMM
    Managing Safety: Management's Role in Preventing Accidents

    An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out

    Jan 1, 1975

  • AUSIMM
    Managing Seismic Hazards in a Narrow Vein Underground Operation

    The Kundana underground narrow vein gold mine had a recent history of large and damaging seismic events. Following a period of seismic events on 30 July 2001, in which nine miners were temporarily ent

    Jan 1, 2005

  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • AUSIMM
    Managing steep seam dips and floor shears related dragline bench and lowwall instabilities

    By J Li, J Regan, D Payne

    The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge

    Nov 29, 2022

  • AUSIMM
    Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground Mine

    The Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util

    Nov 25, 2010

  • AUSIMM
    Managing Stress and Seismicity in an Inclined Sublevel Cave

    By K A. Bunker, A D. Campbell, E Ah Mu, A R. Penney

    The Ernest Henry mine is a transverse sublevel cave (SLC), which is relatively unique due to the 45 degree inclination of the orebody. To economically recover ore, each sublevel is horizontally offset

    May 9, 2016

  • SME
    Managing Subsidence Impact on Active Cave to a New Production Footprint Through Draw Control Strategies - SME Annual Meeting 2025

    By Rusdian F. Kayadoe, Michael B. Hutahaean, Sandi A. Firmanulhaq

    Deep Mill Level Zone (DMLZ) mine is located in Papua, Indonesia operated by PT Freeport Indonesia (PTFI) with approximately 1,500m below surface. The ore body extend 1230m width from northwest to sout

    Feb 1, 2025