Search Documents

Sort by

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • ISEE
    Constructing Laboratory Caverns in Hard Rock Under High Stress

    By Christopher Laughton

    A new underground laboratory is under construction at the recently closed Homestake Gold Mine, Lead South Dakota, United States of America. The Deep Underground Science and Engineering Laboratory is d

    Jan 1, 2011

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • CIM
    Construction and Utilization of a Field Data Sheet for Consideration of Rock Engineering Problems in Underground Hard Rock Mining.

    By Radford B. Langston

    Mining Methods Majority of Production Ramp and Fill at Stillwater, Sub-level Becoming More Important Production at East Boulder from Sub-level l Majority JM REEF ROCK TYPES NORITE - plagioclase

    May 1, 2002

  • SME
    Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

    By Ron Drake

    The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An

    Dec 1, 2022

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • AUSIMM
    Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand

    By N Wharmby

    In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh

    Mar 8, 2011

  • SME
    Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021

    By Mirko Martini, Marcelo Benaglia, Andrea Codalli

    Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its

    Jun 13, 2021

  • SME
    Construction of an Underground Niche for TBM Repair and Permeation Grouting in Flooded Shaft—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Brad Yoder, Fabrizio Fara

    The Ship Canal Water Quality Project includes a 2.7-mile, 18-ft and 10-in internal-diameter tunnel that extends from Ballard to Wallingford, two popular neighborhoods in the West of Seattle. During th

    Jun 23, 2024

  • SME
    Construction of an Underpass Crossing in Proximity of a Railway Track

    By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi

    "1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is

    Jan 1, 2016

  • ISEE
    Construction of Free Faces in a Single Event

    By Iván E, Alex Araya Jofre, Jean Guiroux Toro, Eduardo Valdés Guerra

    Currently, it is important for companies to have controlled mining operations and adhere to production schedules. To achieve this, one of the key factors is maintaining high reliability in the P&T pro

    Jan 26, 2026

  • DFI
    Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2008

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • DFI
    Construction Of Large Drilled Shafts The 2nd Annual Mike O?Neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    Jan 1, 2013

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983