Search Documents

Sort by

  • NIOSH
    Continuous Gas Monitoring Using Tube Bundles At The Joanne Mine Fire

    By L. E. Dalverny

    This Bureau of Mines report describes the deployment, 5-month operation, and lessons gained from a continuous gas monitoring system using sampling-tube bundles at an underground mine fire in West Virg

    Jan 1, 1975

  • SME
    Continuous Haulage Systems For Computer-Assisted Continuous Miner PREPRINT NUMBER 90-152

    By S. K. Bhatt

    This paper reviews major developments in continuous haulage technology for underground coal mines. Haulage systems, both in use and development, are investigated through a comprehensive literature sea

    Jan 1, 1990

  • SME
    Continuous High Gradient Magnetic Separation Pilot Plant: Machine Description And Mineral Processing Results

    By Bo Arvidson

    SALA MAGNETICS, INC. is now operating a 15 tph continuous high gradient magnetic separator, the SALA-HGMS® Mark III Carousel, as part of a complete mineral processing pilot plant installed at Sala&apo

    Jan 1, 1976

  • TMS
    Continuous Improvement in Peirce Smith Converter Design – Kumera’s Approach

    By Markku Rytkonen, Shaolong Chen, Ilpo Kylmäkorpi, Hannu Mansikkaviita

    Though the Peirce Smith (P-S) converter is a traditional type of furnace, continuous improvement in its mechanical and electrical design is still Kumera's approach. Efforts are made particularly on th

    Jan 1, 2009

  • CIM
    Continuous loading at Brunswick Mining

    By J. Jerome MacDonald, Stephen B. Flewelling

    "In the base metals industry of today, operations required to continuously improve productivity and reduce unit production costs. Consistent with these goals is the improvement of the muck haulage cyc

    Jan 1, 1989

  • CIM
    Continuous minicell test of collectorless flotation at Mattabi Mines Ltd.

    By M. Leroux, S. R. Rao, J. Kim, J. A. Finch

    "Continuous in-plant testing of collectorless Cu/Pb bulk flotation on Lyon Lake ore at Matlabi Mines Ltd. Was conducted using a portable circuit based on 5 L mini flotation cells. It is concluded that

    Jan 1, 1994

  • AIME
    Continuous Monitoring and Control of Froth Level and Pulp Density

    By F. Rosenblum, P. Spira, F. Kitzinger

    The possibility of increasing the efficiency of mineral processing plants by means of computer control has prompted metallurgists to examine their flowsheets more critically in order to develop practi

    Jan 4, 1979

  • SME
    Continuous Monitoring And Control Of Froth Level And Pulp Density

    By F. Kitzinger

    The possibility of increasing the efficiency of mineral processing plants by means of computer control has prompted metallurgists to examine their flowsheets more critically in order to develop practi

    Jan 1, 1977

  • AIME
    Continuous Monitoring and Control of Froth Level and Pulp Density - APRIL 1979

    By F. Rosenblum, P. Spira, F. Kitzinger

    The possibility of increasing the efficiency of mineral processing plants by means of computer control has prompted metallurgists to examine their flowsheets more critically in order to develop practi

    Jan 1, 1980

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • SME
    Continuous On-Line Analysis Of Coal ? Introduction

    By O. J. Tassicker

    The Electric Power Research Institute (EPRI) initiated a program in 1976 to develop and demonstrate an instrument system for on-line continuous measurement of coal properties. The program has focused

    Jan 1, 1983

  • SME
    Continuous On-Stream Mineral Analyser (COSMA)

    By M. C. Mound

    A recent development using XRD techniques, a unique fixed detector, specifically permitting full mineralogical information simultaneously for the first time, specially designed sample preparation and

    Jan 1, 2010

  • CIM
    Continuous On-Stream X-Ray Analysis

    This paper comprises a description of on-stream analysis instrumentation, including sample handling, X-ray optics and data processing. It also includes a discussion of some typical applications of an

    Jan 1, 1965

  • CIM
    Continuous Online Temperature Measurement System

    By Bob Drew, Goran Vukovic, Bojan Zivanovic, Klaus Gamweger

    Reaction bath temperature is a major factor in processing liquid metals and in many applications where a balance between process duration and temperature has to be found to run a procedure efficiently

    Jan 1, 2015

  • SME
    Continuous Surface Mining Equipment: How To Achieve Success (20dd6831-c58d-4391-827b-af2512db5aea)

    By E. DeLilia

    For the past 30 years, surface mines have moved toward more highly mechanized, automatic systems that continuously mine overburden and ore to in-crease productivity, lower operating costs and minimize

    Jan 1, 1995

  • AIME
    Contour Cutting Mechanisms As A Means Of Improving Underground Stability

    By James G. Blaine, David A. Summers, L. John Tyler

    There has been a considerable amount of research developed which shows that the close contour cutting of an excavation prior to removal of the central core will increase ground stability while concomm

    Jan 1, 1984

  • SME
    Contractors' Experience With The Hydroshield Tunneling System

    By Erich J. Jacob, Volker O. Meldner

    INTRODUCTION Our company has made persistent efforts to utilize the very latest cost-saving technology in tunnel design and construction. However, we were relatively late in joining the clan of slu

    Jan 1, 1979

  • DFI
    Contractual Pitfalls To Avoid With ACIP Piles

    By William Babcock

    Augered, Cast-In-Place (ACIP) piles can be an economical, reliable, versatile foundation system. They have also been a part of projects that were behind schedule and the subject of lawsuits. The ACIP

    Jan 1, 1997

  • ABM
    Contribuição Da Engenharia De Confiabilidade Na Redução Da Taxa De Falha Da Máquina De Lingotamento Da Arcelormittal Tubarão

    By Severino Albani Junior

    A Gestão de Ativos vem ganhando espaço no contexto industrial ano após ano principalmente após 2014, quando ocorreu o lançamento da ABNT NBR ISO 55000. Dentro desse contexto, o tema Manutenção e princ

    Oct 30, 2017