Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estimation Of Weight Ratios Given Component Make-Up Analyses Of Streams ? IntroductionBy Richard Klimpel
A common problem in mineral processing and chemical engineering is the need to estimate flow rates and/or weight ratios involved with engineering operations for which it is inherently difficult to dir
Jan 1, 1979
-
Estimation Particle Velocity on the Basis of Blast Event MeasurementsBy Gungor Tuncer, Ali Kahriman, A. Kadir Karadogan, Savas Gorgun
The environmental problems arisen from ground vibration and air blast have been faced and discussed frequently in various industries such as mining, construction, quarry, pipe line etc. where blasting
Jan 1, 2000
-
Estratégia De Gestão De Ativos Físicos: Um Estudo De Caso Na Samarco MineraçãoBy Fabrício Dardengo Hupp
O ponto de partida de um sistema de gestão em conformidade com a ISO 55000 é a elaboração de uma estratégia de gestão de ativos consistente com o plano estratégico da organização. A principal dificuld
Aug 16, 2017
-
Estruturação Da Manutenção Do Concentrador 3 Da Nova Planta De Beneficiamento De Minério De Ferro Da Samarco Mineração Sa, Projeto 4ª Pelotização - P4pBy Eduardo Gomes Vieira
O Projeto 4ª Pelotização surgiu com o propósito de aumentar a capacidade de produção de pelotas da Samarco em 37%, por meio da implantação do 3º Mineroduto, com capacidade de 20 Mt/ano, a 4ª Usina de
Aug 16, 2017
-
Estudo Para Redução De Permanência De Veículos Apoiado Pela Simulação Em ComputadorBy Gustavo Nucci Franco
A indústria do aço passa por seu pior período no Brasil e as empresas vêm buscando soluções para minimizar custos e garantir as operações com menos recursos. Ponto importante nessa busca de ganhos pot
Aug 17, 2017
-
Estudo Preliminar De Viabilidade Econômica De Um Projeto De Mineração De Agregados Através De Análise ProbabilísticaBy Raíza da Silva Juvenal, Suelen Silva Rocha, Artur Ângelo Alcântara de Assis, Jorge Luiz Valença Mariz
Um estudo de viabilidade econômica deve considerar parâmetros e incertezas inerentes a um projeto para produzir resultados econômicos consistentes, fornecendo ao investidor uma ferramenta de tomada de
Oct 3, 2019
-
Ettringite Precipitation for Sulfate and TDS Reduction: A 10 GPM Pilot Plant StudyBy R. Bryce, T. J. Doughty, K. Stoll
Sulfate-impacted mine waters are under regulatory scrutiny to reduce total dissolved solids (TDS). There are several options to reduce TDS. One option is transforming the soluble sulfate into insolubl
Jan 1, 2019
-
EU Type Certification of Non-Standard Electronic Initiations Systems used in Blasting at Mines and QuarriesBy Matthew Clay, Colin Chambers, Susan Hookham
Opencast (quarries) and underground mines around the world use blasting methods to mine valuable ore. Traditional blasting systems use technologies such as electric delay detonator systems (developed
Jan 1, 2017
-
Europoort Iron Ore TerminalWhen the Middle Ages were drawing to an end and Rotterdam, then still a small fishing port, began to extend its trade relations to continental ports handling general cargo, a development was initiated
Jan 1, 1972
-
Evaluación de la gravedad específica basada en métodos geoestadísticos multivariablesBy Fredy Mamani
El objetivo principal de este trabajo es aplicar técnicas de estimación geoestadística multivariables, aprovechando la correlación y relaciones entre variables. Luego realizar un comparativo de las va
Sep 29, 2023
-
Evaluating and Controlling Geological RiskThe paper first outlines the conceptual basis for evaluating and controlling geological risk. Geological risk, the economic reflection of the uncertainties associated with tonnage, grade, and other
Jan 1, 1994
-
Evaluating destress blasting for rock fracture and rockburst prediction in deep level hardrock miningBy C. Yi, M. Onifade, B. Genc, S. Dineva, T. Zvarivadza, M. Khandelwal
Deep level hardrock mining faces increasing challenges from elevated in situ stresses and associated rockbursts. This study aims to develop a systematic framework for evaluating destress blasting effe
Jun 27, 2025
-
Evaluating Efficiency of Geo5 in the Analysis of Pile FoundationBy Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal
"Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail
Jan 1, 2017
-
Evaluating Groundwater Impacts From Dewatering Operations to Support a Coal ProjectBy N J. Arunakumaren
A coal mine is proposed for an area where a major river traverses the project area. There were initial concerns that inflow of groundwater from exposures of high permeability alluvium associated with
Jan 1, 2003
-
Evaluating Performance of Real-Time DPM Monitors for Quantifying Airborne Elemental Carbon (EC) and Organic Carbon (OC)By K. V. Raj, M. McNinch, A. L. Miller, J. Wilson, D. A. Parks
Diesel particulate matter (DPM) has been shown to contribute to various adverse health effects on underground miners. In order to reduce worker exposures, it is critical to measure the levels of DPM i
Jan 1, 2019
-
Evaluating power source alternatives for mobile equipment operating in deep mines - SME Transactions 2009By J. Paraszczak
Metal mining at great depths presents a number of serious challenges for mine operators. Among them is the high demand for fresh air required to cool down mine openings, evacuate noxious gases and con
Jan 1, 2009
-
Evaluating rheological features inside tumbling mills using DEM data previously validated against PEPT measurementsBy I Govender, T L. Moodley
Tumbling mills are grossly inefficient, using only 5 per cent of the total energy supplied for actual breakage. A significant proportion of this inefficiency is unavoidable owing to geometric limitati
Aug 24, 2022
-
Evaluating the Coal Bump Potential for Gateroad Design in Multiple-Seam Longwall Mining: A Case StudyBy J. Bal, V. D. Dao, W. Li
"SynopsisThis study proposes a methodology for evaluating the risk of coal bumps in multiple-seam longwall mining. Both the stress field and the total energy release (TER) during retreat were evaluate
Jan 1, 2015
-
Evaluating The Economics Of Development Alternatives Early In The Project Feasibility ProcessBy Scott Stebbins
Cost estimating and economic evaluation software provide evaluators with the ability to predict the profit potentials associated with mine design alternatives even during project exploration and prefe
Jan 1, 2002
-
Evaluating the potential drilling success of exploration programmes using a three-dimensional geological model – A case studyBy R. K. W. Merkle, F. A. S. Reyneke, Z. Harris, P. W. J. Delport
The technological advancements in computing power in the last 30 years have enabled the practical visualization of complex geological environments in three-dimensional (3D) space. 3D models and their
Feb 2, 2022