Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"By Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Oct 1, 2024
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground - SME Annual Meeting 2024By D. Scott Scovira, Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Feb 1, 2024
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground Phase 2 – Blasting Campaign in Western USABy Karl Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 21, 2025
-
Hoist-Rope Stress Analysis and Preventative Maintenance for Multi-Rope Friction HoistsBy Humphrey Dean
"Canadian mining companies now operate numerous Koepe-type friction hoists in a variety of different shafts, most of which have a depth in excess of 3,000 feet. Rope performance reliability is an abso
Jan 1, 1970
-
Hoisting Rope Research in Ontario MinesBy R. E. Dye
Introduction Research concerning all phases of hoisting practice, but more particularly the causes and prevention of hoisting rope deterioration and the improvement of safety dogs 158 for shaft con
Jan 1, 1948
-
Hoists and Hoisting SystemsBy James H. Harmon
As the trend to deeper mines, producing from marginal ore bodies, continues, mine hoists and their associated equipment will become more sophisticated, complex, large and expensive. Over the past two
Jan 1, 1973
-
Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving MineBy M Wimmer
LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin
May 9, 2016
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Hollow Microspheres - Reliable Sensitizers for Water Gel and Emulsion ExplosivesSynthetic hollow microspheres have demonstrated reliable sensitization and detonation characteristics in industrial explosives for almost two decades. During that time, water gel formulations and us
Jan 1, 1990
-
Homestake Mining Company's Carrier-Current Shaft Signaling SystemBy John F. Wiggert
DURING the early years of Homestake operations, shaft signaling from the cage tenders to the hoisting engineers was done by mechanical means. Small steel cables or jointed steel rods were suspended in
Jan 1, 1941
-
Homogeneity assessment of crushed and pulverised iron ore certified reference materials – implications for laboratory quality controlBy J Carter, B J. Armstrong
Best practice for the submission of samples to an internal or commercial laboratory requires quality control materials to be included for the purpose of independently and comprehensively assessing lab
Sep 18, 2023
-
Horizon control technology for selective mining in underground coal minesBy I. R. Muirhead, A. L. Craven
The trend in mining thermal coal is only to mine coal with the lowest sulphur content. In many coal seams, bands of coal with high sulphur content are often present, generally occurring either at the
Jan 1, 2000
-
Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to
Dec 1, 2022
-
HORIZONTAL - A Matrix-Independent Generic Sampling StandardWe outline a first version of an ambitious goal: The world's first horizontal (matrix-independent) generic sampling standard. The specific needs and requirements are overwhelming, as all the worl
Mar 1, 2010
-
Horizontal Control of Shearers – A Three-Dimensional ProblemBy Geoff C. Knight
Longwall mining using the shearer is acknowledged internationally as the most economically successful method of high volume production from underground coal mines. Since its introduction in the 1950s,
Jan 1, 1991
-
Horizontal Curve Engineering Above and Below GroundBy Dr. -Ing. Rainer Alles
Introduction Belt conveyors usually run in a straight line. The correct alignment is a major criterion for reliable functioning and optimum running properties. Any misalignment of the conveyor, espe
Jan 1, 1993
-
Horizontal Site Investigation SystemsBy Steven I. Majtenyi
INTRODUCTION The heavy risk inherent in all underground construction projects contributes significantly to the high cost of transportation tunnels. First, the knowledge of this risk leads the engin
Jan 1, 1976
-
Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and PerspectiveBy G. J. Hasenfus
Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?
Jan 1, 2006
-
Hot Blast Air Distribution Main Design Modifications For Improved PerformanceBy Kyle T. Chomyn
Multi-disciplinary engineering analysis and advanced modeling techniques were used to identify and develop low cost design modifications to improve a blast furnace hot blast air distribution main that
Aug 17, 2017
-
Hot Blast System Development: Technology, Operations, Campaign ManagementBy Bart de Graaff, Victor van Straaten, Edo Engel
The hot blast system is key ancillary plant equipment with respect to safe and stable operations during a long blast furnace campaign. Hot blast stove designs have been optimized to such an extent tha
Oct 1, 2019