Search Documents

Sort by

  • DFI
    2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction

    By Yahia M. Al-Smadi

    Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t

    Jan 1, 2010

  • SME
    3. Planning of Underground Materials-Handling Systems ? Introduction

    By L. H. E. Weyher

    A mine is essentially a vast materials-handling system. All other systems found in the mine exist to one degree or another to support the materials-handling functions, from the cutting at the face to

    Jan 1, 1979

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • SME
    30 Years of Advances in Risk Management for Underground Projects - RETC2023

    By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly

    Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS

    Jun 13, 2023

  • SME
    30 Years Of On-Stream Analysis At The Pyhasal Mine

    By S. Uihteenmaki

    Pyhasalmi is a massive sulfide orebody located in central Finland. The mine has been in operation since 1962. The flotation concentrator produces Cu, Zn, Pb and pyrite concentrates. The plant has used

    Jan 1, 1999

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AIME
    30. Geology and Ore Deposits of the Gilman (Red Cliff, Battle Mountain ) District, Eagle County, Colorado

    By R. E. Radabaugh, J. M. Brown, J. S. Merchant

    The Gilman district is on the northeast flank of the Sawatch Range in central Colorado. It has yielded a total of 10,000,000 tons of ore having a value of over $250,000,000. Paleozoic sediments intrud

    Jan 1, 1968

  • AIME
    33. Ore Deposits in the Central San Juan Mountains, Colorado

    By Thomas A. Steven

    Most mineralized areas in the central San Juan Mountains, Colorado, are associated with the youngest subsidence structures in a large volcanic cauldron complex that formed concurrently with eruption o

    Jan 1, 1968

  • SME
    360-Degree 3D Digital Assessment of Subsurface Water Infrastructure - NAT2022

    By Cory Dippold, Michael Mett, Jérôme Steinkühler, Kristi Latimer

    For decades, tunnels of all types have been a significant part of our infrastructure. In particular, water tunnels carry millions of gallons of fresh water every day to major metropolitan areas and su

    Dec 1, 2022

  • AUSIMM
    3D estimation of variables with complexity in cross-correlation structures

    By N Madani

    Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model

    Nov 21, 2018

  • AUSIMM
    3D limit equilibrium and finite element model development for coalmine slopes

    By G Guy, J Summerville

    Over the past five years in coalmine slope evaluation the application of 3D modelling has increased significantly as software has become more user friendly but also areas requiring evaluation have bec

    Nov 29, 2022

  • TMS
    3D Metallography of Multiphase Steels

    By Andreas Stieben, Pierre Lutomski, Wolfgang Bleck, Martin Fischer

    "For steel investigation and development, exact knowledge about the microstructural state is required. The information gained from 2D images often can't properly reflect the real 3D microstructural pr

    Jan 1, 2012

  • IMPC
    3D Mineralogy, Texture And Damage Analysis Of Multiphase Mineral Particles With A High Contrast, Submicron Resolution X-Ray Tomography System

    By S. H. Lau

    Rapid 3D characterization of multiphase mineral particles in a variety of mineral processing applications is described, including: mineral liberation analysis, grain size, mineral exposure analysis, p

    Sep 1, 2012

  • CIM
    3D Seismic Exploration Techniques in the Mining District of China

    By Su-Ping Peng

    Three dimensional (3D) seismic exploration has been carried out since the 1980s in the mining district of China, where it has been playing an indispensable role in the high yield and efficiency of coa

    Aug 1, 2013

  • CIM
    3D Time-of-Flight Camera for Surveying Remote Cavities Mined with a Jet Boring System

    By C. A. Ingram

    The Cigar Lake ore body is a high-grade uranium deposit situated within water-saturated sandstone. In order to extract the uranium ore remotely, ensuring minimal radiation dose to workers, and also to

    Aug 1, 2013

  • ABM
    3d Topscan: The New Three-dimensional Radar Profilemeter For Blast Furnaces

    By Jean François Stumper

    This paper presents the TMT “3D TopScan” profilemeter, which is a Radar-based profilemeter that measures the total burden surface within a few seconds and on a continuous basis. This equipment is base

    Aug 16, 2017

  • DFI
    4 Equipment Installation: Recent Developments - Equipment Installation - Recent Developments: General Report On 'Deep Foundation Installation Monitoring' - 1. Introduction

    By B. De Paoli

    At Pietrafitta, between Assisi and Perugia, ENEL (Italian National Electricity Authority) has for some time been managing a power-station operated with lignite, mined from an open mine on the way to e

    Jan 1, 1994

  • SME
    4. Case Study - Ore-Body Modeling at Sacaton Mine, Arizona - Introduction And Definition Of The Problem

    By Marvin Barnes

    The Sacaton mine is a relatively new open¬pit copper mine owned by Asarco, Inc., which has been in production only a few years. The mineral deposits consist of two ore zones; a western, near-surface z

    Jan 1, 1979

  • SME
    4. Grade and Tonnage Problems ? Introduction

    During the past decade, since the appearance of Popoff's (1966) review of grade tonnage calculations, it has become evident that defining a new method which could be followed step by step by a te

    Jan 1, 1979

  • SME
    4.5 Mine Monitoring and Control - 1. Technical Overview - Introduction

    By R. V. Ramani

    Control is a vital management function by which operations are brought into compliance with predetermined standards to achieve the goals of an enterprise. Events that are characterized by a low degre

    Jan 1, 1979