Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Laboratory-Scale Assessment of Hot Spot Development in Bulk Coal Self-HeatingA new two-metre column self-heating test procedure has been developed at the University of Queensland, which clearly shows the hot spot development phases that take place in bulk coal self-heating. Th
Jan 1, 2005
-
Ladle Management SystemBy Jörg Thomasberger
Delivering liquid steel to a steel processing unit at right temperature is an important criterion for high production steel shops, but it is surprising how little attention has been paid in the past t
Aug 17, 2017
-
Lady Loretta - A New Approach to an Old OpportunityBy C R. Fountain, W R. Cannings
The zinc-lead-silver mineral resource at Lady Loretta ranks amongst the worldÆs richest when measured in terms of in situ metal grades. However, the project remains undeveloped 28 years after its disc
Jan 1, 1998
-
Lake Mathews Outlet Facilities’ Shaft Construction, Metropolitian Water District of Southern CaliforniaBy Stuart M. Lipofsky, Norm Hutchins
The Metropolitan Water District of Southern California has undertaken the Lake Mathews Outlet Facilities project to replace the existing outlet facilities. In the late1990s, consulting engineers for t
Jan 1, 2003
-
Lake Superior Paper - Discussion of Dr. Don's paper on the Genesis of Certain Auriferous Lodes (see p. 564)Joseph LeConte, Berkeley, Gal.: I have read with some care and with extreme interest the work of Dr. Don, and have 110 hesitancy in expressing my high estimate of its value. We have here an example of
Jan 1, 1898
-
Lake Superior Paper - Discussion of Prof. Kidwell's paper on the Efficiency of Built-Up Wooden Beams (see p. 732)Prof. Henry S. Jacoby, Cornell University,Ithaca, N.Y. (communication to the Secretary): When a simple beam supports any given load, the lower fibers me in tension while the upper fibers are in compre
Jan 1, 1898
-
-
Lake Superior Paper - The Investigation of Alaska's Mineral WealthBy Alfred H. Brooks
The developments of the past five years have shown that Alaska, as a field for mining, stands in the first rank among the possessions of the United States. Its annual gold output is now about $8,000,0
Jan 1, 1905
-
Large adjustable-speed AC drives for the mining industryBy G. Hausen, H. Micka
"Modern signal and power electronics made adjustable-speed AC drives technically feasible and reliable and economically attractive. Cycloconverters are discussed as a proven technology for mine hoists
Jan 1, 1988
-
Large Diameter Core SamplingBy P J. Jacobs
FORACO is the third-largest global drilling services company, and recently celebrated its 50th anniversary. The company’s historical roots are in French-speaking West Africa, delivering hydrogeologica
Jul 29, 2014
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Large Event Sequence Analysis and 3D Velocity Models for Seismic Event Location AccuracyBy D S. Collins, Z Hosseini, I Pinnock, Y Toya
Microseismic monitoring is regularly used in the mining and geotechnical industries to provide detailed information about rock mass response to operational activities. This paper implements a variable
May 9, 2016
-
Large Gears - On The Cutting Edge Of Excellence (fd2c9e50-e7a9-450c-a263-73e0eab36462)By J. Carr
Ring gear and pinions used as the final drive on large metallurgical grinding mills are expected to transmit their rated horsepower reliably for long periods of time. Duty is 24 hrs./ day. Life expect
Jan 1, 1985
-
Large Ring Gears ? A Topic of ConcernBy Robert M. Vadas
Special considerations are described as they apply to the design of ring gears for high-power grinding mills. AGMA requirements, the importance of the supporting structure, material selection and rela
Jan 1, 1978
-
Large Scale Computer Automation Of Process PlantsBy D. N. Madge
A description will be given of an approach to plant process automation based on the strategy of first developing an information system followed by later development of process models. The advantage
Jan 1, 1972
-
Large Single Line Grinding Circuits at the Highest AvailabilityBy C. Horstmann, D. Andreo, G. Barthold
"The concept of large single line grinding circuits provides a valid answer in project feasibility studies by reducing capital investment requirements compared to parallel lines for the same plant thr
Jan 1, 2016
-
Large Vibrating Screen Design - Manufacturing And Maintenance ConsiderationsBy Robert A. Irvine
Traditionally, cost effective gains in the capacity of material handling systems were a result of increases in equipment size. In general, the use of maximum capacity components in a system optimizes
Jan 1, 1983
-
Large Vibrating Screen Design -Manufacturing and Maintenance Considerations (503b9ba9-f252-4b9c-8724-e821545feaff)By R. A. Irvine
The use of large vibrating screens presents unique challenges to the screen manufacturer, the plant designer, and the plant operator. The design of vibrating structures that span greater unsupported d
Jan 1, 1985
-
Large-scale treatment of a concentrated cyanide waste solution by acidificationBy P. A. Riveros, R. Molnar, F. J. Baša
"An acidification circuit was installed and operated at the Agnico-Eagle Silver Division refinery in Cobalt, Ontario, for treating ~300 m3 of a concentrated cyanide waste solution with the purpose of
Jan 1, 1998