Search Documents

Sort by

  • DFI
    Cannonsville Dam Emergency Borehole Response

    By John Vickers, William H. Hover, Paul C. Schmall

    "Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n

    Jan 1, 2016

  • SME
    Canopy Air Curtain to Reduce Diesel Particulate Matter Exposure for Underground Blasters - SME Annual Meeting 2024

    By Taekhee Lee, Steven Mischler, Shawn Vanderslice

    Diesel-powered equipment is widely used in the underground mining industry and their popularity results from properties including efficiency, versatility, reliability, and durability. In the U.S. appr

    Feb 1, 2024

  • AIME
    Cap-Lamp Transmitter Pinpoints Buried Miners

    By K. Tajrych

    Time and again, lives are lost in underground cave-ins only be- cause there is no quick, sure way of locating the victims. When such accidents happen, rescuers must usually depend on the testimony of

    Jan 8, 1969

  • AUSIMM
    Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic Simulations

    By N Steenkamp, L Furstenberg, W Cele, M Richter

    Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t

    Jul 13, 2015

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • AUSIMM
    Cape Lambert Port B Shiploading, Sampling and Analysis

    By M Graham, R Brunning, C Andringa-Bate, S Westergren

    In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por

    Jul 29, 2014

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AIME
    Capillarity - Permeability - Capillary Pressures - Their Measurement Using Mercury and the Calculation of Permeability Therefrom

    By W. R. Purcell

    An apparatus is described whereby capillary pressure curves for porous media may be determined by a technique that involves forcing mercury under pressure into the evacuated pores of solids. The data

    Jan 1, 1949

  • AIME
    Capillarity - Permeability - Capillary Pressures - Their Measurement Using Mercury and the Calculation of Permeability Therefrom

    By W. R. Purcell

    An apparatus is described whereby capillary pressure curves for porous media may be determined by a technique that involves forcing mercury under pressure into the evacuated pores of solids. The data

    Jan 1, 1949

  • AIME
    Capillarity – Permeability - Reservoir Volumetric Parameters Defined by Capillary Pressure Studies

    By G. H. Lair, B. J. Langford, S. H. Rockwood

    Volumetric reservoir analysis is dependent upon a firm relationship between porosity, connate water, and net pay. Capillary presswe data on core samples interrelate these three factors. It is shown th

    Jan 1, 1958

  • AIME
    Capillarity-Permeability - Dimensionally Scaled Experiments and the Theories on the Water-Drive Process

    By G. A. Croes, N. Schwarz

    This paper reports the results of a series of model displacement experiments carried out for measuring the efficiency of the water-drive process. This series forms a continuation and extension of that

    Jan 1, 1956

  • AIME
    Capital and Labor

    By Leo Wolrnan

    IN the relations that exist between capital and labor in this country, there is a bright as well as a dark side. After many years of distressing conditions of labor and a plentiful supply of propagand

    Jan 1, 1938

  • SME
    Capital And Operating Costs For The Unit Processes Of Solvent Extraction And Electrowinning As Applied To Copper Recovery

    By G. A. Kordosky

    Solution mining followed by solvent extraction-electrowinning (SX-EW) is one possible way to economically extract copper from ore bodies which cannot otherwise be profitably exploited. Published costs

    Jan 1, 1986

  • SME
    Capital Budgeting: Forecasting The Future

    By Daniel K. Dysinger

    Capital resource budgeting is the way managers of publicly held companies fulfill their fiduciary responsibility to maximize the wealth of stockholders. Managers maximize shareholder wealth by allocat

    Jan 1, 1997

  • SME
    Capital Budgeting: Forecasting The Future (PriPrint 97-118)

    By D. K. Dysinger

    Capital resource budgeting is the means by which managers of publicly held companies fulfill their fiduciary responsibility to maximize the wealth of stockholders. Managers maximize shareholder wealth

    Jan 1, 1997

  • CIM
    Capturing Energy from Ventilation Air Methane

    By D. L. Cluff

    Ventilation Air Methane (VAM) is a high volume low concentration methane source. The capture or use of methane from VAM is challenging, which results in the routine discharge of methane into the atmos

    Aug 1, 2013

  • ABM
    Caracterização De Placas De Circuito Impresso Por Microscopia Eletrônica De Varredura Visando Recuperação De Metais

    By Marcos Paulo Kohler Caldas

    A recuperação de metais presentes em equipamentos eletroeletrônicos tem atraído interesse em virtude de novas e diferentes tecnologias que visam a reutilização desses elementos químicos em novos proce

    Aug 17, 2017

  • ABM
    CARACTERIZAÇÃO MICROESTRUTURAL E COMPOSICIONAL DE MATERIAL VARISTOR COMERCIAL À BASE DE ÓXIDO DE ZINCO (ZnO) DOPADO

    By José Ramiro Esteves Ramos

    Características microestruturais são determinantes para as propriedades não ôhmicas de materiais varistores, uma vez que elas se relacionam com o coeficiente de não linearidade das curvas U x I, com a

    Aug 17, 2017

  • ABM
    CARACTERIZAÇÃO MICROESTRUTURAL VIABILIZANDO ENSAIO DE TENACIDADE À FRATURA EM COMPÓSITOS CERÂMICOS DE TiB2-AlN VIA SPS

    By Larissa Gomes Simão

    Compósitos à base de diboreto de titânio (TiB2) e nitreto de alumínio (AlN) vêm demonstrando propriedades interessantes quando comparados aos seus materiais de origem. Um exemplo é a melhor relação en

    Aug 16, 2017

  • SME
    Carajas Transport System And Port ? Introduction

    By P. Soros

    Rich iron ore deposits were discovered during the 1960's in the mountain range of Serra dos Carajas, State of Para, Brazil, near the headwaters of the Tocantins River some 400 miles southwest fro

    Jan 1, 1986