Search Documents

Sort by

  • SME
    Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021

    By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz

    Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met

    Jun 13, 2021

  • TMS
    Case Study on the Application of Research to Operations—Calcium Ferrite Slags

    By Stanko Nikolic

    The Top Submerged Lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. TSL technology for continuous converting was first patented in the 1990

  • AUSIMM
    Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies

    By M J. Shearer

    An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume

    Aug 28, 2017

  • CIM
    Case Study – Blind Shaft Sinking for BHP Jansen Project

    By Patrick Rennkamp, Wolf-Dieter Trodel, Andy Fearn

    "The Jansen shafts are completed using purely mechanical excavation. This paper summarises the geology, a description of the shafts, the method used for excavation and the results achieved along with

    Jan 1, 2019

  • AUSIMM
    Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level cave

    By P Nichols, C te Kloot, A Harrison

    Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/

    Nov 21, 2018

  • SME
    Case Study – PVC Ventilation Duct Ventilating Underground Mining Operation

    By T. Weatherwax, A. Rai, J. Poor

    "This paper provides an overview of the current use of auxiliary ventilation products and the challenges with limited air quantity in dead-end entry or working faces. The PVC’s low frictional factor,

    Jan 1, 2016

  • SME
    Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä Mine

    By K. Huttu, A. van Wageningen

    "The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern

    Jan 1, 2015

  • IMPC
    Case Study: Advantages of High Rate Thickening at TISCO Jianshan Iron Mine

    By T. Gong

    Often plans to increase plant throughput provide an opportunity for optimising plant equipment and operating methods. This was the case in 2005 at TISCO Jianshan Iron Mine, when an increase in product

    Jan 1, 2014

  • SME
    Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013

    By A. Jennings, J. Cornet, P. Perrone

    Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi

    Jan 1, 2013

  • SME
    Case Study: Improved Bit Life Utilizing Advanced Cryogenics in Drilling and Blasting - SME Annual Meeting 2024

    By Jenna Wundrack, Evan Thibaud

    The advanced cryogenic treatment is a post-manufacturing metallurgical process that involves subjecting off-theshelf materials to extremely low temperatures, significantly improving wear resistance an

    Feb 1, 2024

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations

    By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi

    Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player

  • DFI
    Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions

    By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen

    Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t

    Jan 1, 2019

  • ISEE
    Cast Blasting in the Light of the Electronic Option

    By Winfried Rosenstock

    The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi

    Jan 1, 2003

  • SME
    Cast High Chromium Media In Wet Grinding

    By R. H. Sailors

    During the last 15 years, the North American Mining Industry has experienced increasing usage of cast high chromium white iron grinding media in wet grinding applications. First introduced into the ce

    Jan 1, 1989

  • DFI
    Cast Insitu Piling For The King's Wharf Project, Sydney, Australia

    By Slav Tchepak

    The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin

    Jan 1, 2000

  • SME
    Cat Unveils Newest Equipment: Wheel Loader and Hydraulic Shovel Join the Catalog

    By William Gleason

    Despite a global slowdown in most mining sectors, Caterpillar, the world?s largest mining equipment maker continues to forge ahead with new, and improved offerings to the global mining industry. On N

  • SAIMM
    Catalyst Management

    By Lene Hansen

    Sulphuric acid plants now and then see unexpected increases in SO2 emissions. Our experience is that it is not always easy for the acid plants to pin point the exact reason for the SO2 increase. S

    Jan 1, 2009

  • SAIMM
    Catalyst Management

    By Lene Hansen

    Sulphuric acid plants now and then see unexpected increases in SO2 emissions. Our experience is that it is not always easy for the acid plants to pin point the exact reason for the SO2 increase.

    Jan 1, 2009