Search Documents

  • AUSIMM
    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Sep 13, 2010

  • AUSIMM
    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Flow Sheet Simulation of Municipal Waste Treatment Processes

    Sep 13, 2010

  • SME
    Flow Through A Tailings-Pond Embankment

    By C. Dan Kealy

    Recent antipollution legislation for the control of mine tailings and waste-water has required an increasing number of tailings ponds. Many of these new waste-retention ponds are being constructed in

    Jan 1, 1971

  • TMS
    Flow Visualization and Temperature Measurements Close to the Arc Attachment Zone of a Laboratory Scale DC Arc Furnace for Slag Cleaning

    By Adrian C. Deneys, David G. C. Robertson

    "Fluid flow phenomena on the surface of a molten slag have been documented using video photography in a laboratory scale D.C. arc furnace. The flow on the surface of the slag appeared to be electromag

    Jan 1, 1999

  • TMS
    Flow Visualization in the Water Model of a Molten Aluminum Tundish

    By F. Shen

    Qualitative and quantitative results obtained during the physical modeling of the molten aluminum flow in a tundish using an aqueous system are presented. Surface tuft, free-surface powder and laser s

    Jan 1, 1993

  • CIM
    Flow Visualization of Newtonian and Non-Newtonian Fluids in High Pressure Die Casting

    By D. Bouchard, M. Forté, A. Charette

    A transparent replica of a casting die was built to achieve a better understanding of the filling mechanisms of aluminum in high pressure die casting. Water and tomato paste were respectively used as

    Jan 1, 2006

  • IMPC
    Flow-field Numerical Simulation and the Application of Ultra-fine Stirred Mill

    By G. W. Zhang

    Ultra-fine Stirred Mill is a kind of high energy efficient equipment for ultra-fine grinding, and has been the mainstream equipment in the submicron powder and slurry industry. This paper mainly descr

    Jan 1, 2014

  • CIM
    Flow-through shares-a good deal better

    By Robert B. Parsons

    "Recent amendments to the so-called ""flow-through share"" rules in our income tax legislation have given a new lease on life to this once popular investment vehicle.The original ""Dome funds"" for ex

    Jan 1, 1983

  • SME
    Flowing And Raveling Clays

    By Roy J. Leonard

    Two small diameter sewer tunnel projects being hand dug under major highways in the Greater Kansas City area encountered problems which were unforeseen from the geotechnical engineering information su

    Jan 1, 1987

  • SME
    Flowing Film Concentrators

    By F. B. Micheli

    Introduction and Historical Background Although both sluices and devices using a simple flowing film are among the oldest known methods of concentration, they are still extensively employed in a vari

    Jan 1, 1985

  • SME
    Flowsheet Description And Process Development Sept-Iles Concentrator

    By Benoit Gagnon

    Mining of the Schefferville iron deposits began in 1954 on completion of the 574 km railway linking the mines and the St-Lawrence river port of Sept-Iles. Apart from crushing, no treatment of these or

    Jan 1, 1980

  • CIM
    Flowsheet Design Using Flotation Rate, Selectivity and RTD Data

    By Manqiu Xu, Peter Wells, Gord Bacon

    "A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th

    Jan 1, 2005

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • TMS
    Flowsheet Development for Benefication of Lithium Minerals from Hard Rock Deposits

    By M. Oliazadeh

    Spodumene [LiAl(Si2O6)] is the most common and desirable economic lithium-bearing mineral due to its high lithium content. In Canada, there are several spodumene deposits at the development stage that

  • CIM
    Flowsheet Development for the Extraction of Rare Earths Using Mintek’s Pyearth™ Process

    By I. Thobadi, C. Pawlik, K. Bisaka, S. Mokoena, M. Erwee

    The PyEarth™ process developed at Mintek has been demonstrated successfully at pilot scale. Nine tons of ore containing 2.3 mass % of total rare earth oxides (TREO) from a dormant mineralogically comp

    Jan 1, 2017

  • CIM
    Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project

    By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton

    "Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub

    Jan 1, 2013

  • IMPC
    Flowsheet Development Of A Nickel Sulfide Deposit At Vale?s Center Of Mineral Development

    By Aline Tavares

    This paper describes the investigative studies carried out at Vale´s Center of Mineral Development (CDM) for a nickel sulfide deposit aiming to develop an adequate flotation flowsheet. The CDM facilit

    Sep 1, 2012

  • SAIMM
    Flowsheet development work for re-opening of Prieska Cu-Zn Mine, J. Taguta and M. Bryson

    By M. Bryson, J. Taguta

    The Prieska deposit, mined between 1971 and 1991, is one of the world’s top thirty volcanogenic massive sulphide (VMS) base metal deposits. The Prieska Copper Mine in the Northern Cape Province was cl

    Jan 1, 2020

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • CIM
    Flowsheet development, commissioning, and start-up of the Voisey’s Bay mill

    By P. Langlois, G. Labonté, J. J. Barrett, J. Holmes

    "The Voisey’s Bay mill processes a high-grade pentlandite and chalcopyrite ore in a largely pyrrhotite/troilite matrix. From 1994 to 1997, circuit development focused on making a 14% nickel concentrat

    Jan 1, 2017