Search Documents

  • SME
    Mine Pillar Design in 1993 – Computers Have Become the Opiate of Mining Engineers – Part II

    By Jack Parker

    Critical width Before we go further into pillar design, we should look into the matter of "critical width," because of its effect on pillar behavior. Critical width refers to the greatest width th

    Jan 1, 1993

  • SME
    Mine Pillar Design Using the Ground Reaction Curve Concept

    By Ravi Ray, Kostas Kaklis, Zach Agioutantis

    "Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio

    Jan 1, 2019

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • SME
    Mine Plan Response To Western Geological Conditions

    By J. M. Mercier

    Approximately seven (7) years of recent intensive mining activity in the Wasatch Plateau Coal Field of Utah has revealed distinct geologic patterns which, at times, profoundly influence reserve estima

    Jan 1, 1984

  • SME
    Mine Plan Risk Assessment and Grade Uncertainty Characterization Using Geostatistical Conditional Simulation: Gold Mine Case Study - SME Annual Meeting 2025

    By Kadri Dagdelen, Steven Hoerger

    For gold mines, orebody uncertainty is one of the leading causes of differences between planned and actual production. Geostatistical conditional simulations create multiple equally probable orebody b

    Feb 1, 2025

  • SME
    Mine Plan Simulation To Evaluate The Impact Of A Remine Best Professional Judgement (BPJ) Analysis

    By L. B. Phelps

    This paper focuses on the use of an integrated mine planing software package entitled "REMINE" which was constructed to provide a project evaluation tool for analysis of remining projects. Coal remini

    Jan 1, 1990

  • CIM
    Mine Planning

    By G. Scott Zimmer

    Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty

    Jan 1, 1978

  • SAIMM
    Mine Planning (d3a3d1a4-3eb5-42a0-a100-700eebbf2b48)

    "Chairman: Professor J. Elbrond Rapporteur: Miss V. E. MartingPapers.Aids to planning production in coal mines by F. H. Deist and M. P. RobertsCapacity calculations, investment allocation and long-ran

    Jan 1, 2014

  • AUSIMM
    Mine Planning - Rate: A Key Criteria

    The mining industry has a well deserved reputation earned over the years for innovation, engineering, management and the quick application to mining of emerging technology. The cumulative result i

    Jan 1, 1989

  • CIM
    Mine planning and design integration (8b994481-1a73-40ce-ac2d-755d2a73f2cd)

    By Earl Gebhardt

    "The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain i

    Jan 1, 1993

  • SME
    Mine Planning And Emission Control Strategies Using Geostatistics ? Introduction

    By Francis Martino

    There are numerous techniques and predictive models used by geologists and mining engineers to define coal reserves and plan mines. The traditional reserve estimation methods commonly used include the

    Jan 1, 1983

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • SME
    Mine Planning At Newmont Gold

    By S. P. Winkelmann

    The expansion in gold production in the Carlin 'Trend over the last few years has been one of staggering proportion. To increase gold production while minimizing capital requirements and providin

    Jan 1, 1990

  • SME
    Mine Planning at Newmont’s Nevada Operations

    By Steven Hoerger

    Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo

    Jan 1, 1999

  • SME
    Mine Planning At Round Mountain Gold Corporation

    By Stephen J. Brower

    Located in Central Nevada, The Round Mountain Gold deposit has been continuously mined since 1977. Present proven and probable reserves are 226 Mt (250 million short tons) at 1.1 g/t (.032 oz per shor

    Jan 1, 1989

  • SME
    Mine Planning At The McKinley Mine

    By M. G. Premo

    The McKinley Mine is located in the northwest New Mexico, in McKinley County, approximately 25 miles from Gallup. The mine is operated by The Pittsburg & Midway Coal Mining Co. (P&M), a wholly owned s

    Jan 1, 1992

  • AUSIMM
    Mine Planning by Quarters

    By B Ascott, J Kennedy, A White

    At mines with low tonnes per vertical metre, like the Jundee Mine in Western Australia, operated by Newmont Asia Pacific, high development rates across multiple mining areas are critical to achieving

    Jan 1, 2008

  • SME
    Mine Planning Considerations In Analyzing Alternative Materials Handling Systems For Surface Mines

    By James E. Lonergan

    To determine the best materials handling system for surface mined materials, one must develop a mine plan for each candidate system based on the most efficient use of that system. This is essential fo

    Jan 1, 1985