  • AIME
    New Laboratory Instrumentation For The Evaluation Of Rock Bolt Behavior

    By Z. T. Bieniawski, E. Unal, H. Reginald Hardy

    INTRODUCTION Rock bolts are a major means of support in underground coal mines in the United States. However, two of the most crucial problems facing the mining engineer today are that of finding a

    Jan 1, 1982

  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • ABM
    New Level 2 Automation Systems For Jsw Steel Toranagallu

    By Rudolf Hubmer

    In October 2013 JSW Steel decided to place an order to Primetals Technologies Austria (former Siemens VAI Metals Technologies) for the installation of a comprehensive Level 2 process optimization syst

    Aug 16, 2017

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • SME
    New Life for the Humboldt Mill: Design, Construction, and Commissioning as a Modern NI/CU Concentrator at Eagle Mine

    By H. Staton, N. Michaelson

    "INTRODUCTION Lundin Mining’s Eagle Operation, located in Marquette County, upper Michigan consists of a mine and concentrator that process a Ni-Cu-(PGE) ore. The mine itself is an underground operati

    Jan 1, 2018

  • SME
    New Life for the Veragold Mine—Low Risk Tailings Storage - SME Annual Meeting 2024

    By Jeff Easton, J Johnson, D. Foot

    The Mina Santa Rosa mine in Panama was the victim of a mine closure 24 years ago that left the community in dire straits. The mine showed the potential resources of greater than 1M ounces of gold and

    Feb 1, 2024

  • AIME
    New Light on Old Metallurgical Problems - Pertaining to Certain Structural Changes in Metals and Alloys

    By Wilfred P. Sykes

    AT intervals in the course of history an event occurs which, though scarcely heeded at the moment, marks in retrospect the beginning of a new era in some one field of human activity. Such a happening

    Jan 1, 1939

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • SME
    New Liner Design Improves Aerofall Mill Throughput*

    By H. R. Coles

    Test work conducted in the 6.4 and 10.52 m Aerofall Mills at the Iron Ore Company of Canada Carol Project showed that the conventionally used ?deflector?-type liners which form the basic principle of

    Jan 1, 1980

  • SME
    New Liquid Coal Products From Future Preparation Plants

    By Im C. J.

    The addition of coal preparation plants changed the coal industry during the past. Now it is time co once again improve the quality and types of coal products coming from future coal preparation plant

    Jan 1, 1989

  • CIM
    New Locked Charge Protection System Prevents Damage To 14mw Geared Mill

    By H De Beer

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Nov 1, 2011

  • CIM
    New Locked Charge Protection System Prevents Damage to 14MW Geared Mill (7b868bde-460b-4446-94f2-2b070ebb2f1b)

    By P. van Zyl, M. Lombaard

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • CIM
    New Locked Charge Protection System Prevents Damage to 14mw Geared Mill (e36f627b-5857-4b5e-9b18-31db39c538e3)

    The 14MW SAG mill at Tarkwa, Ghana, experienced a frozen drop charge incident on 10 February 2010. This caused downtime of 112 hours, a repair cost of $200k and production loss of 162,000 tons, corres

    Jan 1, 2012

  • SME
    New longwall plow system achieves high production at low coal seam

    "Caterpillar has developed the Cat GH800B longwall plow system, designed for mining very low coal seams at high rates. Building on the attributes of the proven GH1600 plow system, the Caterpillar long

    Jan 1, 2014

  • AIME
    New Look At Long-Term Anchorage: Key To Roof Bolt Efficiency

    By Robert Stefanko

    Roof bolting in coal mines has progressed very rapidly in the last decade, and today this method of support is in general use. There are many theories concerning the functions of roof bolts, but the i

    Jan 5, 1962

  • SME
    New look at underground coal mine safety

    By E. M. Spokes

    Starting in 1980, a committee of the National Research Council studied the question of why some underground coal mines are safer than others and what could be done to improve the ones with poorer perf

    Jan 1, 1987

  • SME
    New Mapping Technologies for Tunnel Inspections

    By Chris Laughton, Bernhard Spoerr

    "Tunnel inspections are increasingly needed to ensure that aging infrastructure does not fail in service. To this end the time between inspections is being reduced, the thoroughness of each inspection

    Jan 1, 2016

  • SME
    New Material Handling System For Heap Leach Stack Construction

    By M. L. Clark

    Advances in the recovery of gold from heap leaching are being made daily, but of all the systems vital to the maximum recovery of gold from a leach pile, none is more important than the methods used t

    Jan 1, 1988

  • AUSIMM
    New Materials Technology Applied in Longwall Mining

    Coal slurry pumping was introduced into the U.K. in 1973. Gateside packs were prepared in areas of containment using R.O.M. coal and a special fast setting cement. The packs restricted roadway con

    Jan 1, 1986

  • ABM
    New Measurement System On Continuous Casting Tundishes At Steel Of West Virginia Provides True Steel Running Level And Increases Yield By Accurate Drain Control

    By Mark Gilliam

    Control of true steel level in the tundish during casting is desired in order to maintain the correct pressure head and thus provide a stable flow to the mold. Also the control of tundish draining pre

    Aug 16, 2017