Search Documents

  • SAIMM
    Optimization of mill performance by using online ball and pulp measurements - Synopsis

    By B. Clermont

    Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min

    Jan 1, 2010

  • SME
    Optimization of Millennium Chemical’s Paraiba Guaju Mine

    By K. G. Correia

    The replacement of the dry mining method at Guajú Mine by the dredging method was a means of ensuring its feasibility by maintaining the production levels. Dry mining increased the cost of the deposit

    Jan 1, 2005

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • SME
    Optimization of Operational Parameters to Improve Bioleaching of Arsenic from Mine Tailings in Continuous Stirred Tank Reactors

    By I. Casasbuenas, K. A. Nguyen, E. I. Ngoma, H. Kim, D. Borja, J. H. Park, R. A. Silva, S. Choi

    "This study aimed to determine the optimum operating parameters of a continuous bioleaching system to leach arsenic (As) from mine tailings using a mixed mesophilic bacterial culture. The microbial co

    Jan 1, 2018

  • IOM3
    Optimization of ore pass spacing in vein deposits

    By J. Cech

    Discussion is presented of a decision-making support method for the spacing of ore passes along a long vein orebody and the division of the orebody into convenient stopes for future mining operations.

    Jun 18, 1905

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada&apos;s largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • SME
    Optimization Of Power For Off-Highway Haul Units

    By G. T. Lineberry

    Horsepower requirement is recognized as a most important equipment characteristic. Other critical equipment characteristics will be isolated and analyzed by traditional operations research techniques,

    Jan 1, 1984

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • TMS
    Optimization of Preparation of U3O8 by Calcination from Ammonium Diuranate Using Response Surface Methodology

    By Bingguo Liu, Daifu Huang, Jinhui Peng

    "The conditions to prepare U3O8 by calcination from ammonium diuranate were optimized, and the response surface design method was applied to analyze the influence on the total uranium and U+4 of calci

    Jan 1, 2011

  • IMPC
    Optimization of Process Conditions for Recovery of Additional Clean Coal from Tailing of Flotation Circuit of an Existing Coking Coal Washery of India Using Response Surface Methodology.

    By Sanjay Chaudhuri, V. K. Kalyani, Pradeep Kumar Singh, T. Gouri Charan

    "Indian coal industry is the world's third largest in terms of production and fourth largest in terms of proven coal resources. Indian coal deposits are generally of high ash content varying from 24 t

    Jan 1, 2018

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • TMS
    Optimization Of Rare Earth Leaching

    By Grant Wallace, Rod James, Larry Twidwell, Ed Rosenberg, Courtney Young, Sean Dudley, Hsing-Hsin Huang, William Gleason, Jerome Downey

    The use of applied chemistry in the production and optimization of leach solutions from Rare Earth Element (REE) ores and concentrates is being investigated. Ore and concentrate samples were character

    Jan 1, 2015

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024

  • ABM
    Optimization Of Rolling Parameters For The Production Of Rebar

    By Antônio Aldenor Pinheiro Neto, Matheus de Lima Vieira

    In mid-2015 the steel industry faced a strong crisis due to the weak performance of the Brazilian economy and the persistent entry of Chinese steel into Brazilian territory. This situation demanded th

    Oct 1, 2019

  • IMPC
    Optimization Of Rougher Wet High Intensity Magnetic Separator To Recover Ilmenite From Placer Heavy Minerals

    By T. Laxmi

    This paper details the optimization of rougher Wet High Intensity Magnetic Separator (WHIMS) using response surface methodology. The optimization is in parametric form and takes account of the major o

    Sep 1, 2012

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • SAIMM
    Optimization of shape factor by the response surface method, and the effect on sphalerite flotation recovery

    By T. Uysal

    Various morphological parameters that affect the flotation recovery of sphalerite were modelled and optimized using the response surface method (RSM). The effects of roughness value, shape factor, and

    Sep 6, 2023

  • SAIMM
    Optimization of shift cycles in the South African mining sector

    By J. Pelders, F. Magweregwede, S. M. Rupprecht

    Increased depths of conventional gold and platinum mines, longer travelling times as working places move further from the shaft, and ancillary activities taking place in the mining cycle reduce the us

    Aug 1, 2021