Search Documents

  • CIM
    Optimized Process for Secondary and Low Grade Zinc Raw Material Treatment

    By A. Oja, M. Lahtinen, P. Salonen, B. Saxen

    Most of the secondary and low grade zinc raw materials cannot be treated successfully by either conventional roasting - leaching - electrowinning (RLE) process or even by atmospheric direct leaching p

    Jan 1, 2014

  • CIM
    Optimized Ventilation Ventilation-On On-Demand (VOD)

    By Michel Masse

    1. A battery-powered wireless mesh network for dynamic diesel machinery tracking and operating status monitoring. 2. A real-time ventilation model and fan speed optimizer. 3. An OPC server for infor

    Feb 1, 2008

  • IMMS
    Optimized, Zero Waste Pyrometallurgical Processing of Polymetallic Nodules from the German CCZ License Area

    By Carsten Rühlemann, David Friedmann, Bernd Friedrich, Thomas Kuhn

    "This paper explores the option of direct reduction smelting of the nodules from the German license area in the equatorial NE Pacific in a submerged arc furnace (SAF). An optimized slag design is prop

    Jan 1, 2017

  • AUSIMM
    Optimizing A Bore Core Evaluation Test Programme

    The drilling and evaluation of bore cores provides the best available statistical basis for characterizing a coal prospect. Important, long-term decisions by management frequently must be based on

    Jan 1, 1977

  • TMS
    Optimizing a Cascading Liberator

    By Bradford C. Wesstrom, Omar Araujo

    "Impurities from an electrolytic refinery are typically extracted from the electrolyte utilizing conventional electrowinning cells. These cells are arranged in series with cascading solution flow and

    Jan 1, 2012

  • SME
    Optimizing A Gold-silver Plant Using Mineralogical Data

    By Wolfgang Baum

    The objective of this presentation is to demonstrate the utilization of process mineralogy to improve the plant performance of a large gold-silver operation. From raw ore to tailings, from concentrate

    Jan 1, 1998

  • SME
    Optimizing An Engineered Slope Conveyor System; An OEM/Operator Collaboration

    By Todd Burchett

    Mining engineers spend countless hours and resources when designing a new underground coal mine. Their primary objective is to design the safest and most efficient operating mine with regards to coal

    Jan 1, 2013

  • IMPC
    Optimizing And Evaluating Theoretical Concepts Of Compressive Crushing

    By E. Lee

    Cone crushers are widely used within the mining and aggregate industries for the size reduction of minerals, ores, and rock materials. In mining applications for example, the product from cone crusher

    Sep 1, 2012

  • IMPC
    Optimizing Automatic Control Systems of Flotation Process by Application of Computerized Models

    By V. Avdochin

    The main reason of flotation process fluctuations is mixing ores of various properties from various sections of a deposit. Other, also important reasons are changes in parameters of facilities of tech

    Jan 1, 2014

  • AIME
    Optimizing Ball Mill Liners For Production and Economy

    By David J. Dunn

    At a time when mill availability is at a premium, production costs are rising, and lead time for mill liner casting is a year or more, mill liner design is an important factor in ore grinding. Testing

    Jan 12, 1976

  • SME
    Optimizing Ball Mill Liners For Production And Economy (f78bb3c9-f90e-4a91-8db5-c43af4ae1abb)

    By David J. Dunn

    Mill liner design is an important factor in grinding. Testing and selection of the optimum liner profile for a given set of mill operating conditions can improve mill capacity, liner life, and liner w

    Jan 1, 1976

  • ISEE
    Optimizing Blast Hole Loading with MWD and 3D Image Analysis

    By Tristan Worsey, Brad Gyngell, Todd Buschjost, Gus Diehr

    This paper highlights the opportunities provided by integrating MWD data and drone generated 3D model to industries that use explosive energy to perform useful work as an integral part of their rock e

    Feb 1, 2020

  • SME
    Optimizing Coal Mine Inventory Costs With Material Requirements Planning (149bf5bd-8416-4e90-8021-218c116f0af4)

    By Robert L. Grayson

    In small coal mining operations, little is done in controlling supply and material inventories and optimizing total inventory costs. Material Requirements Planning (MRP) is an efficient material contr

    Jan 1, 1985

  • ISEE
    Optimizing Compressor Output Through Proper Nozzling of Roller Cone Bits

    By Mo Jadbabaei, Scott Harrison

    There is very limited information available regarding the air pressures, flow rate, and velocity profiles in blast hole air drilling applications. Currently, many people are using incompressible flow

    Jan 1, 1999

  • SME
    Optimizing Conditions For Wet Grinding Of Synthetic Rutile Using Response Surface Methodology

    In this paper, response surface methodology was applied to optimize the experimental conditions for the wet grinding of synthetic rutile. The effects of parameters such as rotation speed, solids conce

    Jan 1, 2011

  • SAIMM
    Optimizing control for a two-stage grinding circuit, O. Haavisto, M. Olofsson, J. Martikainen, S. Kauvosaari, and M. Kosonen

    By S. Kauvosaari, M. Olofsson, O. Haavisto, M. Kosonen, J. Martikainen

    The target in grinding circuit operation is usually to maximise the throughput and energy efficiency while keeping the product particle size on an optimal level for downstream operations. Furthermore,

    Jan 1, 2020

  • SME
    Optimizing Conveyor Capacity and Reliability: The Pittsburgh & Midway Coal Mining Co.- North River Mine Experience

    By Roland Hoet, Jim Patilla, Nick Madison

    Increasing conveyor capacity and reliability is a common goal for many underground mines. This task is especially challenging when you must work with existing structure, belt, etc. Meeting this challe

    Jan 1, 2002

  • SME
    Optimizing Copper Leaching/SX-EW Operations With Mineralogical Data

    Exploration for SX-EW copper deposits and plant operation depend largely on the copper and gangue mineralogy inasmuch as? they govern the feasibility of leaching. Mineralogical parameters are pivotal

    Jan 1, 1996

  • SAIMM
    Optimizing cut-off grade considering grade estimation uncertainty – A case study of Witwatersrand goldproducing areas

    By C. C. Birch

    Due to grade estimation uncertainty, two statistical errors can occur. The Type I error is where material is classified as ore and mined, despite the true value being below the break-even grade. This

    Jul 2, 2022

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025