Search Documents

  • SAIMM
    Optimizing Manganese Ore Sinter Plants: Process Parameters And Design Implications

    By W. Barthel, B. A. Dippenaar, J. Malan

    In its most basic form, the process of sintering is very simple, and has been in use since the turn of the previous century. However, while the basic process is simple, control of

    Jan 1, 2004

  • SME
    Optimizing Methane Drainage Systems To Reduce Mine Ventilation Requirements

    By George Aul, Richard Ray

    Short-hole horizontal degasification systems have been utilized in Island Creek's Virginia Division mines since 1986. These systems remove methane from the coal seam in advance of longwall mining

    Jan 1, 1991

  • CIM
    Optimizing Microseismic Source Event Location by Applying a Variable Velocity Model to a Complex Geological and Mining Setting at the New Gold, New Afton Block Cave

    Microseismic (MS) methods offer one of the few ways to monitor a 3D volume of rock and essentially see into the rockmass and the regions of real time rock fracture. This is a critical component when c

    Aug 1, 2013

  • SME
    Optimizing Mill Performance: Real—Time Grinding Insights - SME Annual Meeting 2025

    By Karl Gugel, Dante Garcia, Peter Czel, Eduardo Nunez, Joshua Morales, Boris Sullcahuaman

    Real-time operational excellence is achieved through the seamless integration of various components. Key aspects include precise instrumentation, real-time data collection, data analytics, and an effi

    Feb 1, 2025

  • SME
    Optimizing Mine Ventilation At The Henderson Mine

    By Robert C. White, Kurt W. Keskimaki

    The Henderson Mine is a large underground panel cave molybdenum mine located near Empire, Colorado. Diesel equipment is employed for all development work, as well as production ore handling. Due to fl

    Jan 1, 1989

  • SME
    Optimizing Nitrogen Injection for Progessively Sealed Panels

    By J. A. Marts, R. C. Gilmore, Jr. Bogin, S. A. Saki, J. F. Brune, J. W. Grubb

    "Colorado School of MinesResearchers at Colorado School of Mines (CSM) have developed computational fluid dynamic (CFD) models to study gas distributions and explosion and fire hazards in longwall gob

    Jan 1, 2015

  • ISEE
    Optimizing Non-ideal Blasting for Ideal Grinding

    By Jack Eloranta

    The winning of metals often requires fine grinding of very hard ore. The US Bureau of mines measured compressive strengths exceeding 100,000 PSI (700 MPa) in Minnesota taconites. Grinding down to 300

    Jan 1, 2013

  • SME
    Optimizing Of Flotation Reagents?

    By William F. Riggs

    The basic theme of this symposium and panel Is Rotation Pads: Are They Optimized? There Is a. reason for phrasing the title In the form of a question. There Is not only the technical competency which

    Jan 1, 1993

  • SAIMM
    Optimizing of gas-shielded metal arc welding parameters for 10.5-12.5% chromium steel using 308L electrodes

    By J. W. van der Merwe, A. M. Maleka, V. J. Matjeke

    The 10.5–12.5% chromium, titanium-stabilized ferritic stainless steel (FSS) plates used to fabricate coal line jumbo wagons is susceptible to undesirable chromium depletion during welding with 309L el

    Apr 5, 2023

  • IMPC
    Optimizing of Roller Press Forming Cavity Profile Using Finite Element Simulation

    By R. T. Dec

    Current industrial compacting and briquetting practices are largely based on trial-and-error techniques. This paper introduces a two-dimensional finite element model of briquetting process in the roll

    Jan 1, 2014

  • CIM
    Optimizing Ore Recovery in Shallow-Dipping Orebodies (45-60 deg): A Framework for Stope Design, Drill and Blast, and Equipment Selection

    By Gurupraveen Ramanathan

    Shallow-dipping orebodies (45°–60° dip) present significant challenges for underground longhole stoping, particularly due to limited gravity flow, drill misalignment near the footwall, increased poten

    May 4, 2025

  • CIM
    Optimizing Performance at the David Bell Mine Concentrator

    By K. Meyer

    "The largest cost centres of the David Bell Mine concentrator are grinding, leaching and effluent treatment. Optimizing results during the 6th year of operation are listed below: o SAG mill slurry den

    Jan 1, 1991

  • CIM
    Optimizing Performance in Heavy Equipment Teleoperation

    By Jean-François Lapointe

    Many advances have been made concerning the automation of heavy equipment teleoperators such as those found in mining. Complete automation, however, is not achieved yet and the operation of these vehi

    May 1, 2001

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • SME-ICGCM
    Optimizing Pillar Design In A Multi-Seam Environment

    By R. Kanniganti

    The primary problems of pillar design in seams subject to interaction are due not only to difficulties in predicting loading, but also to the often unsymmetrical nature of the stress fields. The effec

    Jan 1, 1995

  • SME
    Optimizing pit shells in the presence of geologic uncertainty with a heuristic algorithm - SME Transactions 2018

    By C. V. Deutsch, T. Acorn

    Understanding and managing risk is of increasing concern for the mining industry. Although methods exist to model geologic uncertainty based on stochastic modeling techniques and multiple realizations

    Jan 1, 2018

  • SME
    Optimizing Pit Slopes At The Bougainville Copper Mine, Papua New Guinea

    The height of permanent slopes at the Panguna mine of Bougainville Copper Limited will vary from 350 to 950 metres. A few degrees difference in slope angle has a large effect on the ore/waste strippin

    Jan 1, 1987

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • SME
    Optimizing plant efficiency with attrition scrubbers

    By Mike Preston

    Attrition scrubbers may not be glamorous, but they are an important and sometimes neglected step in mineral processing. Optimal attritioning will significantly improve the results and efficiencies of

    Oct 1, 2013

  • CIM
    Optimizing Plant Facilities Location

    By R. D. Hossack

    "The selection of a site for plant facilities is a function of several factors and has as its objective the maximization of profits, given fixed markets and sources of raw material locations. In pract

    Jan 1, 1970