Search Documents

  • DFI
    Piles In Peat Under Artesian Pressure: A Case Study ? Synopsis

    By K. Y. C. Chung

    A case study on foundation engineering through organic soils is presented. Located along the west shore of the Hudson River, site soils consist of random brick fill over a thick layer of peat and orga

    Jan 1, 2010

  • DFI
    Piles Lateral Force Capacity

    By Naim Noori Samie

    Lateral force rsistance of piles is analytically investigated by dividing the pile length to 3 segments. The first segment (Zone I) models the load eccentricity with respect to the soil and the pile-d

    Jan 1, 1996

  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
  • DFI
  • DFI
  • DFI
    Piling Design and Construction Codes and Standards for Buildings A United States Perspective

    By Rudolph P. Frizzi

    "Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu

    Jan 1, 2014

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • DFI
    Piling Projects Constructed With Vinyl Polymer Support Fluid In Glasgow, Scotland

    By Derek J. Lennon

    Ground conditions in central Glasgow generally comprise loose granular deposits overlying stiffer soils. CFA piling would normally be preferred for urban sites in these ground conditions, but flightin

    Jan 1, 2006

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • SME
    Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case Study

    By Y. Q. Zhang, S. S. Peng

    Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st

    Jan 1, 2004

  • AUSIMM
    Pillar Barricades at Broken Hill South Limited, Broken Hill, N.S.W.

    This paper describes the methods of constructing timber barricades against pillars of ore in the South Mine, property of Broken Hill South Limited, Broken Hill, N.S.W., and discusses the behaviour of

    Jan 1, 1946

  • SAIMM
    Pillar Behaviour and Seismicity in Platinum Mines

    By S. M. Spottiswoode

    Crush pillars are widely used in mine workings on the Merensky Reef in the Bushveld Complex to prevent panel collapses. Crush pillars are expected to fail as or soon after they emerge from the face an

    Jan 1, 2014

  • CIM
    Pillar Blasting at the Murray Mine

    In April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un

    Jan 1, 1963

  • SME
    Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall Operations

    Longwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De

    Jan 7, 2020