Search Documents

  • AIME
    Planning And Design - A Crucial Phase In Open Pits And Quarries - Pit Planning And Layout

    Key elements of open-pit design fixing the ultimate pit limits are stripping ratio, pit slope angle, and grade cutoff. Results of exploratory and development drilling should be reduced to horizontal s

    Jan 10, 1967

  • AUSIMM
    Planning and Design Considerations for Shay Gap Township Built by Goldsworthy Mining Limited

    By Ellson I. G

    Advantage has been taken of the need to build the new mining town of Shay Gap to incorporate a new standard of living in an isolated area, which suffers from climatic extremes. The various problems

    Jan 1, 1973

  • SME
    Planning And Design Features Of The Waller Creek Tunnel, Austin, Texas

    By Gary Jackson

    Preliminary engineering for the Waller Creek Tunnel was completed in 2001, but the project was held in abeyance until the summer of 2007. This paper describes several features of the revised design, w

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • AUSIMM
    Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, India

    By R K. Dayal

    Many transport tunnels show distress after few decades of construction. Owing to exorbitant cost of replacement, rehabilitation of tunnels has become inevitable and rapidly gaining attention/significa

    Jan 1, 1999

  • SME
    Planning and Design of the A3 Hindhead Tunnel, Surrey, United Kingdom

    By Tom Ireland, Tony Rock

    The proposed 1.83km long twin bore A3 Hindhead road tunnel planned for contruction in 2008 is being delivered under a Highways Agency Early Contractor Involvement (ECI) contract. The proposed cons

    Jan 1, 2007

  • SME
    Planning and Design of the Bay Tunnel

    By Johanna I. Wong, R. John Caulfield, Victor S. Romero

    The existing Hetch Hetchy water system, owned and operated by the San Francisco Public Utilities Commission (SFPUC), serves 2.4 million people within the San Francisco Bay Area. The system has existin

    Jan 1, 2007

  • SME
    Planning and Designing For Mining Conservation

    By David B. Brooks, Roger L. Williams

    Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so

    Jan 1, 1973

  • AUSIMM
    Planning and Developing a New Mine in the Old Stawell Goldfield

    The history of potential large scale development at Stawell in northwestern Victoria dates back to 1914, when Great Boulder Mines Limited, of Kalgoorlie, Western Australia, took up options on some of

    Jan 1, 1984

  • AUSIMM
    Planning and Development of Newstan Colliery, Newcastle, N.S.W

    In preparing a paper such as this it was thought that the Newstan Colliery Company Ltd., being comparatively new, would need some introduction to mining people in general.The Newstan Company was forme

    Jan 1, 1954

  • CIM
    Planning and development of Syncrude's new truck and shovel oilsands mine

    "Syncrude Canada Ltd. operates one of the largest surface mines in the world. The mining operation has two distinct phases: (1) the removal of the overburden, utilizing trucks and shovels; and (2) the

    Jan 1, 1993

  • SME
    Planning And Development Of The Deserado Mine - Rangely, Colorado

    By Don L. Deardorff

    The Deserado Mine and transportation system is the fuel supply portion of the Bonanza Power Plant project. Deserado Mine con¬sists of an underground mine with a capacity of 1,224,700 tonnes (1,350,000

    Jan 1, 1984

  • CIM
    Planning and Development of the Lake Dufault Mine

    By J. R. Smith

    "The Lake Dufault orebodies were discovered by deep surface diamond drilling. When a reasonable amount of outline drilling had been completed, the decision to go into production was made. The fact tha

    Jan 1, 1966

  • TMS
    Planning and Execution of the 4th Major Overhaul of BCL Limited's Smelter

    By K. Robinson

    Following the longest Smelter campaign in BCL?s history it was planned to completely rebuild the flash smelting furnace in 1987. This was the fourth major overhaul and the most extensive so far attemp

    Jan 1, 1993

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • SAIMM
    Planning and Forecasting Stope Production

    By Daniel W. Kappes, Pierre F. X. Mousset-Jones

    "In this paper a discussion is presented of a program designed to produce a 40-day production forecast for an underground stoping system.The program is intended to be a tool for the operations departm

    Jan 1, 2014

  • AUSIMM
    Planning and Investigation of the Airport Link Tunnel and Northern Busway, Brisbane

    By T Peglas, A de Aboitiz

    The Queensland Government, via the special purpose company vehicle û City North Infrastructure Pty Ltd û is currently developing BrisbaneÆs Airport Link underground toll road and Northern Busway (Wind

    Jan 1, 2008

  • AUSIMM
    Planning and Modelling Maintenance Activities for High Effectiveness

    By M Lellis

    During the last decades, maintenance has changed from an ordinary repair activity to a complex function that plays an essential role contributing for the companyÆs results. The increasing level of com

    Jan 1, 2003

  • CIM
    Planning and Operation of Gaseous Mines

    By A. J. Hargraves

    "It is difficult to quantify comparatively the gassiness of a property. The most common index to gassiness, cubic feet of gas per ton of coal mined, is very arbitrary and does not take into account th

    Jan 1, 1973

  • CIM
    Planning and operational cutoff grades based on computerized net present value and net cash flow

    By Arnold R. Pasieka, George V. Sotirow

    "The object of this paper is to outline a computerized net cash flow approach for practical cutoff grade determinations. A cutoff grade carries not only geological but also economic value, in which co

    Jan 1, 1985