Search Documents

  • ISEE
    Practical Aspects of GPS Positioning and Equipment Monitoring Technology in Drilling and Blasting

    By Carl Hendricks

    Aquila Mining Systems Ltd., is the world leader in drill monitoring, control and GPS-based machine navigation systems for the mining industry. This paper will review the design and application of AQUI

    Jan 1, 2000

  • SME
    Practical Aspects of In Situ Pressuremeter Testing in a Cemented Mine Backfill: Logistic and Implementation

    By Stéphane Servant, Jacques Ouellet, Ferri Hassani

    This paper presents essentially the logistic and practical aspects involved for in situ testing of mine paste backfill with a self-boring pressuremeter. The investigation discussed in this paper is pa

    Jan 1, 2001

  • SAIMM
    Practical aspects of large-scale conditional simulations

    By M. E. Rossi

    All large-scale applications of conditional simulations intend to benefit from the ‘correct’ (or’ accurate’) characterization of uncertainty, adequately describing the variability observed from the da

    Jan 1, 2003

  • SME
    Practical Aspects Of Mine Drainage Control And Treatment

    By G. L. Barthauer

    It is a distinct privilege to have the opportunity of addressing this group today. Although I, myself, am not a mining engineer, I have always had profound admiration and respect for those of you who

    Jan 1, 1967

  • AIME
    Practical Aspects of Mine Equipment Replacement Analysis

    By D. W. Gentry, H. E. Sherer

    Determining the age at which to replace a specific piece of mining equipment, and choice of the best possible replacement, is a problem common to nearly all mining operations. This paper examines the

    Jan 1, 1984

  • SME
    Practical Aspects Of Mine Ventilation

    By E. J. Onuscheck

    With passage of the Federal coal' Mine Health and Safety Act of 1969, many challenges have been directed to the industry's mining and safety engineers. The most critical challenge is that of

    Jan 1, 1970

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • SME
    Practical Aspects Of Oxide Copper Recovery With Alkyl Hydroxamates

    By J. S. Lee

    Alkyl hydroxamates are well known collectors for oxide copper minerals as evidenced by the large amount of published literature. Our studies on a wide variety of copper ores from around the world have

    Jan 1, 1998

  • SME
    Practical Aspects of Tabling

    By John W. Amos, John A. Christophersen

    The Deister No. 7, "77" and "88" Coal Washing Tables have been used by the coal industry in the cleaning of finer sizes of coal (-1/2") since washing of coals became necessary. This paper will deal wi

    Jan 1, 1988

  • SAIMM
    Practical Aspects Of The Ventilation Of High-Speed Developing Tunnels In Hot Working Environments

    The excavation of ramps and tunnels often requires high-speed development with (or without) the use of high-energy mining equipment such as loaders, dump trucks, TBMs and roadheaders. This high-spee

    Jan 1, 2000

  • AIME
    Practical Benefits of Improved Metallurgical Balance Techniques

    By R. L. Wiegel

    The generation of operating information for mineral beneficiation processes has become more sophisticated as a result of the use of improved laboratory analytical techniques, some of which provide mul

    Jan 1, 1983

  • SME
    Practical Challenges For The Mine: Precious Metals Accounting And Reconciliation

    By Will Jansen

    When Enron rocked the United States with its Titanic-sized financial accounting scandal, miners and metallurgists were probably too busy on the mine sites in remote locations to wonder about its rippl

    Jan 1, 2009

  • SME
    Practical Coalbed Height Limits For Protective Canopies

    By John W. Crawford

    The title of the paper which I have been asked to present is somewhat misleading it infers in fact that there is a definite coalbed height below which raps or canopies cannot be applied to electric fa

    Jan 1, 1975

  • AIME
    Practical Compliance Problems With The New Mine Lighting Law - Coal

    By Larry D. Patts

    Section 317(e) of the Federal Coal Mine Health & Safety Act of 1969 directed the Secretary of the Interior to prepare standards under which all working places in a mine shall be illuminated by permiss

    Jan 3, 1978

  • SME
    Practical Compliance Problems With The New Mine Lighting Law -Coal (3cc0a099-e222-4bfc-8940-4a05a2651198)

    By Larry D. Patts

    Section 317(e) of the Federal Coal Mine Health & Safety Act of 1969 directed the Secretary of the Interior to prepare standards under which all working places in a mine shall be illuminated by permiss

    Jan 1, 1977

  • AIME
    Practical Compliance Problems With The New Mine Lighting Law – Coal (bb120824-5702-4bc1-9648-7c820231b278)

    By Larry D. Patts

    Section 317(e) of the Federal Coal Mine Health & Safety Act of 1969 directed the Secretary of the Interior to prepare standards under which all working places in a mine shall be illuminated by permiss

    Jan 1, 1979

  • SME
    Practical Consequences Of The Time-Dependency Of Ground Behavior For Tunneling

    By George Anagnostou

    Time-dependent ground behavior may have important implications for the construction process or the life of a tunnel. The paper gives a concise overview of the influence of time on the deformations and

    Jan 1, 2007

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • AUSIMM
    Practical Considerations and Shortcuts in Sampling

    By D M. Frantois-Bongarton

    "A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem

    Aug 21, 2012

  • AUSIMM
    Practical Considerations for Multimine Grade Reconciliation

    This paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described

    Mar 1, 2010