Search Documents

  • SME
    Predictive geochemical modeling of long-term environmental impacts from waste rocks

    By Guido Deissnann, Jennifer L. Kirkaldy, Stephan Kistinger, Carol M. Pettit

    Contaminated mine drainage presents a potential hazard for aquatic ecosystems and groundwater resources. Reliable predictions of long-term developments in seepage quality are necessary to select reaso

    Jan 1, 2000

  • AUSIMM
    Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near Crandon

    By D T. Feinstein, M B. Gotkowitz

    In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including

    Jan 1, 2003

  • AUSIMM
    Predictive maintenance modelling for bearing-based equipment

    By Y Xie, D Willingham

    Predictive maintenance (also known as ‘condition/health monitoring’) refers to the intelligent monitoring of equipment to avoid future failures. In contrast to conventional preventive maintenance, the

    Jul 24, 2017

  • AUSIMM
    Predictive Maintenance Using Simulation and Machine Learning

    By R Marchant, D Willingham

    "Predictive maintenance (also known as PHM or equipment ‘health monitoring’) refers to the intelligent monitoring of equipment to avoid future equipment failures. In contrast to conventional preventiv

    Oct 10, 2016

  • CIM
    Predictive Modeling For In Situ Recovery Operation

    By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert

    For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec

    Jan 1, 2020

  • ISEE
    Predictive Modelling for Equipment Blast Exclusion Zone Reduction

    By Kim Henley, Chris Batten

    This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity

    Feb 1, 2020

  • SME
    Predictive Modelling of CART‑Based Frictional Resistance in Mine Ventilation Systems

    By Yucheng Li, De Huang, Yonghong Liu

    Mine frictional resistance is one of the essential parameters of mine ventilation systems, and it is of considerable significance for the prevention and control of mine risks and accident hazards. Fri

    Jan 28, 2022

  • SME
    Predictive modelling of polymetallic nodule deposits in the Cook Islands Exclusive Economic Zone

    By Greg Partington, Darryl Thorburn, Charlene Wildman, Elisa Puccioni, Connie Payne, Campbell McKenzie

    "Mineral prospectivity modelling of polymetallic nodule deposits has been completed over the Cook Islands Exclusive Economic Zone (CIEEZ) using the GIS based Weights of Evidence modelling technique. P

    Sep 1, 2014

  • SME
    Predictive Optimization Of Convergency Behavior In Numerical Solution Of Mine Fan Characteristics

    By C. Orf. Chukabarah

    Erratic behavior in convergency during iterative numerical-method evaluation of mine ventilation fan characteristic curves is one of the common problems encountered in mine ventilation network analysi

    Jan 1, 1993

  • AUSIMM
    Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example

    By A Fitzpatrick

    An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa

    Jul 10, 2012

  • AUSIMM
    Predictive spatial modelling of rock mass properties using machine learning techniques

    By J Q. Shi, M Karakus, Y Liu

    Predicting the spatial distribution of rock mass properties in cave mining is a critical challenge. In this study, we introduce a novel machine learning-based model to advance our comprehension of roc

    Sep 1, 2024

  • AUSIMM
    Predictive Three-Dimensional Modelling of Nuggety Gold Orebodies, Sunrise Dam, Western Australia

    By M J. Nugus, F Clark, E J. Hill, J T. Carswell, J S. Cleverley, N H. S Oliver

    High-nugget gold orebodies are difficult to model in 3D because samples from diamond drill core are generally too small to provide reliable estimates of the gold content of the larger body of rock, an

    Sep 26, 2013

  • SME
    Predominance Area Diagrams Bounding the Cu-As-S-O System’s 3DPredominance Diagram at 900 K (627 °C) Mining, Metallurgy and Exploration

    By M. Sadegh Safarzadeh, Stanley M. Howard

    The two-dimensional predominance area (Kellogg) diagram (PAD) surfaces bounding the three-dimensional Cu-As-S-O system were constructed at 900 K. The computations employed gases As4O6(g), O2(g), and S

  • NIOSH
    Predriven Recovery Rooms Reduce Longwall Equipment Transfer Time - Objective

    Reduce longwall equipment transfer time between panels by utilizing a predriven recovery room, and thus eliminate the premove preparation associated with most equipment recovery methods. Background

    Jan 1, 1989

  • AIME
    Preface

    Jan 1, 1923

  • AIME
  • IOM3
    Preface (2a00466e-9a28-4c59-b79a-3ed1115d65b4)

    By Ruddle R. W.

    Although copper has been smelted for many years, relatively small attempt has been made in the past to examine the fundamental physical chemistry of the processes involved. Therefore, technological de

    Jan 1, 1953

  • AIME
  • AIME
  • AIME