Search Documents

  • IOM3
    Preliminary calculations for zinc extraction by submerged smelting

    By T. A. A. Quarm

    The concept of a continuous zinc smelting process which employs submerged combustion of coal char for both heating and reduction is described. An estimate of the results of smelting a marmatitic zinc

    Dec 1, 1971

  • SME
    Preliminary Considerations For Longwall Mining ? Introduction

    By George R. Huebner

    The White Pine Copper Company, subsidiary of Copper Range Company, is located in the Upper Peninsula of Michigan. The offices, plant, and mine are six miles south of Lake Superior in Ontonagon County.

    Jan 1, 1964

  • SME
    Preliminary Data Collection For Pit Slope Design ? Introduction

    By R. D. Call

    During the past fifteen years considerable progress has been made in the technology of slope design. It is possible to design rational slope angles if suitable data on geology, hydrology, and rock pro

    Jan 1, 1976

  • SME
    Preliminary Design Considerations

    By Donovan F. Symonds

    INTRODUCTION The selection of the optimum coal preparation plant flowsheet is a vital part of the development of a new plant or the expansion of an existing facility. Selection of an inappropriate fl

    Jan 1, 1991

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • SME
    Preliminary design of a solvent extraction process for the galvanic stripping of iron from D2EHPA

    By C. M. Chang, H Gu, J. A. Barrera-Godínez, T. J. O’Keefe

    The inability to economically separate Fe3+(aq) from a variety of liquid effluents is a major Concern for the primary metals industry. A unique solvent extraction process, galvanic stripping, has been

    Jan 1, 2000

  • SME
    Preliminary Design Of Sedimentation Ponds

    By Larry D. Wayland

    Almost 100 sedimentation ponds were conceptually designed for a large surface mining study area in northeast Texas. An approximate procedure was developed to economically estimate construction quantit

    Jan 1, 1983

  • SME
    Preliminary Design of the Caldecott Fourth Bore

    By Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen

    This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup

    Jan 1, 2007

  • SME
    Preliminary Design of Tunnels for the Lower Northwest Interceptor, Sacramento, California, USA

    By Joel Nonnweiler, Galen Samuelson Nagle

    The Sacramento Regional County Sanitation District (SRCSD) has undertaken an interceptor expansion program to meet future wastewater needs associated with projected growth over the next 20 years. The

    Jan 1, 2003

  • SME
    Preliminary Development of a TGA Method for Determining Coal to Mineral Ratios in Respirable Dust Samples

    By M. Scaggs

    "Respirable dust in underground coal mines has long been associated with lung diseases, and regular dust sampling is required for assessing occupational exposures. At present, respirable dust concentr

    Jan 1, 2015

  • IMMS
    Preliminary Economic Evaluation of Rare Metal Recovery from Cobalt-rich Manganese Crusts

    By Tetsuo Yamazaki

    The importance of cobalt-rich manganese crusts on the Pacific seamounts for possible future rare metal sources has currently been recognized. The thin layer-type deposit characteristics affect not onl

    Jan 1, 2010

  • CIM
    Preliminary Environmental Modelling of Effluent Nitrogen Species Concentrations for Feasibility Level Open Pit Mine Projects

    By Catherine T. Ziten

    Introduction ?Environmental assessments required for permitting ?Focus on ammonia produced through mine construction & blasting ?Water quality guidelines: federal, provincial, IGO ?Reported values

    May 1, 2009

  • SME
    Preliminary Evaluation Of Air-Sparged Hydrocyclone Technology For Scavenger Flotation Of Western Phosphates

    By J. D. Miller

    The sedimentary western phosphate deposits of Idaho, Montana, Utah, and Wyoming tend to be calcareous and generally carry a significant amount of dolomite along with collophanite. In some cases, such

    Jan 1, 1993

  • SME
    Preliminary Evaluation Of Bubble Column Flocculation (8244b9f5-7367-408f-9ee2-97697eb32365)

    By M. T. Ityokumbul

    Experiments have been carried out to determine the efficacy of bubble column flocculation. An acid-base neutralization method was used to determine the mixing time in a 0.064 m x l.5 m bubble column e

    Jan 1, 1998

  • SME
    Preliminary Evaluation of Carbon Dioxide, Oxygen, and Hydrogen for Promoting Chromite Liberation by Breakage "Mining, Metallurgy & Exploration (2021)"

    By Mehmet Ali Recai Önal, MAHMUT CAMALAN

    Mineral liberation is one of the primary objectives in comminution circuits for the downstream separation of valuable minerals. Breaking minerals through their grain boundaries (grain-boundary breakag

    Oct 29, 2020

  • TMS
    Preliminary Evaluation of Spark Plasma Extrusion

    By K. Morsi

    The interest in spark plasma sintering has been growing considerable over the past few years. This has been brought about by the unique advantages of the process, which include reduced sintering tempe

    Jan 1, 2009

  • SME
    Preliminary Evaluation Of The Effect Of Coal Cleaning On Trace Element Removal

    By Charles T. Ford

    In 1971, Bituminous Coal Research, Inc~ established a program to provide the coal industry with the necessary information and technical capability to investigate and evaluate potential problems concer

    Jan 1, 1977

  • SME
    Preliminary Evaluation Of The Factors Affecting The Use Potential Of Clays And Shales In Pennsylvania

    By David M. Lapham

    In Pennsylvania, 310 sampled sites of clay and shale have been evaluated for: potential use, chiefly as structural clay products, refractories, and lightweight aggregate; lithology; physical propertie

    Jan 1, 1971

  • CIM
    Preliminary evaluation of the methane production potential of coal seants at Greenltills Mine, Elkford, British Columbia

    By R. Augsten, K. K. Feng, K. C. Cheng

    "Methane emission and the desorption characteristics of vertical borehole coal samples of Greenhills multiple seams in the vicinity of Elkford, British Columbia were investigated. Three vertical boreh

    Jan 1, 1984

  • NIOSH
    Preliminary Evaluation Of Underground Coal Gasification At Hanna, Wyo.

    By G. G. Campbell

    The Bureau of Mines initiated a field test of underground coal gasitication to investigate the technologic feasibility of gasifying a subbituminous coal. The test site is near the town of Hanna, Wyo.,

    Jan 1, 1974