Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Rail Transportation After DeregulationBy E. P. Evert
Profitable marketing of most minerals is dependent upon the total delivered cost to the user. Transportation costs are often greater than the value of the mineral f.o.b. the mine or processing facilit
Jan 1, 1985
-
Rail Transportation Of Bulk Materials Yesterday, Today And TomorrowBy Henry E. Keniston
In every business today costs come under almost microscopic scrutiny. It's hard to conceive that less than 30 years ago there was no such cost consciousness apparent in overall industry. Railroad
Jan 1, 1972
-
Rail Transportation Of Industrial Minerals - Introduction:By Raymond S. Shrode
Transportation is one of several important increments in the total market cost of most commodities. On a national average it has been reported that transportation accounts for about 25% of the total c
Jan 1, 1969
-
Rail Transportation of Mineral CommoditiesBy Ernest E. Thurlow
Introduction Today, more than 50% of rail-carried commodities are mineral industry related, with coal being the most important single commodity moved by rail. In 1980, coal accounted for more than 5.
Jan 10, 1982
-
Rail wear assessment techniques at FASTBy Richard P. Reiff
"The Facility for Accelerated Service Testing (FAST) program has been involved in numerous rail wear tests since its inception in 1976. A number of specialized tools have been developed to aid in asse
Jan 1, 1988
-
Rail-Veyor® An Energy Efficient Alternative to Material HaulageBy Patrick Fantin
Mining ? The Past Safety Not a priority; Health Not a priority; Energy Manual Labour; Horsepower? Literally. Financially Robust For the Owner?s; Mining ? The Future Safety Ze
May 1, 2013
-
RailroadBy John W. Brauns, David H. Orr
9.1-1. Description and Basic Function. A conventional railroad haulage system for a surface mine performs the function of transporting the ore and/or waste out of the pit to a crushing plant or dump.
Jan 1, 1968
-
Railroad Bridge Approach Embankment Settlement MitigationBy Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery
Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate
Jan 1, 2018
-
Railroad Car-Dumper Coal SamplingBy Armand Bur, W. R. Reichenstein
Since coal is one of the largest cost items in the production of electricity, its analysis for heat value and composition has been the subject of intensive study. Sampling started with crude hand meth
Jan 5, 1959
-
Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad - West Elizabeth Avenue Storm Drainage Project, Linden, New JerseyBy Keith Schaeffer
This paper presents a history of the planning, engineering and construction completed for the railroad tunnel crossing part of the West Elizabeth Avenue Storm Drainage Project, undertaken to relieve f
Jan 1, 2008
-
Railroad Cut-0ff Speeds Up Transport To FrontBy completing a double-track railroad cut-off, involving a large volume of cut and fill, in addition to a half-mile bridge spanning an important French river, engineers in the zone of the Services of
Jan 12, 1918
-
Railroad Interface Management For Mta East Side Access Project Tunnels And StructuresBy Michael A. Piepenburg
The East Side Access (ESA) Project will extend Long Island Rail Road (LIRR) into midtown Manhattan via 11 km of tunnels, a new terminal station and associated support facilities. In addition to the ha
-
Railroad Locomotive Whole-Body Vibration Study: Vibration, Shocks And Seat Ergonomics - IntroductionBy R. Luhrman, E. Christ, B. Gores, S. Fischer, E. Johanning
North American railroad locomotive operators (engineers and conductors) are exposed to multi-axis vibration and shocks (1, 2). A recent epidemiological survey showed a prevalence of serious type of ne
Jan 6, 2006
-
Railroad Presidents Meet with Herbert Hoover and Mining EngineersBy AIME AIME
A COMMITTEE of the American Railroad Association, consisting of Samuel Rea, president of the Pennsylvania System, Chairman; F. D. Underwood, president of the Erie Railroad; A. T. Dice, president of th
Jan 1, 1920
-
Railroad Progress In The Transportation And Handling Of Bulk MaterialsThe past decade has seen remarkable progress by the railroads both in equipment and concepts in the handling of dry bulk. materials. While such shipments have always been an important part of the traf
Jan 1, 1971
-
Railroad Progress in the Transportation and Handling of Bulk Materials (ca5298f5-8531-46cd-9ca2-f247206dd780)In the last decade the railroads have been making tremendous strides in the development of services for the handling of bulk materials, the equipment for handling them, and the efficiency of handling,
Jan 1, 1973
-
Railroads In The 80?s ? A Stronger Link Between Mine And MarketsBy William M. Gray
[The products of mites hive historically beet a very large and important segment of total shipment transported by American Railroads. Much as the Mining transportation Executives right have wished for
Jan 1, 1985
-
Railway Electrification"The Butte, Anaconda & Pacific railway extends from Butte to Anaconda. The electrification comprises 30 miles of main line single track, and includes sidings, yard and smelter tracks. When complete th
Jan 1, 1913
-
Rainbow Falls Development"Coulter's Rainbow and Crooked Falls are situated about five miles below the City of Great Falls. Coulter's, the first of the series in the course of the river, is unimportant and has been submerged b
Jan 1, 1913
-
Rainbow Sub-Station"The 100,000 volt sub-station at Butte is located near the center of the district in which the power is distributed. The sub-station building is 150 feet by 50 feet in plan and 50 feet high. It is a b
Jan 1, 1913