Search Documents

  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017

  • ISEE
    Ring Blasting Mine to Mill Optimization

    By Joel Chipana, Roberto Laredo, Benjamin Cebrian

    Ring blasting is a common production method in underground metal mines. As a drill and blast process, it presents particular features that do not correspond with bench blasting in open pit or undergro

    Jan 1, 2017

  • CIM
    Ring Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) Techniques

    By Tom Shumka

    All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it is every six months or every three years. The inspection frequency depe

    Jan 1, 2012

  • SME
    Ring-Geared Mills Operated With Frequency Converter (Much More Than Just Variable Speed)

    By T. R. von Ow

    The method of powering mills such as AG, SAG and Ball has a long and technically interesting history. It can be said that almost every decade in the last half century had its own trend. The trends wer

    Jan 1, 2010

  • TMS
    Rinsing of Spent Precious Metal Ores for Heap Leach Decommissioning (ebb007d1-b59d-49d5-876a-726563afba5a)

    By P. G. Comba

    Many gold producing states are requiring rinsing of spent heaps to render the leached ore compatible with the environment and are placing restrictions on effluent pa, cyanide, and metals concentration

    Jan 1, 1992

  • NIOSH
    Rio Blanco Massive Hydraulic Fracturing Demonstration

    By Charles H. Atkinson

    The Rio Blanco massive hydraulic fracturing demonstration has been undertaken by the Bureau of Mines, Atomic Energy Commission, and a group of 15 industry participants. CER Geonuclear Corp. has been r

    Jan 1, 1975

  • SME
    Rio Piedras Project Completion: San Juan, Puerto Rico

    By Brian Fulcher, Matthew Bartlett, Jarrett E. Carlson

    This paper discusses the challenges to complete the construction of two large underground Metro stations and connecting tunnels in the Tren Urbano system. The completion work includes the installation

    Jan 1, 2003

  • AIME
    Rio Tinto Patino S. A. - Cerro Colorado Mine – Spain

    The Rio Tinto - Cerro Colorado operation was the first major cyanide plant built out of South Africa since the Carlin and Corte mills came on-stream in 1965 and 1969. Its flowsheet was presented in th

    Jan 1, 1981

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • CIM
    Ripping of Ores and Overburden

    By J E. Curfman

    This paper deals with using track-type and rubber-tired machines in the ripping and handling of overburden and ores. The techniques and proper attachments pertaining to the ripping of materials are co

    Jan 1, 1965

  • AIME
    Rise And Decline In Production Of Petroleum In Ohio And Indiana

    By J. A. Bownocker

    THE EXISTENCE of petroleum in the rocks of Ohio and Indiana seems to have been first shown by wells dug for salt. The fuel, however, was objectionable owing to its odor and inflammability. Not until t

    Jan 2, 1920

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • CIM
    Risk Adjusted Cash Flows: Discount Rates, Risk & Long Life Projects

    By L. D. Smith

    Net Present Value Impact of Discount Rate The Discounted Cash Flow (DCF) method of valuations is universally used and accepted. The main criticism of the method is that it does not recognize the val

    May 1, 2013

  • AUSIMM
    Risk Analysis and Decision-Making - A Case Study

    Solid EnergyÆs project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each level, sp

    Jan 1, 2007

  • SAIMM
    Risk Analysis And Decision-Making - A Case Study (f49695cb-00e4-4ae7-a065-8708230f1eaf)

    By B. Gamble

    Solid Energy's project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each leve

    Jan 1, 2007

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • IOM3
    Risk analysis design applications in mining geomechanics

    By R. J. Pine

    Procedures are described for the application of risk analysis or probabilistic methods to mining geomechanics. The methods are widely applicable to existing mine design models. Detailed examples are g

    Jan 12, 1992

  • SME
    Risk analysis for evaluation of mine impounded water

    By Michael Gobla

    "Since 1994 the Bureau of Reclamation (BOR) has used risk analysis to evaluate dams. Risk considers both the likelihood of failure and the expected consequences should failure occur. Risk analysis rel

    Dec 1, 2016