Search Documents

  • AIME
    Rock Dusting

    By H. P. Greenwald

    THE Committee on Rock-Dusting was formed after the fall meeting of the Coal Division in Chicago in 1938. Its primary task was to study the recommended American practice for rock- dusting coal mines to

    Jan 1, 1943

  • RMCMI
    Rock Dusting in the West

    By D. Harrington

    My acquaintance with rock, dusting as a preventive of wide spread explosions in coal mines dates from the fall of 1914 and the spring, summer and fall of 19.1.5 when I had an opportunity to observe th

    Jan 1, 1925

  • AIME
    Rock Dusting in West Virginia

    By Gordon MacVean

    THE adoption of rock dusting, as a safety measure, has made notable progress in the West Virginia coal mines since May, 1925. At that time there were but two mines in the State that were thoroughly ro

    Jan 1, 1926

  • SAIMM
    Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold Mine

    By D. F. Malan, Y. Jooste

    "SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac

    Jan 1, 2015

  • SME
    Rock Engineering Aspects of Designing Large Span Caverns at Depth in the Deep Underground Science and Engineering Laboratory

    By C. Laughton

    Construction of a Deep Underground Science and Engineering Laboratory(DUSEL) is proposed under the auspices of the US National Science Foundation(NSF). DUSEL will provide scientists and engineers with

    Jan 1, 2007

  • SAIMM
    Rock Engineering Challenges

    By A. H. Swart

    Rock engineering is concerned with the design of rock structures generated by mining activities. Therefore, rock engineering designs have major implications for the safe recovery of mineral deposits a

    Jan 1, 2005

  • CIM
    Rock Engineering Design and the Evolution of Eurocode 7: The Critical Six Years to 2020

    By A. Perucho, J. P. Harrison, A. Bedi, L. Alejano, L. Lamas, A. Sofianos, A. M. Ferrero, R. Migliazza, R. Olsson, J-F. Mathier

    "In 2010, the Eurocode for Geotechnical Design, EN-1997-1:2004 (CEN, 2004), informally known as Eurocode 7 or EC7, became the Reference Design Code (RDC) for geotechnical design – including rock engin

    Jan 1, 2015

  • AIME
    Rock Engineering For Tyee Lake Tap

    By John Cogan

    INTRODUCTION Lake tapping is a method of blasting an intake into a body of water from below the natural water surface without first lowering that surface or installing a protective cofferdam around

    Jan 1, 1984

  • SAIMM
    Rock Engineering Method To Pre-Evaluate Old, Small Coal Pillars For Secondary Mining ? Synopsis

    By J. N. Van der Merwe

    Due to the approaching depletion of reserves in the Witbank Coalfield, and the fact that the Waterberg Coalfield is as yet under developed, there is increasing pressure to extend the lives of the oper

    Jan 1, 2012

  • SAIMM
    Rock engineering, crucial for sustainable development in the South African mining industry

    By D. J. Adams, W. K. Rymon-Lipinski

    Rock engineering plays a crucial role in contributing to sustainable development in South African mining. A framework for this has been created through legislation and structures to encourage the mini

    Jan 1, 2003

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016

  • SME
    Rock Fall Control In Surface Mining With Cable & Ring Net Fences

    By C. O. Brawner, J. Kalejta II

    The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen

    Jan 1, 2002

  • CIM
    Rock fall in surface mining

    By C. O. Brawner, J. Kalejta II

    "The classical approach to control rock fall and ravel in open pit mining has been to use catch benches. The width and volume of benches is most dependent on the bench height, size of loading equipmen

    Jan 1, 2002

  • AUSIMM
    Rock fill consolidation for the extraction of sill pillar stopes at Toguraci gold mine

    By A Proudman, J Isles, R Lawolo, G Forster

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground

    Oct 16, 2017

  • SME-ICGCM
    Rock Fracture, Caving and Interaction of Face Supports Under Different Geological Environments. Experience from Australian Coal Mine

    By Winston Gale

    This paper is presents a summary of recent investigations into fracture and caving about longwall panels. The results of these investigations indicate that rock failure initiates well ahead of the lon

    Jan 1, 2004

  • SME
    Rock Fracturing Techniques For In Place Leaching

    By George B. Griswold

    The two most stringent parameters for in place fracturing of rock are the lack of any initial void space in the rock which to expand into and the ability to gain access only through drill holes. These

    Jan 1, 1969

  • CIM
    Rock fragmentation and the design of underground materials handling systems

    By G. D. Just

    "Extensive mechanization of underground mining operations, improvements in blasting technology and the development of simulation models for systems evaluation has now made it feasible to optimize rock

    Jan 1, 1980

  • ISEE
    Rock Fragmentation by Explosives: Myths and Realities

    By Wilfrid Comeau

    While researching for a theme lecture (Comeau, 1993l) on: 'The Mechanics and Physics Explosives', the author of Energy Transfer in Rock Fragmentaion by was confronted with many conflicting concepts re

    Jan 1, 1995

  • ISEE
    Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit Mine

    By Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez

    The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain

    Feb 1, 2020

  • ISEE
    Rock Fragmentation Prediction Using Machine Learning

    By Ankit Jha, RICHARD AMOAKO

    In this paper, we examine the challenges associated with the use of empirical rock fragmentation models. We highlight key parameters omitted by these models, and propose a machine learning approach th

    Feb 1, 2020