Search Documents

  • AUSIMM
    Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic Simulations

    By N Steenkamp, L Furstenberg, W Cele, M Richter

    Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t

    Jul 13, 2015

  • SME
    Capacity Increase By Coal Addition In Lamco J V's Pellet Plant

    By Stig Premfors

    Lamco Joint Venture is operating a Dravo Pelletizing machine to produce pellets from the natural slimes of an earthy hematite ore. The grate area of the machine 3.3 x 106 m equal to 350 m2 (3800 sq

    Jan 1, 1971

  • IMPC
    Capacity of an Acid-activated Somas Bentonite in the Bleaching of Soybean Oil

    By S. Sarioglan

    The bleaching of edible oils, industrial oils, and some chemicals may be achieved using natural and acid-activated clays. These materials remove impurities and pigments from the oils. In this work, a

    Jan 1, 2014

  • DFI
    Capacity Of Driven Piles In Sand

    By Mohab Sabry

    Pile foundations are used extensively around the world to support both inland and offshore structures, including important structures such as nuclear plants and oil drilling platforms. The limit of th

    Jan 1, 2006

  • DFI
    Capacity of Hydraulically Jacked Piles

    By Howard A. Perko, Melinda J. Hummel

    "Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co

    Jan 1, 2017

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • CIM
    Cape Breton Development Corporation - Victoria Junction coal preparation plant

    By J. G. Martin, J. C. Campbell

    THE VICTORIA JUNCTION 31,4-million-ton coal preparation complex went into operation in October 1976."' It is designed to produce a metallurgical coking coal by lowering the sulphur and ash content of

    Jan 1, 1985

  • CIM
    Cape Breton Development Corporation's experience with a tunnel-boring machine in coal measures

    By Dan Currie, Tom Lamb, J. Coady Marsh, Gary Landry

    "This paper describes the Cape Breton Development Corporation's experience with the Lovat M-300 tunnel-boring machine at the Donkin-Morien Mine. Between January 3 and December 21, 1984, the 7.6 m

    Jan 1, 1986

  • CIM
    Cape Breton Development Corporation: An overview

    By J. Kochhar, Robert G. Cooper

    "The Cape Breton Development Corporation is a federal Crown corporation which was formed in 1968. Initially, the Corporation had two divisions - the Industrial Development Division, whose purpose was

    Jan 1, 1990

  • AUSIMM
    Cape Lambert Port B Shiploading, Sampling and Analysis

    By M Graham, R Brunning, C Andringa-Bate, S Westergren

    In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por

    Jul 29, 2014

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • DFI
    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • AIME
    Capillarity - Permeability - Capillary Pressures - Their Measurement Using Mercury and the Calculation of Permeability Therefrom

    By W. R. Purcell

    An apparatus is described whereby capillary pressure curves for porous media may be determined by a technique that involves forcing mercury under pressure into the evacuated pores of solids. The data

    Jan 1, 1949

  • AIME
    Capillarity - Permeability - Capillary Pressures - Their Measurement Using Mercury and the Calculation of Permeability Therefrom

    By W. R. Purcell

    An apparatus is described whereby capillary pressure curves for porous media may be determined by a technique that involves forcing mercury under pressure into the evacuated pores of solids. The data

    Jan 1, 1949

  • AIME
    Capillarity - Permeability - Experiments on the Capillary Properties of Porous Solids

    By John C. Calhoun, R. C. Newman

    A report is made of experimental work performed on the capillary retention of water within porous solid systems, the displacement being accomplished with air and various organic liquids. A portion of

    Jan 1, 1949

  • AIME
    Capillarity - Permeability - Experiments on the Capillary Properties of Porous Solids

    By John C. Calhoun, R. C. Newman

    A report is made of experimental work performed on the capillary retention of water within porous solid systems, the displacement being accomplished with air and various organic liquids. A portion of

    Jan 1, 1949

  • AIME
    Capillarity - Permeability - Oil-Water Displacements in Microscopic Capillaries

    By C. C. Templeton, S. S. Rushing

    Methods previously developed for the study of air-liquid displacements in microscopic capillaries (inner diameters of 3 to 40 microns) have been used to investigate oil-water displacements in capillar

    Jan 1, 1957

  • AIME
    Capillarity – Permeability - A Laboratory Study of Gravity Segregation in Frontal Drives

    By T. M. Geffen, J. L. Sanderlin, F. F. Craig, D. W. Moore

    Scaled reservoir models have been used to study the effect of gravity on oil recovery performance in frontal-drive operations; namely, water, gas, or solvent flooding. The difference in density betwee

    Jan 1, 1958