Search Documents

  • SME
    Design Of Impoundment And Evaporation Ponds And Embankments For Cyanide And Other Toxic Effluents

    By George C. Toland

    Most existing impoundment ponds and dams leak effluent into the soil or rock upon which they are constructed. However, proposed environmental legislation will require very stringent control on the rel

    Jan 1, 1975

  • SME
    Design of Inclined Braceless Excavation Support with Inclined Buttress Applicable to Deep Excavation

    By Yoichi Shimada, Katsuyuki Nishida, Shinichi Takahashi, Yasushi Okada, Yohei Nakamichi, Kazunori Oshiro, Taichi Terui, Sigehiko Sugie

    "Temporary retaining walls are ordinarily used for tunnel construction work conducted using the opencut construction method. Retaining walls in such instances are typically installed vertically. Howev

    Jan 1, 2016

  • SME
    Design Of Initial And Final Support Of Pressure Tunnels In The Phoenix "SGC"

    By Timothy P. Smirnoff, Tracy K. Lundin

    INTRODUCTION The City of Phoenix, Arizona is located in the Phoenix Basin watershed which is prone to flash flooding several times each year. The runoff from these storms moves from the mountains i

    Jan 1, 1985

  • SME
    Design of Large and Shallow Caverns of New York Second Avenue Subway

    By Verya Nasri

    The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f

    Jan 1, 2008

  • SME
    Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c

    Jun 13, 2021

  • ISEE
    Design of Large-Scale Choked Destress Blasts in Mine Pillars Using the Empirical Destressability Index Methodology

    By Richard Brummer, John Hadjigeorgiou, Patrick Andrieux

    Some of the major challenges associated with underground mining at depth and/or under high extraction ratios are related to the resulting high stress levels, which can lead to the failure and collapse

    Jan 1, 2012

  • SAIMM
    Design of lining system for a pressure tunnel on the base of interaction between rock and lining

    By A. Kazemi, M. A. Ahmadi

    Pressure tunnels are constructed nurously in related with powerhouse. In some cases, according to high internal water pressure, rock mass around tunnel can seldom suffer this pressure. So installation

    Jan 1, 2003

  • AUSIMM
    Design Of Longhole Open Stoping At New Broken Hill Consolidated Limited With Particular Reference To Sloped Wall Mining

    The progress of longhole open stoping (LHOS) at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is described. The design of a novel sloped wall longhole stoping me

    Jan 1, 1983

  • SME
    Design Of Longwall Development Headings ? Introduction

    By D. S. Choi

    Underground production of coal by longwall methods has increased significantly in the last few years and will very likely continue to: increase. There are several reasons for this. First, as mining mo

    Jan 1, 1975

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • IOM3
    Design of longwall face support by use of neural network models

    By Jinsheng Chen, S. S. Peng

    The relationship between support performance parameters and parameters representative of mining and roof conditions is characterised by uncertainty, non-linearity and dependence, so the theory of arti

    Jun 21, 1905

  • SME
    Design of Lower Northwest Interceptor Tunnels Beneath the Sacramento River

    By Joel Nonnweiler, David Young, John Hawley

    The Sacramento Regional County Sanitation District has implemented a billion-dollar interceptor system master plan, including the 31 km (19 mile) long Lower Northwest Interceptor (LNWI). For the two L

    Jan 1, 2003

  • SME
    Design Of Materials Handling Facilities For A Lakeside Steel Plant ? Introduction

    By Rollin A. Slater

    The bulk materials handling industry has served silently for years as the skeleton structure and often the central system of nerves and nourishment for the body of basic production industries. During

    Jan 1, 1967

  • SAIMM
    Design of Merensky Reef Crush Pillars

    By B. P. Watson

    The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl

    Jan 1, 2010

  • IOM3
    Design of mills for developing countries

    By J. C. Loretto

    The philosophy and detail of mill design in developing countries, where it is frequently difficult to obtain experienced, qualified supervision to operate the plant, are discussed. The resulting desig

    Dec 1, 1971

  • AUSIMM
    Design of mine workings under surface waters in New South Wales

    By Laxaminarayan Holla

    Significant coal reserves in New South Wales lie underneath major bodies of natural and stored surface waters. In order that mining can occur safely and without any adverse effect on the surface, vari

    Jan 1, 1987

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME-ICGCM
    Design Of Multi-Level Thick Seam Extractions Under Major Aquifers And Considering Spontaneous Combustion Risk

    By D. J. Reddish

    An understanding of the mechanisms that cause large seismic events in a deep mine provides a foundation for designing effective measures to reduce the incidence of these events, as well as reduce the

    Jan 1, 1996

  • CIM
    Design of Multicomponent Alloys on the Base of Al-Ca Eutectics without Requirement for Quenching

    By T. K. Akopyan, E. A. Naumova, V. V. Doroshenko, N. A. Belov

    "A qualitative and quantitative analysis of the new Al-Ca-Mn-Fe phase diagram in the region of the aluminium corner is carried out using both thermodynamic calculations and experimental methods. Using

    Jan 1, 2018

  • SME
    Design Of NATM Tunnels And Stations Of Silver Line Phase III Project In Boston

    By Verya Nasri

    The Silver Line Phase III Project is the final one mile underground segment of the new Bus Rapid Transit in downtown Boston. The project is expected to significantly reduce existing and anticipated tr