Search Documents

  • IMMS
    Determination of Noble and Rare Metals in Underwater Ferromanganese Ores with the Use of Atomic Spectrometry Methods

    By I. V. Kubrakova, O. A. Tyutyunnik, M. L. Getsina, A. M. Asavin

    An analysis of noble metals (NM) in natural samples is most problematic. Determination of their traces in geochemical samples, in part, for the purpose of deposit evaluation, is a difficult analytica

  • AIME
    Determination Of Oil-Well Capacities From Liquid-Level Data

    By Charles C. Rodd

    PRIOR to 1938, proration procedure in Kansas required the physical testing of wells in order to set up a basis for allocating production. Subsequently the use of liquid-level data and bottom-hole pres

    Jan 1, 1942

  • SME
    Determination Of Open Pit Blast Sound Levels Using A Proxy Charge And Multiple Linear Regression - Introduction

    By K. E. Burgher

    Since World War II, the need for the use of explosives in construction, mining, and quarrying near congested urban areas has increased dramatically. Often times a coal mine, once isolated from a city,

    Jan 1, 1987

  • CIM
    Determination of Optimal Aggregate Blending with Linear Programming in Concrete Production

    By D. Adiguzel

    In this research, providing the sustainability of production quality was aimed for a quarry which is located in Istanbul western part of Turkey and producing concrete aggregates with different types o

    Aug 1, 2013

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • SAIMM
    Determination of Optimal Fragmentation Curves for a Surface Diamond Mine

    By K. M. Phamotse, A. S. Nhleko

    "*Paper written on project work carried out in partial fulfilment of BSc (Mining Engineering) degreeSynopsisLiqhobong Mining Development Company (LMDC) has been experiencing problems with boulders aft

    Jul 1, 2019

  • SME
    Determination Of Optimal Longwall Face Methane Monitoring Locations

    By Jeanne A. Zimmer, Andrew B. Cecala, Edward D. Thimons

    The Bureau of Mines performed a study to determine optimal locations for longwall face methane monitoring equipment. Longwall face ignitions continue to be a concern to the U. S. coal mining industry.

    Jan 1, 1993

  • SME
    Determination Of Optimal Longwall Face Methane Monitoring Locations

    By A. B. Cecala

    The US Bureau of Mines performed a study to determine optimal locations for longwall face methane monitoring equipment. Longwall face ignitions continue to be a concern to the US coal mining industry.

    Jan 1, 1995

  • SME
    Determination Of Optimal Longwall Face Methane Monitoring Locations (PREPRINT NUMBER 93-14 )

    By A. B. Cecala

    The Bureau of Mines performed a study to determine optimal locations for longwall face methane monitoring equipment. Longwall face ignitions continue to be a concern to the U.S. coal mining industry.

    Jan 1, 1993

  • IOM3
    Determination of optimum conditions for dissolution of ulexite in sulphuric acid solutions

    By S Colak, M Tunc, C Celik, M. M. Kocakerim

    The most important parameters affecting the solubility of ulexite (sodium calcium borate) in H2SO4 were found to be reaction temperature and solid:liquid ratio, in that order. Dissolution increased w

    Jun 21, 1905

  • SAIMM
    Determination Of Optimum Cutoff Grades Of Multiple Metal Deposits By Using The Golden Section Search Method

    In recent years several mine researchers have studied the optimization of cutoff grade with the purpose of maximizing Net Present Value (NPV). The best and most popular one is the Lane algorithm. Base

    Jan 1, 2003

  • SME
    Determination Of Optimum Iron Ore Mining Policy In Turkey By Using Analytical Network Process

    By M. Yavuz

    Due to workability difficulties, people have begun to use iron ore much later than gold, copper and bronze. In addition, iron and steel products are the most commonly used metals which are necessary f

    Jan 1, 2010

  • SME
    Determination of Optimum Mixture Ratios of Paste Backfill Materials for Disposal of Mineral Processing Tailings

    By S. Tuylu, D. Adiguzel, A. Bascetin, O. Ozdemir, U. Cinar

    "In recent years, use of mineral processing tailings as a paste backfill has been significantly increased due to the environmental problems occurred during the disposal of the tailings in mine area. T

    Jan 1, 2016

  • IMPC
    Determination of Optimum Operating Conditions for Washing Mixed Coals by Using Spreadsheet Optimization Method

    By S. Mohanta

    In composite washeries optimization of operating parameters to achieve maximum clean coal yield at the desired clean coal ash level is a major problem. This problem is more acute in countries like Ind

    Jan 1, 2014

  • AIME
    Determination of Oxygen in Alloy Steels and Its Effect upon Tube Piercing

    By Newell Hamilton

    SOME years ago, in the manufacture of seamless tubing from an alloy steel containing 0.07 per cent maximum carbon, 18 per cent chromium and 8 per cent nickel, at the plant of The Babcock & Wilcox Tube

    Jan 1, 1934

  • AIME
    Determination of Petrographic Components of Coal by Examination of Thin Sections

    By H. J. O’Donnell, B. C. Parks

    IN 1930 the late Dr. Reinhardt Thiessen set up a method of microscopic analysis and type classification of coal that has since been followed as standard practice in the coal-petrography laboratory of

    Jan 1, 1948

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • DFI
    Determination Of Pile Damage In Concrete Piles

    By Gerald E. H. Verbeek

    As the number of driven concrete piles with Embedded Data Collectors increases, it has become possible to compare the widely used Beta Method to assess pile damage (using the change of pile impedance)

    Jan 1, 2011

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Determination Of Pile Spring In Stratified Layers

    By Sandeep Pattnaik

    Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi

    Nov 1, 2022