Search Documents

  • AIME
    No Real Scarcity of Lead Likely

    By Francis H. Brownell

    During the 1920's lead consumption in the United States reached the highest average total ever known. For the ten-year period 1921-'30, it was slightly over 600,000 tons per year, or say 50,

    Jan 1, 1941

  • AIME
    No Startling Changes in Lead Metallurgy

    By Carle R. Hayward

    WHEN lead production began to recede from the peak productions of 1929 many plants took advantage of the curtailed operations to make necessary improvements and repairs about the plant. There followed

    Jan 1, 1935

  • AIME
    No Steel for 400 Civilian Articles

    By AIME AIME

    WHEN the War Production Board issued its order which will end the use of iron and steel in more than 400 familiar civilian articles, the list of those products formed a fascinating and homeric catalog

    Jan 1, 1942

  • IIMP
    No+Pb: Boyas descontaminadoras para lagos en zonas de influencia agrícola y ganadera basada en nanocompuestos de arena y grafito costo-eficiente, biodegradable y de fácil uso e instalación para la reducción de plomo y otros metales pesados

    By María Quintana, Roger Veramendi, Gerald Salazar, Clemente Luyo, Noe Cabanillas

    En este trabajo se presenta un sistema autónomo para remoción de plomo de efluentes mineros con monitoreo remoto, cuyo sistema opera a base de un novedoso material adsorbente, que se presenta en este

    Sep 20, 2019

  • TMS
    No-Inner Core Continuous Casting of Metal Pipe

    By Zhongming Ren

    "A new process of near net shape continuous casting of metal pipe has been put out. The specialty of the process is that no inner core is used. The principle of the process has been presented, and the

    Jan 1, 2000

  • DFI
    No. 1 Queens Road - Melbourne, Australia

    By Tom George

    "INTRODUCTIONNo. 1 Queens Rd was an existing 10-storey office building founded on large pad footings. This project involved the construction of a 6-level, 15m (50-ft.) deep basement excavated immediat

    Jan 1, 2005

  • AUSIMM
    No. 2 Open Hearth Plant at Port Kembla

    By Edmonds W, Jeffcoat R

    The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives

    Jan 1, 1957

  • CIM
    No. 2 Shaft Raise, Aunor Gold Mines, Ltd.

    By G. H. Montgomery

    THE PROPERTY of Aunor Gold Mines, Limited, consists of eleven claims, located in Deloro township, approximately three miles southeast of the town of Timmins. Production began in 1940 and currently the

    Jan 1, 1957

  • AUSIMM
    No. 3 Breaker Station and Mullock Bin

    When the new No. 3 Shaft is in full operation, the main hoisting duties will be in connection with the raising of: (a) ore from the various mining operations, and (b) mullock, or broken country rock,

    Jan 1, 1957

  • AUSIMM
    No. 3 Changehouse

    With the sinking of the No. 3 Shaft at North Broken Hill Limited, it was necessary to construct adjacent to the shaft a new changehouse for mining and surface personnel.It was also probable that as th

    Jan 1, 1957

  • AUSIMM
    No. 3 Headframe

    To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa

    Jan 1, 1957

  • AUSIMM
    No. 3 Shaft Sub-Brace Area

    With the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju

    Jan 1, 1957

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • TMS
    No. 3 Tankhouse at Onahama Smelter and Refinery

    By H. Ikeda

    The new Onahama N0.3 tankhouse was put into operation early in 1973. This new tankhouse, which has a capacity of 90,000 metric ton cathode per year, is distinct in many important respects from convent

    Jan 1, 1976

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AIME
    No. 4 I.S.F. Smelter Complex Of Imperial Smelting Corp., Ltd., Avonmouth, England

    By R. M. Sellwood

    The No. 4 I.S.F. Smelter Complex at the Avonmouth Works of Imperial Smelting Corporation (N.S.C.) Limited commenced operation at the beginning of 1968. The furnace rating is 120,000 tons zinc and 40,0

    Jan 1, 1970

  • SAIMM
    No. 5 Seam Mining At Kriel Colliery Opencast - Synopsis

    By M. D. Raganya

    The Kriel Colliery is an Anglo Coal mine which is contracted with Eskom to produce No. 4 seam for Kriel power station. The mine previously found it uneconomical to mine No. 5 seam due to the low quali

    Jan 1, 2011

  • CIM
    No. 6 Concentrator Operations at. Brunswick Mining and Smelting Corporation Limited

    By R. T. Erskine

    "The No. 6 orebody is located 6 miles from the main op.eration of Brunswick Mining and Smelting Corporation Limited and includes open-pit and primary gyratory crushing facilities. Ore is transferred b

    Jan 1, 1971

  • SME
    No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New Tunnels

    By Aram Grigoryan

    This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010