Search Documents

  • AUSIMM
    Rio Tinto Floating Module

    By N Vagias, R Shaw, M Coghill, W Easman

    Rio Tinto Technology and the Rio Tinto Foundation for a Sustainable Minerals Industry have funded the development of a practical floating module that can reduce water losses through evaporation from w

    Jan 1, 2006

  • AIME
    Rio Tinto Patino S. A. - Cerro Colorado Mine – Spain

    The Rio Tinto - Cerro Colorado operation was the first major cyanide plant built out of South Africa since the Carlin and Corte mills came on-stream in 1965 and 1969. Its flowsheet was presented in th

    Jan 1, 1981

  • SME
    Rio Tinto – Mineral Reserve Estimation in the Real World – A Large Company Perspective

    By Niall Weatherstone

    Introduction Risks & Rewards of a Mineral Reserve Life History of a Mineral Reserve Estimate Risk Assessment & Management Mineral Resource & Reserve Estimation Good Practice Mineral Resource & Re

    Jan 1, 2003

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • CIM
    Ripping of Ores and Overburden

    By J E. Curfman

    This paper deals with using track-type and rubber-tired machines in the ripping and handling of overburden and ores. The techniques and proper attachments pertaining to the ripping of materials are co

    Jan 1, 1965

  • AIME
    Ripping Rock -Techniques Depend On Conditions

    By D. V. Fites

    The ripper is not a new tool. In fact, it dates back as far as the Roman Empire. The Roman's ripper-mounted on wheels and shaped something like a plow-was pulled by oxen and was used to loosen th

    Jan 12, 1967

  • SME
    Ripping: Tools, Techniques, and Applications

    Introduction The art of ripping has been around since the Romans built the Appian Way, but only in the last decade has ripping emerged as a close competitor with drilling and blasting in breaking up

    Jan 1, 1983

  • AIME
    Risdon, Site of Electrolytic Zinc Refinery

    Prior to World War I, zinc was universally made by the distillation process. Small plants were operated at Cockle Creek, N.S.W., and Port Pirie, S.A. Then the electrolytic process was developed at Gre

    Jan 10, 1964

  • AIME
    Rise And Decline In Production Of Petroleum In Ohio And Indiana

    By J. A. Bownocker

    THE EXISTENCE of petroleum in the rocks of Ohio and Indiana seems to have been first shown by wells dug for salt. The fuel, however, was objectionable owing to its odor and inflammability. Not until t

    Jan 2, 1920

  • AUSIMM
    Rise and Pillar Rill Stoping at Golden Crown Mine

    By Rogers M, Sullivan B

    Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15

    Jan 1, 1993

  • AUSIMM
    Risk "Thinking" for Australian Tunnelling

    A paper presenting an overview of legislative and best practice approaches to the management of OHS&E and business risk for Australian tunnelling operations. Best practice can be achieved in

    Jan 1, 2008

  • CIM
    Risk Adjusted Cash Flows: Discount Rates, Risk & Long Life Projects

    By L. D. Smith

    Net Present Value Impact of Discount Rate The Discounted Cash Flow (DCF) method of valuations is universally used and accepted. The main criticism of the method is that it does not recognize the val

    May 1, 2013

  • AUSIMM
    Risk Analysis and Decision-Making - A Case Study

    Solid EnergyÆs project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each level, sp

    Jan 1, 2007

  • SAIMM
    Risk Analysis And Decision-Making - A Case Study (f49695cb-00e4-4ae7-a065-8708230f1eaf)

    By B. Gamble

    Solid Energy's project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each leve

    Jan 1, 2007

  • SME
    Risk Analysis And Probabilistic Modeling In Geotechnical Engineering

    By M. Kavvadas

    Geotechnical design using Factors of Safety recommended by Codes of Practice is based on largely unknown ?margins of safety?, usually without consideration for the importance of the project (i.e., pot

    Jan 1, 2005

  • SME-ICGCM
    Risk Analysis and Risk Ranking in Tunneling: A Case Study

    By Behdeen Oraee

    Constructing tunnels underground is generally described as a high-risk activity because conditions in the surrounding area tend to be unpredictable. This would and can create unique dangers in every s

    Jan 1, 2014

  • AUSIMM
    Risk Analysis and Uncertainty in Open Pit Mine Design

    This paper examines the concepts of risk analysis and uncertainty in open pit mine design. It describes the relationship between risk analysis and uncertainty, describes methods that can be used to

    Jan 1, 1994

  • IOM3
    Risk analysis design applications in mining geomechanics

    By R. J. Pine

    Procedures are described for the application of risk analysis or probabilistic methods to mining geomechanics. The methods are widely applicable to existing mine design models. Detailed examples are g

    Jan 12, 1992

  • AIME
    Risk Analysis For Agglomeration And Other Pyrometallurgical Processes And Facilities

    By M. J. Greaves

    All available data concerning risk as it applies to scaling up pyrometallurgical plants, processes, and equipment are determined to estimate the statistical chance of success. Random numbers are assig

    Jan 1, 1977