Search Documents

  • TMS
    Short Term Forecast Of Metal Prices: Commercial Application For Operation On Forwards And Optimization The Hedging

    By Boris Arlyuk

    The system of short term forecast of metal prices at LME is based on correlation between prices within the quarter forward and at the first place by economic parameters at the West, determining the co

    Jan 1, 2006

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • SME
    Short term mine planning and grade control practice at the Mesquite mine

    By P. Brumit, L. Grady, R. Mitts, V. Holm

    The Mesquite mine is a large, open pit, heap leach gold mine owned and operated by Gold Fields Operating Co.-Mesquite. The mine uses a fully integrated mine planning and reserve modeling software syst

    Jan 1, 1991

  • SME
    Short Term Mine Planning And Grade Control Practice At The Mesquite Mine (b9fe8c31-659a-4850-a163-7cd7260c5540)

    The Mesquite mine is being operated by Gold Fields Operating Co.-Mesquite, a subsidiary of Gold Fields Mining Corp. The mine Is located in southeastern California about 56 km (35 miles) east of the fa

    Jan 1, 1989

  • SME
    Short Term Planning For Mining A Longwall Panel: An Application Of Geostatistics For Quality Control

    By R. W. Barbaro

    The limitation of sulfur dioxide in power plant emissions dictates that sulfur in coal be reduced to the lowest possible level before combustion so as not to aggravate the emission control problem at

    Jan 1, 1988

  • SME
    Short Term, Photoelastic, Roof Bolt Load Cell

    By Kenneth S. Graham, S. C. Gambrell

    A short term, simple roof bolt load cell which uses a birefringent (photoelastic) coating as its sensing element has been developed. The load cell is installed between the bearing plate and the nut/wa

    Jan 1, 1992

  • SME
    Short Tunnels = HIGH Risk?: Pipeline Construction Involving Open-Cut And Tunnel Segments

    By Michael Gilbert

    In the world of tunneling the glamour is in the large diameter, long tunnels, but perhaps the number of projects for small diameter and short length tunnels are greater and generally have higher risk

  • SME
    Short Tunnels with Shallow Cover

    By David Smith

    Construction of a new transportation link frequently requires crossing under an existing highway or railroad. Although traffic diversions may permit a cut and cover structure to be built, ‘zero impact

    Jan 1, 2005

  • SAIMM
    Short- and medium-term planning of underground mining operations APCOM 2021

    By S. V. Lukichev, O. V. Nagovitsyn, V. V. Laptev

    In this paper the authors describe the developed algorithms of short- and medium-term planning of underground mining operations. The algorithms were developed using the example of the flat-back cut-an

    Sep 1, 2021

  • SME
    Short-Delay Blasting At Anaconda's Berkeley Open-Pit Mine, Montana

    By Lewis L. Oriard

    The authors outline the development and application of blasting methods put into use 11 years ago at the Berkeley Open-Pit Mine, Butte, Montana. The blast design uses a very short delay (5 millisecond

    Jan 1, 1980

  • NIOSH
    Short-Encapsulation Pull Tests For Roof Bolt Evaluation At An Operating Coal Mine

    By Stephen C. Tadolini, Steve Bessinger, James Pile, Christopher Mark

    The San Juan Coal Mine, located near Farmington, New Mexico, supplies the San Juan Generating Station with more than 6 million tons of coal annually. To replace dwindling surface mine production, San

  • SME-ICGCM
    Short-encapsulation Pull Tests for Roof Bolt Evaluation at an Operating Coal Mine (d859e8fa-c0f1-49be-9743-84926e16279e)

    By James Pile

    The San Juan Coal Mine, located near Farmington, New Mexico, supplies the San Juan Generating Station with more than 6 million tons of coal annually. To replace dwindling surface mine production, San

    Jan 1, 2003

  • SME
    Short-Haul Opportunities For Moving Minerals By Rail ? Summary

    By B. M. Flohr

    Railroads are cost competitive with trucks for hauls greater than 500 miles - WRONG. Today I will tell you about many rail movements of less than 100 miles throughout the country. Rail is a short haul

    Jan 1, 1986

  • SME
    Short-Range Planning: From Scheduling to Sequencing

    By J. Schleifer

    On short term, planning techniques require more details to ensure feasibility, giving importance to operation constraints and use of available resources. In GUEMASSA (Morocco), the ore mass is min

    Jan 1, 1996

  • AIME
    Short-Rod Grinding In Ball Mills

    By H. R. Stahi

    THE ore of the Southeast Missouri lead district consists essentially of galena in dolomitic limestone. The galena usually is in a very finely disseminated condition. The experience of recent years in

    Jan 1, 1945

  • SAIMM
    Short-term gain for long-term pain how focusing on tactical issues can destroy long-term value - Synopsis

    By B.E. Hall

    Maximizing shareholder value has become a common aim for mining companies. This paper discusses the results of a number of studies developing strategic mine plans, covering a wide range of commodities

    Jan 1, 2009

  • NIOSH
    Short-Term Gravimetric Sampling Helps Isolate Dust Sources - Objective

    To pinpoint dust sources and to improve dust control on longwalls. Approach Use short-term gravimetric sampling to determine the severity of various dust sources, and to evaluate dust control te

    Jan 1, 1982

  • SME
    Short-Term Mine Production Scheduling For Industrial Minerals Using Multi-Objective Simulated Annealing

    By M. Kumral

    The in-situ mineral characteristics of a deposit are simulated by sequential co-simulation and averaging the simulated characteristics within specified block volumes creates a three-dimensional block

    Jan 1, 2002

  • SME
    Short-Term Planning In Sublevel Stoping Methods - Introduction

    By Fernando Muge

    A complex pyrite orebody located in the South of Portugal (MO INHO) was exploited in the past by cut and fill methods until a certain level. It was decided to design a new plant for non ferrous met

    Jan 1, 1979

  • SME
    SHORT-TERM PLANNING OF OPEN PIT MINES WITH SEMI-MOBILE IN-PIT CRUSHER - SME Annual Meeting 2023

    By E. Ben-Awuah, H. Askari-Nasab, N. Al Habib

    Open pit mines are getting deeper with time and transportation expenses are increasing because of the increasing haulage distance. In-pit crushing and conveying (IPCC) is getting popular in deeper ope

    Feb 1, 2023