Search Documents

Sort by

  • SME
    Improved Belt Loading And The Effect On Face Production Through Moderation Of Sectional Feeder Discharge Rates (51a24299-8227-404e-b9a0-642d104f66d1)

    By T. H. Combs

    Increased productivity in the U.S. underground coal industry has taxed pre-existing conveyor belt haulage systems. The usual remedies are costly and can disrupt production. A reduction in the belt fee

    Jan 1, 1993

  • ISEE
    Improved Blast Results with Variable Density, Gassed Emulsions

    By L D. Lawrence, R S. Day, Gordon Coleman

    Commercial emulsion explosives are typically characterized by their relatively high detonation velocities due to the intimacy of oxidizer and fuel and to their sensitization with glass microballoons.

    Jan 1, 1990

  • SME
    Improved Canopy Air Curtain Dust Protection Using A Novel Design Combining The Impinging Jet And A Two-level Manifold - SME Annual Meeting 2022

    By G. Xu, A. R. Kumar, N. A. Amoah

    Prolonged exposure to high concentrations of respirable coal mine dust causes coal workers’ pneumoconiosis and silicosis. Underground coal mine roof bolter operators are more prone to elevated exposur

    Mar 2, 2022

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • SME
    Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022

    By Jacob Grasmick, Bill Newns

    Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel

    Dec 1, 2022

  • SAIMM
    Improved Control of Phosphate Flotation by means of a Simple Mineralogical Regression Model

    By J. L. Gaigher

    A simple mineralogical regression model is described, which was devised in order to help the flotation plant cope with rapidly changing headgrades and feed mineralogy. Minerals in the feed were dete

    Jan 1, 1987

  • TMS
    Improved Copper Smelter and Converter Productivity Through the Use of a Novel High-Grade Feed

    By Eugene Jak

    Copper sulphide processing technologies face increasing pressures associated with decreasing concentrate grade leading to increasing thermal inefficiency and lower productivity. Impurity concentration

  • SAIMM
    Improved Copper/Iron Selectivity in Solvent Extraction

    By J. J. Taute, G. Chisakuta, P. Bwando, G. Mitshabu

    "BASF Mining Solutions have developed a new generation of copper solvent-extraction reagents that offer significant benefits over the existing reagents available to the industry today. Initial laborat

    Jan 1, 2015

  • TMS
    Improved CX Process for Spent Lead Acid Batteries Treatment

    By Tullio Corsini

    Scrap battery recovery process, developed by Engitec Impianti S.p.A., is improved transforming batches operations in continuous. Benefits expected: constant and better quality of the products; easie

    Jan 1, 1993

  • CIM
    Improved Defect Control and Mechanical Property Variation in High Pressure Die Casting (HPDC) of A380 Alloy by High Shear Melt Conditioning

    By J. L. Nebreda, Z. Fan, J. B. Patel

    "A380 alloy has been widely employed to produce thin-wall components via high pressure die casting (HPDC). During HPDC processing, there is a significant problem of property variation even with the ve

    Jan 1, 2018

  • SME
    Improved Dewatering Of Coal By Steam Filtration - Part I

    By C. E. Silverblatt

    The advent of larger quantities of -1/4 inch coal in the raw feed to the preparation plant and the necessity of recovering this material has made the problem of meeting product moisture specifications

    Jan 1, 1964

  • DFI
    Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study

    By Carl-Oscar Nilsson, Åke B. Nilsson

    "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the

    Jan 1, 2016

  • SME
    Improved Drill and Blast Designs Free $3.6m of Ore for Surface Copper Mine - SME Annual Meeting 2025

    By Liz Diaz, Tacio Ferreira

    Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent

    Feb 1, 2025

  • ISEE
    Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno Nobel

    By Tacio Ferreira

    A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla

    Jan 21, 2025

  • AIME
    Improved Drill Shop Equipment at Morenci Branch of Phelps Dodge Corporation

    By AIME AIME

    AT the Morenci branch of the Phelps Dodge Corporation, of which Frank Ayer is manager, several new types of machines that have been developed by Charles Mitchell, shop foreman in the drill steel shop,

    Jan 1, 1930

  • SME
    Improved drill shroud capture of respirable dust utilizing air nozzles underneath the drill deck - SME Transactions 2009

    By W. R. Reed, J. D. Potts

    This study tests the ability of a new air nozzle system, located under the drill deck shroud, to improve the dust capture of the drill deck shroud. The system consists of three air nozzles supplied wi

    Jan 1, 2009

  • SME
    Improved drill-and-blast designs free $3.6 million of ore for surface copper mine - ME Feature Article

    By Tácio Ferreira, Liz Diaz

    Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent

    Aug 1, 2025

  • SME
    Improved Drilling Accuracy Results In Reduced Ore Dilution at Evolution, Cracow (a2d917f6-13bc-4cac-8758-bced53c996a6)

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019

  • SME
    Improved Drilling Controls Through Forecasting - SME Annual Meeting 2024

    By Karl Ingmarsson

    Larger mines spend millions of dollars annually on rock drilling tools, but often purchase based on historic consumption. The results vary from excess inventory to acute tools shortages. These lead to

    Feb 1, 2024