Search Documents

Sort by

  • AUSIMM
    Installation And Design Guidelines For Cable Dowel Ground Support At ZC/NBHC

    By Askew J. E

    All facets of current practices of cable dowelling at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited are re- viewed. This includes materials specific- ations, installation pra

    Jan 1, 1977

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • ABM
    Installation And Operational Result Of Lindarctm Real Time Laser Off-gas Analysis System At Acciaierie Bertoli Safau - Abs (Italy) Electric Arc Furnace

    By Daniele Tolazzi

    In today’s highly competitive market situation, it is of outmost importance for EAF steel makers to optimise their processes in order to reduce operating costs and to improve safety and reliability of

    Aug 16, 2017

  • SME
    Installation and Preliminary Results of a Novel Fiber Optic Distributed Strain Monitoring System in an Active Underground Room and Pillar Metal Mine

    By Taghi Sherizadeh, Paul Brooks, Dogukan Guner, Samuel Nowak

    Large excavations are well known to result in rock mass deformations which can present challenging situations for mine personnel. Most of the currently available ground movement monitoring devices fai

  • SME
    Installation Of 0.84 M (33 In) Cyclones On The Primary Grinding Circuit At Cyprus Sierrita Corporation

    By L. N. Hill

    The classifiers on the primary grinding circuit at Cyprus Sierrita have been upgraded from 0.66 m (26 in) diameter hydrocyclones to 0.84 m (33 in) diameter hydrocyclones. This has resulted in a 4.3 %

    Jan 1, 1994

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • ABM
    Installation Of A 350 T Bof Converter At Arcelormittal Poland

    By Günther Staudinger

    Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describe

    Jul 29, 2018

  • ABM
    Installation Of A New 80 T Mrp-l Converter At Aperam Timoteo

    By Günther Staudinge

    Aperam is a global player in producing of stainless, electrical and special steel qualities. The steelmaking plant in Timoteo Brasil is equipped with one AODconverter for stainless steel and one MRPL-

    Aug 17, 2017

  • SME
    Installation Of A New Surface Fan At The Homestake Gold Mine ? Introduction

    By Greg Struble

    The Homestake Gold Mine is one of the deepest and most extensively developed hardrock mines in North America. The mine is divided into five divisions which produce a total of 1.7 million metric tons o

    Jan 1, 1987

  • SME
    Installation Of A Supervisory Control System At A Gold Pressure Oxidation Plant (edba5c85-6442-4bfd-bdfb-2b55fb328e40)

    By M. Spangler

    FirstMiss Gold installed a supervisory control system based on Pavilion Technology's Process Insights neural network software and Oil System's PI data historian. The primary goal of the syst

    Jan 1, 1995

  • CIM
    Installation of Flash Flotation Units at the Louvicourt Concentrator

    By Bernard Dallaire, Jean Cayouette, Sylvain Duchesne

    "Louvicourt Mine's concentrator, located near Val d'Or, Quebec, treats an average of 4,300 tonnes of ore per day composed mainly of copper, zinc, gold and silver. An analysis of concentrator revenues

    Jan 1, 2001

  • SME
    Installation of Paste Backfill Technologies in a High Rock Temperature and Hard Rock Mine, Toyoha, Japan

    By Jiro Yamatomi, Susumu Takemura, Osam Sakai, Hiroshi Shimotori, Yoshio Otsuka

    The Toyoha Mine is operated under extremely high rock temperature. The geothermal heat is 10 to 20 times more active than the average of the Japanese Islands. The highest temperature ever observed in

    Jan 1, 2001

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • CIM
    Installation of Shaft Bottom Steel Prior to Shaft Sinking

    By D. M. Ziebarth

    "Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott

    Jan 1, 2019

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022

  • DFI
    Installation Parameters, Pile Performance and Importance of Testing

    By Maurice Bottiau

    "Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co

    Jan 1, 2014

  • NIOSH
    Installation Techniques - 6.1 The Basic Philosophy

    The investment involved in any communication system represents a considerable sum. Even though it is desirable that the system work properly each and every time it is called into use, some failures ar

    Jan 1, 1984

  • SME
    Installation, Operation And Maintenance Problems With Large Vibrating Screens In Mineral Processing Applications

    By J. W. Scott

    The problems involved in installing, maintaining, and operating large vibrating screens have been summarized and discussed, based on a survey of current use of such screens in selected North American

    Jan 1, 1983

  • DFI
    Installing And Testing Multi-bar High Capacity Rock Tiedowns

    By Andrew Pontecorvo, Steven Lowe, David Sposito

    Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a

  • SME
    Instantaneous Access To Maintenance Data

    By R. Gilges

    The implementation of effective techniques for meeting the maintenance requirements of the new Utah Copper Division smelter, one of the largest in the Western Hemisphere, is a goal of the smelter mana

    Jan 1, 1977