Search Documents

Sort by

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AIME
    James Aston Robert W. Hunt Medalist for 1930

    By James Aston

    INDICATIVE of the practical importance of the achievement of James Aston , recipient of the Robert W. Hunt Medal for 1930, is the following prosaic item from the financial columns of a recent issue of

    Jan 1, 1930

  • AIME
    James Douglas

    By Robert Glass Cleland

    THE CONNECTING link between Phelps Dodge and the copper mines at Bisbee and Morenci was a Canadian-born mining engineer and metallurgist named James Douglas. Judged by almost any standard, Douglas was

    Jan 1, 1952

  • AIME
    James Terry Duce, New A.I.M.E. Director

    By AIME AIME

    JAMES TERRY DUCE is still on the sunny side of fifty, having been born on Dec. 30, 1892 in Worcester, England. Early in life he came to the United States, however, and graduated from the University of

    Jan 1, 1941

  • CIM
    Jameson Cell: The “Comeback” in Base Metals Applications Using Improved Design and Flow Sheets

    By K. E. Barnes

    "The “Jameson Cell” flotation cell was developed at Mount Isa Mines in the late 1980’s to address deficiencies in our flotation column installations. Early base metal installations had a variable reco

    Jan 1, 2006

  • AIME
    Japan's Heavy Dependence On Foreign Mineral Resources And Some Of Its Future Problems

    By Chikao Nishiwaki

    INTRODUCTION The Japanese dependency for mineral raw materials from foreign sources increased rapidly within the 20 years since the Korean war. During this 20 year period Japan has attempted to in

    Jan 1, 1976

  • AIME
    Japan's Mineral Industry

    By John J. Collins

    The plight of the Japanese mining business is pitiful. Coal mines were given the highest priority for all materials they needed, yet between the end of the war and June 1948, the government was oblige

    Jan 1, 1949

  • AIME
    Jargon (1d9c6a2a-cd98-4329-9893-840d8767b22f)

    By T. A. Rickard

    The dictionary defines 'jargon' as "barbarous or debased language". This description does not suffice. Quiller-Couch has said, it is "a kind of writing which, from a superficial likeness, co

    Jan 1, 1931

  • TMS
    Jarosite Precipitation from Iron - Nickel - Cobalt Sulfate Solutions

    By P. Maraboutis

    Iron removal by precipitation as jarosite from Fe-Ni-Co sulfate solutions, (synthetic or real, resulting from laterites leaching) has been investigated. Precipitation was carried out at 95 C, and at a

    Jan 1, 1988

  • TMS
    Jarosite Precipitation in Zinc Hydrometallurgy

    By F. Elgersma

    A high purity electrolysis solution is essential for hydrometallurgical zinc winning processes. For this reason ferric iron containing compounds such as jarosite are precipitated as iron and impurity

    Jan 1, 1990

  • TMS
    Jarosite Stabilization with Zinc Silicate Ore

    By Satian Niltawach

    Iron sulphate jarosite through which iron in zinc sulphide concentrate feed is removed from the production circuit of conventional roast-leach-electrowin process, is chemically unstable and environmen

    Jan 1, 1994

  • AIME
    Jaw Crusher Capacities (Blake Type)

    By Gieskieng, D. H.

    Published tables of jaw crusher capacities are compiled for the most part from field performance data, interspersed with interpolations, extrapolations, various safety factors, and other modifications

    Jan 1, 1949

  • DFI
    Jet Grout Underpinning of Sensitive Structures in Urban Environments

    By Alexander Ciccone, John H. Gill

    Jet grouting is a highly versatile ground modification technique that can offer significant commercial and technical advantages over traditional concrete pit underpinning applications. Despite these a

    Jan 1, 2019

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    Jet Grouting For Deep Excavation Support For Re-Entrant Corners

    By Chu E. Ho

    This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew

    May 1, 2022

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • ABM
    Jet Penetration In Slag And Metal Into Bof Cold Model

    By Breno Totti Maia

    In the present paper, a new energy balance equation was developed, considering the slag phase, in order to define the effects of jet penetration and determine a new value for the factor K. The factor

    Aug 17, 2017

  • AIME
    Jet Piercing

    By H. C. Rolseth, J. J. Calaman

    6.4-1. Principles of Operation. The jet-piercing process is a patented thermal process which depends upon a characteristic of the rock which is termed spallability. In its simplest terms, spalling is

    Jan 1, 1968

  • TMS
    Jet Vapor Deposited Aluminum-Aluminum Oxide Nanolaminates

    By D. T. Smith, L. M. Hsiung, J. J. Schmitt, J. W. Golz, R. L. Lankey, H. N. G. Wadley, J. Z. Zhang, B. L. Halpern

    "The microstructure and mechanical properties of Al/AI2O 3 metal-oxide nanolaminates fabricated by' a novel Jet Vapor Deposition (JVD) process at substrate temperatures of ~25° and -250°C have been in

    Jan 1, 1994

  • DFI
    JFKIA - Post Grouted Drilled Shafts And Driven Piles - Update - Synopsis

    By Walter G. Brusey

    This paper describes a comprehensive pile test program conducted at John F. Kennedy International Airport (JFKIA) to evaluate pile types and design capacities ranging from 890 to 4450 KN (100 to 500 t

    Jan 1, 2000