Search Documents

Sort by

  • SME
    Magnex Pilot Plant Evaluation -A Dry Chemical Process For The Removal Of Pyrite And Ash From Coal

    By Clifford R. Porter

    A 200 pound per hour Magnex Pilot Plant was designed and constructed. A non-compliance Eastern Coal which would generate more than 2.0 lb of SOZ per million Btu upon burning was brought into complianc

    Jan 1, 1977

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • SME
    Magstream® As A Heavy Liquid Separation Alternative For Mineral Sands Exploration

    By J. A. Domenico

    A safe and precise mineral separation alternative to heavy liquids is being used for mineral sands exploration on large scale orebodies. The separation process, Magstream®, uses ferro-fluids and magne

    Jan 1, 1994

  • AUSIMM
    Main Events in the History of Mineral and Energy Resource Development in New Zealand

    By A B. Christie, R L. Brathwaite

    Since the first occupation of New Zealand in 800 - 900 AD, various useful minerals, rocks, and energy resources have been identified and extracted. The Maori prized greenstone for ornaments, tool

    Jan 1, 1993

  • NIOSH
    Maintainability Design Checklist

    The following is a Maintainability Design Checklist for coal mining equipment. The purpose of the checklist is to provide a summary of design review points for the maintainability assessment of new or

    Jan 1, 2000

  • NIOSH
    Maintainability Design Checklist (f5b2eeed-9ba2-4ab7-8fe5-b6b7ade62960)

    The following is a Maintainability Design Checklist for coal mining equipment. The purpose of the checklist is to provide a summary of design review points for the maintainability assessment of new o

    Jan 1, 2000

  • SME
    Maintaining A Healthy Environment For The Mining Machinery In An Automated Underground Metal Mine

    By S. Hardcastle

    Tele-remote operation of production equipment from surface will change the design criteria for underground mines. And for ventilation, with machine operators on surface, conventional planning to dilut

    Jan 1, 2001

  • SME
    Maintaining a Stability Safety Case in Seismically Active Mines - RASIM 2022

    By David Beck

    In Australia, Safe Work legislation requires mines to have a documented ‘Safety Case’ explaining how a mine will safely manage all major hazards. A similar requirement is legislated or inferred by reg

    Apr 26, 2022

  • AUSIMM
    Maintaining and Improving the Economics of Open Pit Mining

    Maintaining and improving the economics of open pit mining in the future requires understanding of the characteristics of open pit mining that are different to other mining or business activities, des

    Jan 1, 1992

  • CIM
    Maintaining Grinding Efficiency and Mill Throughput When Liners Wear

    By O. Mejia

    "As study was undertaken to investigate the relationship between mill liner wear and grinding energy efficiency and to assess the opportunity to control mill speed to improve energy performance as mil

    Jan 1, 2019

  • SME
    Maintaining Ring Gears in Ball Mills

    By David Kress

    Mill crushing drive systems are essential to cement producers. With the increased emphasis on operating efficiency, it is vital that these systems be dependable and reliable. No one needs the costs

    Jan 1, 2000

  • AUSIMM
    Maintaining Sample Data Quality Through Robust Quality Assurance and Quality Control Protocols

    Successful evaluation and exploitation of resources and reserves relies on the collection of high quality sample data. The quality of the sample data must be maintained through the application of a ro

    Mar 1, 2010

  • SME
    Maintaining The Proper Balance With Computer Aided Gear Train Design

    By John Carr

    The tremendous growth in grinding mill size and horsepower during the '70s demanded advancements in gear cutting technology and equipment for the '80s. Computers are used as an aid in the

    Jan 1, 1981

  • CIM
    Maintaining the reliability of a plant electrical system

    By A. P. Williams

    "This paper presents an overview of plant electrical systems in general, a discussion of the problems that may occur due to plant growth, the maintenance required to maintain the reliability and safet

    Jan 1, 1987

  • AUSIMM
    Maintenace Of Diesel Equipment Underground

    The successful operation of diesel equipment underground does not entirely depend on selection of robust, reliable, easily maintained machines. Results are also heavily influenced by the following

    Jan 1, 1977

  • CIM
    Maintenance

    By Peter C. Jones

    The paper gives a broad view of the maintenance procedures at the Cassiar Asbestos Corporation property. Comparisons are drawn to indicate the changes in facilities and approach that have evolved over

    Jan 1, 1978

  • CIM
    Maintenance and Testing of Protective Devices

    By W. E. Lockley

    This paper will attempt to answer a number of questions which are important to the safe and continued operation of an electric power system. 1. WHY should electrical protective devices be tested? 2.

    Jan 1, 1977

  • AUSIMM
    Maintenance Aspects of Off Highway Trucks - A Case Study

    Engineering availability of the 120/200 tonne Wabco haulpak fleet at Mt. Whaleback was in the mid fifties and unstable. The project to achieve a reliable 66% during 1980 highlighted "plannable" mai

    Jan 1, 1982

  • SME
    Maintenance Control ? A Four Level Approach - Who's Right?

    By Mark L. Munsell

    In recent years, miners have tried many approaches to maintenance such as: - Highly sophisticated computerized programs. - large planning groups designed to preplan and schedule work. - Contract

    Jan 1, 1976

  • CIM
    Maintenance Control at Algoma's Macleod Mine

    By C. A. Campbell

    "There has been a significant reduction in maintenance hours and improved performance by maintenance crews at the MacLeod mine since the introduction of a Maintenance Control system which includes the

    Jan 1, 1973