Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of Mill Feed by LIF-Techniques (cbc3fba8-2d89-4297-b837-793bda5fb340)By Heribert F. Broicher, Arne Volland
The application of remote sensing techniques combined with fluorescence spectroscopy is realised in analytical devices called LIF Analysers. The analysis of laser-induced fluorescence facilitates non-
Jan 1, 2003
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of CyanicidesBy B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon
Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The
Sep 26, 2013
-
Optimisation of Overburden Blasting Mount Thorley CollieryBy Mckenzie CK, Scott A
The injection of coal as an auxiliary fuel in ironmaking blast furnaces has been introduced on many furnaces worldwide. This paper examines the present practice of coal injection and discusses fut
Jan 1, 1987
-
Optimisation of Pellet Reduction in a Phosphorus FurnaceBy C. Dresen
This paper discussed the reaction kinetics of the reduction of industrial phosphate pellets for P4 production. In the reduction process of various phosphate ores, the following parameters were investi
Jan 1, 2002
-
Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, IndiaBy S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao
"Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium
Jan 1, 2016
-
Optimisation of Sampling Procedures at the Fimiston Open Pit, KalgoorlieBy Chapman G. J
Mining operations require detailed and precise methods and procedures for the optimum selection of ore from waste. A fundamental procedure applied to achieve this selection is accurate sampling. The k
Jan 1, 1993
-
Optimisation Of SiMn Production At TransalloysBy J. Griesel, P. H. F. Bouwer, K. Bisaka
Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon
Jan 1, 2004
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
Optimisation of surface tailings storage and tailings backfill – a case studyBy B P. Wrench, N R. Steward, C Wu
A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi
Jul 23, 2018
-
Optimisation Of The Ball Mill Circuit Using A Simulator In Conjunction With Measurements From A Non-Intrusive SensorThe ball level and pulp load play a key role in the operation of industrial scale ball mills. These two operating variables have a significant influence on the performance of the ball mill and any att
Sep 1, 2012
-
Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional SimulationBy J Bower
The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t
Jan 1, 2009
-
Optimisation of the Leach Conditions for a Copper/Uranium OreBy S. J. Macnaughton
The Olympic Dam deposit in South Australia contains 2% copper and 0.06% uranium, which are present as bomite, chalcocite, chalcopyrite, uraninite, coffinite and brannerite. The copper is principally r
Jan 1, 1999
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Optimisation of the Prominent Hill SAG MillBy Mark Weidenbach
OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a
Jan 1, 2012
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Optimisation Opportunities for High Pressure Grinding Rolls CircuitsBy B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson
The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on
Oct 29, 2012
-
Optimised Layout And Roadway Support Planning With Integrated Intelligent SoftwareBy S. Kouniali
Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO
Jan 1, 1996