Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Piling Adjacent To Rail Tunnels At King’S Cross CentralBy David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
-
-
-
Piling Design and Construction Codes and Standards for Buildings A United States PerspectiveBy Rudolph P. Frizzi
"Abstract Pile design for building structures in the United States is typically performed by: 1) investigating and assigning engineering parameters to the respective ground bearing materials, 2) calcu
Jan 1, 2014
-
Piling Framed Tie down Concrete Retaining WallBy Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins
Jan 1, 2007
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing FacilityBy Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler
"This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in
Jan 1, 2015
-
Pillar Behaviour and Seismicity in Platinum MinesBy S. M. Spottiswoode
Crush pillars are widely used in mine workings on the Merensky Reef in the Bushveld Complex to prevent panel collapses. Crush pillars are expected to fail as or soon after they emerge from the face an
Jan 1, 2014
-
Pillar Blasting at the Murray MineIn April, 1961, a large pillar was removed by blasthole mining methods at Inco's Murray mine. More than half a million pounds of explosives were used to break 2,120,000 tons of ore in a single un
Jan 1, 1963
-
Pillar design and the associated mining engineering constraints in hard rock bord-and-pillar minesBy D. F. Malan, W. J. Theron
Practical mining aspects should be considered when conducting pillar designs for bord-and-pillar layouts. The current methodology for pillar design will result in increasing pillar sizes with depth. T
Nov 27, 2024
-
Pillar design in coal minesBy H. Wagner
The paper points out that bord-and-pillar mining is the most important method of coal extraction in South African underground coal mines, and advocates that pillar design procedures should be refined
Jan 1, 1980
-
Pillar Design in Underground MiningPillars are used in various forms in underground mining. For several decades pillar design has been an issue in both soft and hard rock underground mining. The major use of pillars is in room-and-pill
Aug 1, 2013
-
Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis
Nov 25, 2010
-
Pillar Drawing in the Sydney Coal FieldBy J. L. Jobe
In planning the operation of a new mine or new sections of an operating mine, due provision must be made for the ultimate recovery of as much of the seam as is consistent with safety and economic prin
Jan 1, 1947
-
Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)By Yanske TR, Lane WL
The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini
Jan 1, 1998
-
Pillar Extraction in Thick Coal at Canmore, Alberta, on Gradients Between 5 and 30 DegreesBy H. G. Stephenson, C. W. Gregory
"This article describes the methods used for pillar extraction in the Wilson Seam at Canmore Mines, Alberta. The Wilson Seam is extremely gassy and varies in thickness between 7 and 30 ft, with an ave
Jan 1, 1972
-
Pillar Optimization ? Post-Pillar Cut and Fill Mining in a shallow dipping Ni Sulfide deposit in Northern Manitoba, CanadaBy Angela L. Paveley
Economic viability of base metal mining is complicated by a volatile market that can cause fluctuations in the growth and stability of the mining industry. Nickel is mined primarily for use in manufac
Nov 1, 2011
-
Pillar Recovery at LamaqueBy The Mine Staff
THE PROPERTY of the Lamaque Mining Company, Limited, ?is located in the Town of Bourlamaque, seventy miles east of Noranda, in Bourlamaque township, Abitrbi county, north western Quebec. Gold produc
Jan 1, 1957
-
Pillar Recovery At The Pea Ridge Mine ? IntroductionBy J. C. Irvine
Meramec Mining Company is a joint venture by Bethlehem Steel Corp. and St. Joe Minerals Corp. which mines and pelletizes iron ore at the Pea Ridge Mine. The Pea Ridge property is located near Sullivan
Jan 1, 1976