Pillar Recovery in the Illinois BasinBy Timothy D. Gardner, Christopher Mark
Coal mines in the Illinois Basin have not engaged in pillar recovery for many decades. In large part, this is due to the exceptionally weak nature of much of the roof in the region. But, as room-and-p
Jul 1, 2023
-
Pillar Strength Adjustments in the Presence of Shear StressesBy J. A. Maritz
"The Hedley and Grant formulation for pillar strength has been widely adopted by the South Africa hard rock mining industry. Today, some forty year later, this formula still provides the foundation fo
Jan 1, 2015
-
Pillar Strength Estimation of Underground Stone Mines with Using 2D Discrete Element ModelingBy Ihsan Berk Tulu, Mustafa Can Suner
The synthetic rock mass (SRM) approach is a relatively new method to study the mechanical behavior of rock masses. Recently, an SRM approach was established to estimate pillar strength from laboratory
-
Pilot - Plant Development Of A Sulfation Process For Complex Sulfide OresBy R. E. Lund
The design, operation, and performance of an integrated pilot plant for recovering zinc and copper from a complex sulfide ore are described. Metallurgical processing comprised selective sulfate roasti
Jan 1, 1962
-
Pilot Applications of Column Flotation on Copper Re-CleaningBy Olgac Kangal, Ali Guney, Gulay Bulut, Guven Onal, Ayhan A. Sirkeci
This paper presents the results of pilot scale column flotation applications in the two different copper concentrators in Turkey. The Kure Copper Plant is located in the Black Sea Region of Turkey. In
Jan 1, 2003
-
Pilot Dense Medium Separation of Hematite FinesBy T. Moloane, C. Bergman, Heloise Thiele
"A pilot test campaign was undertaken to evaluate dense medium cyclone separation efficiencies on samples of iron ore fines (-1mm +300µm). Evaluations were done using both gas and water atomised FeSi
Jan 1, 2018
-
Pilot Evaluation of an Engineering Control to Reduce Airborne Exposure to Particulates inside Drilling CabsBy K. Morin, C. -Y. Hon, G. Lachapelle
"Air-sampling results suggest drill operators working inside environmental drilling cabs at an open-pit gold mine in Nunavut, Canada, are at risk of exposure to asbestos and silica (quartz). The autho
Jan 1, 2017
-
Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect BioleachingBy Theodore Ineich
The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required
-
Pilot Plant Demonstration of the Mintek Thermal Magnesium ProcessBy M. Abdellatif
Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace
Jan 1, 2006
-
Pilot Plant Development Of IRSID?s Magnetic Roasting ProcessBy M. Boucraut
After stating the advantages of the magnetic roasting technique as applied to iron ores, the authors report on technological research by I R S I D * in the field of magnetic roasting in fluid-bed furn
Jan 1, 1968
-
Pilot Plant Evaluation of a Hybrid Biological Leaching-Pressure Oxidation Process for Auriferous Arsenopyrite/Pyrite FeedstocksBy I. Dymov, W. Phillips
A process has been evaluated, on a continuous pilot plant scale, to treat refractory gold arsenopyrite/pyrite concentrates. The process consisted of biological leaching to partially oxidise sulphides,
Jan 1, 2004
-
Pilot Plant Experience Using Stamped Charging Of Peruvian And Imported Coal BlendsBy Jorge Madias
A Aceros Arequipa é a maior siderúrgica do Peru. A empresa opera uma planta em Pisco, com uma aciaria para 850.000 t anuais de aço líquido, e uma capacidade de laminação de 1.250.000 t anuais de produ
Oct 30, 2017
-
Pilot Plant Investigations Of High Temperature Cementation Of Copper On IronBy John G. Reid
Subsequent to extensive laboratory testing, a pilot plant was constructed to further evaluate the process for high temperature copper cementation on iron in continuous operation. The plant was designe
Jan 1, 1976
-
Pilot Plant Investigations on Cold Water of Bitumen from Alberta Bituminous Separation SandsBy L. E. Djingheuzian
Introduction For many years the immense deposits of bituminous sands of northern Alberta have been attracting the attention of our governments, engineers and .scientists ( 6). Undoubtedly these bitum
Jan 1, 1952
-
Pilot Plant Operation On Gamsberg Manganiferous Zinc ConcentratesBy Marcel F. DeGuire
Pilot plant operations are described for the treatment of manganiferous zinc concentrates from the Gamsberg ore deposit in South Africa via conventional electrolytic zinc processing. Two methods were
Jan 1, 1978
-
Pilot Plant Testing in Mineral Process Plant DesignBy Dunlop GA
Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t
Jan 1, 1990
-
Pilot Plant Testing of a New Process for Rhenium Recovery from Copper PLSBy C. Bryce
Rhenium is primarily recovered as a by-product from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations and represents a potential
Feb 23, 2014
-
Pilot Plant Testing of a New Process for Rheniumrecovery From Copper PLSBy C. Bryce
Rhenium is primarily recovered as a byproduct from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations, and this represents a poten
-
Pilot Scale Carbonization of Wallarah Coal using the Parry ProcessA pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development
Jan 1, 1963
-
Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S
Jan 1, 1963