Search Documents

Sort by

  • SME
    Pillar Recovery in the Illinois Basin

    By Timothy D. Gardner, Christopher Mark

    Coal mines in the Illinois Basin have not engaged in pillar recovery for many decades. In large part, this is due to the exceptionally weak nature of much of the roof in the region. But, as room-and-p

    Jul 1, 2023

  • CIM
    Pillar Strength Adjustments in the Presence of Shear Stresses

    By J. A. Maritz

    "The Hedley and Grant formulation for pillar strength has been widely adopted by the South Africa hard rock mining industry. Today, some forty year later, this formula still provides the foundation fo

    Jan 1, 2015

  • SME
    Pillar Strength Estimation of Underground Stone Mines with Using 2D Discrete Element Modeling

    By Ihsan Berk Tulu, Mustafa Can Suner

    The synthetic rock mass (SRM) approach is a relatively new method to study the mechanical behavior of rock masses. Recently, an SRM approach was established to estimate pillar strength from laboratory

  • SME
    Pilot - Plant Development Of A Sulfation Process For Complex Sulfide Ores

    By R. E. Lund

    The design, operation, and performance of an integrated pilot plant for recovering zinc and copper from a complex sulfide ore are described. Metallurgical processing comprised selective sulfate roasti

    Jan 1, 1962

  • IMPC
    Pilot Applications of Column Flotation on Copper Re-Cleaning

    By Olgac Kangal, Ali Guney, Gulay Bulut, Guven Onal, Ayhan A. Sirkeci

    This paper presents the results of pilot scale column flotation applications in the two different copper concentrators in Turkey. The Kure Copper Plant is located in the Black Sea Region of Turkey. In

    Jan 1, 2003

  • IMPC
    Pilot Dense Medium Separation of Hematite Fines

    By T. Moloane, C. Bergman, Heloise Thiele

    "A pilot test campaign was undertaken to evaluate dense medium cyclone separation efficiencies on samples of iron ore fines (-1mm +300µm). Evaluations were done using both gas and water atomised FeSi

    Jan 1, 2018

  • CIM
    Pilot Evaluation of an Engineering Control to Reduce Airborne Exposure to Particulates inside Drilling Cabs

    By K. Morin, C. -Y. Hon, G. Lachapelle

    "Air-sampling results suggest drill operators working inside environmental drilling cabs at an open-pit gold mine in Nunavut, Canada, are at risk of exposure to asbestos and silica (quartz). The autho

    Jan 1, 2017

  • TMS
    Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect Bioleaching

    By Theodore Ineich

    The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • SME
    Pilot Plant Development Of IRSID?s Magnetic Roasting Process

    By M. Boucraut

    After stating the advantages of the magnetic roasting technique as applied to iron ores, the authors report on technological research by I R S I D * in the field of magnetic roasting in fluid-bed furn

    Jan 1, 1968

  • CIM
    Pilot Plant Evaluation of a Hybrid Biological Leaching-Pressure Oxidation Process for Auriferous Arsenopyrite/Pyrite Feedstocks

    By I. Dymov, W. Phillips

    A process has been evaluated, on a continuous pilot plant scale, to treat refractory gold arsenopyrite/pyrite concentrates. The process consisted of biological leaching to partially oxidise sulphides,

    Jan 1, 2004

  • ABM
    Pilot Plant Experience Using Stamped Charging Of Peruvian And Imported Coal Blends

    By Jorge Madias

    A Aceros Arequipa é a maior siderúrgica do Peru. A empresa opera uma planta em Pisco, com uma aciaria para 850.000 t anuais de aço líquido, e uma capacidade de laminação de 1.250.000 t anuais de produ

    Oct 30, 2017

  • AIME
    Pilot Plant Investigations Of High Temperature Cementation Of Copper On Iron

    By John G. Reid

    Subsequent to extensive laboratory testing, a pilot plant was constructed to further evaluate the process for high temperature copper cementation on iron in continuous operation. The plant was designe

    Jan 1, 1976

  • CIM
    Pilot Plant Investigations on Cold Water of Bitumen from Alberta Bituminous Separation Sands

    By L. E. Djingheuzian

    Introduction For many years the immense deposits of bituminous sands of northern Alberta have been attracting the attention of our governments, engineers and .scientists ( 6). Undoubtedly these bitum

    Jan 1, 1952

  • SME
    Pilot Plant Operation On Gamsberg Manganiferous Zinc Concentrates

    By Marcel F. DeGuire

    Pilot plant operations are described for the treatment of manganiferous zinc concentrates from the Gamsberg ore deposit in South Africa via conventional electrolytic zinc processing. Two methods were

    Jan 1, 1978

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • SME
    Pilot Plant Testing of a New Process for Rhenium Recovery from Copper PLS

    By C. Bryce

    Rhenium is primarily recovered as a by-product from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations and represents a potential

    Feb 23, 2014

  • SME
    Pilot Plant Testing of a New Process for Rheniumrecovery From Copper PLS

    By C. Bryce

    Rhenium is primarily recovered as a byproduct from molybdenum roasting circuits. However, rhenium is also present in copper heap leach solutions at very low concentrations, and this represents a poten

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963