Search Documents

Sort by

  • SME
    Principles Of Swirl Flotation In A Centrifugal Field With An Air Sparged Hydrocyclone

    By J. D. Miller

    The effects of operating variables on water transport to the over- flow, classification of hydrophilic particles and the recovery of copper and molybdenum from a low-grade porphyry ore are presented.

    Jan 1, 1982

  • AIME
    Principles of Well Spacing

    By Morris Muskat

    ALTHOUGH the problem of well spacing is one of the most important involved in the production of oil, it must be considered at the present time as still subject to further development. The published li

    Jan 1, 1939

  • SME
    Prioritisation of Environmental Improvement Projects in Deep‑Level Mine Ventilation Systems - Mining, Metallurgy & Exploration (2023)

    By J. Swanepoel, J. H. van Laar, J. C. Vosloo, W. A. Pelser

    Deep-level underground mining costs in South Africa are continuously rising due to the increased depth at which gold is being mined, resulting in a rise in virgin rock temperature and an increase in c

    Feb 17, 2023

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012

  • CIM
    Proactive Corrosion Management and Monitoring Techniques to Improve Operations and Maintenance Strategies

    By Afshin Sadri, Wai Lai Ying, Brycklin Wilson, Zoe Coull

    "Although there have been great steps forward to integrate corrosion engineering into operations, there is still an underlying tendency for maintenance tasks to be performed in a reactive manner. This

    Jan 1, 2017

  • SME
    Proactive measures to evaluate geotechnical risk in development for deep mining – Onaping Depth Project case study

    By B. Simser, T. Butler, A. Hall

    The longterm future of Glencores’ mining operations in the Sudbury basin area of Ontario, Canada likely depends on mining deposits at depths below two kilometres. To gain a better insight into the roc

    Apr 26, 2022

  • CIM
    Proactive Mineral Waste and Acid Rock Drainage Management at Rio Tinto

    By R. K. Borden

    Rio Tinto is committed to proactive mineral waste and acid rock drainage management. Corporate requirements are closely aligned with the GARD Guide principles of early geochemical characterization and

    Jan 1, 2011

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • SME
    Proactively Improving Fluid Power Safety

    By T. R. Ley

    "INTRODUCTION Brutally honest mining executives will tell you that “safety is job #1 but.. dollars are also extremely important”. When economic times are tough, as they are now in mining, it can feel

    Jan 1, 2016

  • CIM
    Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential Usefulness

    By T. R. Kostecki, J. Hirschi

    "Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for

    Jan 1, 2015

  • AIME
    Probabilistic Analysis Of Blasting Impact On Open Pit Stability

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Probabilistic Analysis of Blasting Impact on Open Pit Stability (95ce6127-68ed-453f-9268-476a1af1dd45)

    By Dae S. Young

    A new probabilistic approach is introduced for slope stability analysis including adverse impact of blasting vibrations. The material strength within a slope area is randomized in this bi-variate join

    Jan 1, 1984

  • SME-ICGCM
    Probabilistic Approach to Coal Pillar Design

    By Ben Fahrman

    The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf

    Jan 1, 2013

  • DFI
    Probabilistic Development Of Load And Resistance Factor Design For Driven Pipe Piles In Sands: Lessons Learned

    By K. C. Foye

    Use of load and resistance factor design (LRFD) of foundations is growing, from offshore applications to bridge applications and beyond. The development of load and resistance factors for design has

    Jan 1, 2008

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • SME
    Probabilistic modeling of the Round Mountain gold deposit: A case study

    By Rodolfo Lagos, Nicos Pfeiffer, Ben Harding, Clayton V. Deutsch

    This paper outlines a cutting-edge probabilistic resource modeling workflow tailored to the Round Mountain epithermal gold deposit. The primary goal is to craft a robust and modern simulation process

    Dec 1, 2023

  • SME
    Probabilistic Modeling of the Round Mountain Gold Deposit: a Case Study - Mining, Metallurgy & Exploration (2023)

    By Rodolfo Lagos, Nicos Pfeiffer, Ben Harding, Clayton V. Deutsch

    This paper documents a probabilistic resource modeling workflow for the Round Mountain epithermal gold deposit. The set of categorical and continuous variable simulated realizations provides a model o

    Aug 19, 2023

  • SME
    Probabilistic quantification of uncertainty in predicting mine pit-lake water quality

    By J. H. Kempton, D. Atkins, W. Locke

    The scrutiny given to model predictions of pit-lake water quality has focused attention on the uncertainty associated with long-term predictions. Although comparison of probabilistic predictive modeli

    Jan 1, 2000

  • SME
    Probabilistic Quantification Of Uncertainty In Predicting Mine Pit-Lake Water Quality (8bb3ab18-1516-4bf4-9057-f861e8ded8f0)

    By J. H. Kempton

    The scrutiny given to model predictions of pit-lake water quality has focused attention on the uncertainty associated with long-term predictions. Although comparison of probabilistic predictive modeli

    Jan 1, 1998

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009