Search Documents

Sort by

  • AUSIMM
    Case Study – Underhand Cut and Fill Stoping using Cemented Tailings Paste Fill at the Lanfranchi Nickel Mine

    By J Foster

    The Lanfranchi Nickel mine is located approximately 48 km south of Kambalda in Western Australia. Mining first commenced in the mid-1970s under the previous owner, Western Mining Corporation Ltd. Afte

    Mar 21, 2011

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applicab

  • IMPC
    Case Study: Advantages of High Rate Thickening at TISCO Jianshan Iron Mine

    By T. Gong

    Often plans to increase plant throughput provide an opportunity for optimising plant equipment and operating methods. This was the case in 2005 at TISCO Jianshan Iron Mine, when an increase in product

    Jan 1, 2014

  • ISEE
    Case Study: Blasting with Air Decks to Maintain Performance While Saving Costs

    By Brian Lewis, Reinhold Daykin Schnell

    Blasting is the primary and most effective method for breaking and moving material at most mine sites. The blast design is often adjusted in efforts to optimize the effectiveness of the blasts’ explos

    Feb 6, 2023

  • SME
    Case study: correcting control problems on Essroc’s multidrive station, horizontally curved conveyor - SME Transactions 2013

    By A. Jennings, J. Cornet, P. Perrone

    Controlling long overland conveyors with multiple drive stations is a complex problem. The methods for controlling these belts in a steady state are well-covered in existing literature, but a discussi

    Jan 1, 2013

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • SME
    Case Study: Improved Bit Life Utilizing Advanced Cryogenics in Drilling and Blasting - SME Annual Meeting 2024

    By Jenna Wundrack, Evan Thibaud

    The advanced cryogenic treatment is a post-manufacturing metallurgical process that involves subjecting off-theshelf materials to extremely low temperatures, significantly improving wear resistance an

    Feb 1, 2024

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters

    By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula

    "This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat

    Jan 1, 1900

  • DFI
    Case Study: Natomas Levee Improvement Program Cutoff Walls

    By Matthew D. Marks

    "The Sacramento Area Flood Control Agency initiated the Natomas Levee Improvement Program in 2006 which would bring the entire 42 mile Natomas Basin perimeter levee system into compliance with applica

    Jan 1, 2017

  • TMS
    Case Study: Quality Improvement of Recycled Aggregates from a Construction and Demolition Waste Recycling Pilot Plant

    By Maria Margarida Lima, Maria Lucelinda Cunha, Dora Algarvio

    "The main goal of the present work is the quality improvement of the recycled aggregates produced by a construction and demolition waste (C&DW) recycling facility located in Montemor-o-Novo, Portugal.

    Jan 1, 2008

  • DFI
    Case Study: Soil Setup For Piles Driven Into Eastern Coastal Plain Deposits In Virginia

    By Sushant Upadhyaya, Deniz Karadeniz, Ahmed Mohamed

    Soil setup analysis provides opportunities for efficiencies in pile foundation design and installation. Soil setup gain with time was evaluated as part of the foundation design and installation for tw

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • ISEE
    Case Study: Systematically Improving Drilling and Blasting Operations in Hard-Rock Mines

    By Reinhold Daykin, Piers Wendlandt, Nathan Rouse

    Drilling and blasting are key components of every hard-rock (i.e., metal/nonmetal/coal) mining operation. Well-executed and maintained drilling and blasting can have a major positive impact on the ove

    Feb 1, 2020

  • ISEE
    Case Study: Technology Application for a Hardness Model in Minera Caserones

    By Hernan Navea, Carlos Alvarado, Exequiel Nuñez, Matías Suarez, Jhon Silva, Bryan Townsend, Bryan Caceres, Felipe Pontanilla

    Nowadays, technology dominates all aspects of human activities, and drilling and Blasting (D&B) is no exception. In most cases, the use of technology in D&B is focused on controlling individual activi

    Jan 21, 2025

  • DFI
    Case Study: The Use Of Post Tensioned Piles For Wind Turbine Foundations

    By Amr Sallam, Ahmad Mohamed, Mohamed Alrowaimi

    Renewable energy, in the form of wind and solar, has emerged as main source of energy in the modern society. The wind industry has substantially grown over the last two decades to become a key player

  • CIM
    Case Study: Using Polymer Ducting for Face Ventilation of Coal Mines

    By Bryon Cerklefskie, Michael Schulte

    "This case study explores the usage of polymer ducting as a replacement to curtains and FRP for face ventilation in two coal mines. There are two mines looked at, one is the highest elevation undergro

    Jan 1, 2019

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions

    By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen

    Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t

    Jan 1, 2019