Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computer-Aided Design of Zinc Die Casting DiesBy Nguyen T. T, Williams A. M, Siauw T. H
During the last 20 years the CSIRO Division of Manufacturing Technology, through its research and development program, has made a substantial contribution towards understanding the pressure die cast
Jan 1, 1993
-
Computer-Aided Microscopy of Advanced MaterialsBy John J. Friel
Digital imaging systems are particularly useful in microscopy, because they make it possible to extract information not readily accessible by manual methods and to display that information clearly. Co
Jan 1, 1992
-
Computer-Aided Mine Fire Sensor Data Interpretation In Real TimeBy L. W. Laage
Throughout recorded history, underground fires have plagued mining operations. Compared with other hazardous situations in underground mining, a fire can become a global problem by swiftly spreading d
Jan 1, 1989
-
Computer-Aided Modeling and Control of Autogenous Copper Smelting ProcessBy A. V. Tarasov, V. M. Paretsky
"Based on theoretical and experimental studies into the specific features of the mechanism, kinetics, aerodynamics and heat transfer parameters of the flame-type oxidation of metal sulfides in a strea
Jan 1, 2001
-
Computer-Aided Optimization Of Mineral Processing Plants, A Case Study: Increasing The Capacity Of The Shila Gold Mine, PeruMineral processing plant operators are faced with the necessity to choose between many different possibilities for plant improvement. Only a few such possibilities, however, can be tested on the indus
Jan 1, 1993
-
Computer-Aided Regional Planning For Mineral ResourcesBy William C. Brice
Minnesota is involved in planning controversies related to taconite and potential copper-nickel mining. Mine facility planning includes the Reserve dining on-land tailings disposal issue and the poten
Jan 1, 1977
-
Computer-assisted control of the Noranda ProcessBy Y. Prevost, D. Verhelst
"A computer-assisted process control system for the Noranda Process Reactor Wa5 installed at the Home smelter in 1991. Operating as an advisory tool for the furnace operators, and using a flexible oxy
Jan 1, 1993
-
Computer-Assisted Layout Of In-Pit Crushing/Conveying SystemsBy J. E. Lonergan
The in-pit placement of crushing and conveying equipment results in a flattening of the pit slope of a multiple-bench open pit mine. To maximize the economic benefit of lower haulage costs associated
Jan 1, 1985
-
Computer-Automated Radiometric Analysis For The Monitoring And Control Of Mineral Processing PlantsBy M. R. Wormald
A real time data acquisition system has been developed for implementing standard radiometric analytical techniques, applied to the monitoring and control of mineral processing plants. The system u
Jan 1, 1986
-
Computer-Based Monitoring And Control Of A Mast-Type Roof DrillBy M. P. Hoffman
The U.S. Bureau of Mines is developing a roof bolter with a computer-controlled drill head that will increase the safety of roof bolting in underground coal mines by allowing miners to be relocated to
Jan 1, 1994
-
Computer-based reserve estimation and grade control: practitioners' viewsBy P .. H. Grimley, N. Champigny
"Fourteen companies (Appendix) representing senior mining organizations in Canada were canvassed in order to assess: (1) the current usage and trends, and (2) the usefulness of computer applications i
Jan 1, 1990
-
Computer-Based Resource Estimation in Accordance with the 1999 JORC CodeBy P Hanna
Following the Busang fiasco, more detailed guidelines were appended to the latest revision of the JORC Code released in September 1999 (JORC, 1999). Although the definitions and terminology essentiall
Jan 1, 2000
-
Computer-Based Simulation of the Construction Process in the Anode Baking FurnacesBy C. Gaubert, G. Bourassa
"The construction or rebuild process in the anode baking furnaces has been modeled with the software Rockwell Arena, in order to minimize the process cost and risk. The case study was focused on the s
Jan 1, 2006
-
Computer-Controlled Hydrocyclone Battery With Maximum Solids RecoveryBy H. Tiefel, M. Schneider, T. Neesse, J. Regler, J. Dueck, F. Donhauser
In practice the advantages of high-quality hydrocyclone separation are often reduced due to varying feed suspension properties, solids concentrations and particle size distributions. Control systems o
Jan 1, 2003
-
Computer-Generated Main Fan Performance Curves For Various Operating ConditionsBy Jerry L. Fuller
Fan performance graphs are generated by digital computer using two programs, RUN- FANS and FANPLOT. RUNFANS calculates fan performance data from stored specific-volume, specific-speed data for a given
Jan 1, 1984
-
Computer-Oriented Data Storage And Retrieval Systems In Mineral ExplorationBy Paul I. Eimon
Mineral exploration involves the selective collection, organization, evaluation, and interpretation of geologic and economic data. The sources for such data are original field observations and existin
Jan 1, 1968
-
Computerised Design of Underground MinesHaving successfully applied computer techniques to open pit mining applications, many software developers are now using their skills to tackle the much harder areas of underground mine design, plannin
Jan 1, 1992
-
Computerized Control for a Cooling Tower at Asarco's Amarillo Copper RefineryBy B. Willit, J. Martin
"Continued emphasis on water and energy conservation with less operator attention has created a need for more sophisticated cooling tower controls. A joint Betz/ASARCO project has produced a computeri
Jan 1, 1989
-
Computerized Design Of Comminution CircuitsBy J. A. Herbst
A state of the art computer simulation package, named UTAH-MODSIM is being developed. This package can run on a mainframe (eg. UNIVAC) as well as on a microcomputer (eg. IBM/PC with at least 512 kByte
Jan 1, 1986
-
Computerized Fire Monitoring, Criteria, Techniques, And Experience At Inco LimitedBy J. S. Stachulak
Installation of a computerized mine monitoring and control system in two planned construction phases began in 1983. Phase one consisted of providing a central monitoring station located on surface for
Jan 1, 1989